The Travancore Cochin Chemicals Limited Tender
... More
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 10,850Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_TCCL_626610_1Bid Award Id
ViewTender No
TCCL/WC/C/951/2023Tender Authority
The Travancore Cochin Chemicals Limited ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Supplying and fixing gutters made of UPVC in required sizes and shapes of minimum 300 mm bottom wide trapezoidal shapes after providing necessary supporting systems and down water pipe connectivity including cost of all material brackets, all labour charges and all other incidental expenses, all cost of screws, rubber washer, sealants etc. safety precautions at contractors risk and cost. All cost of UPVC make moulded to shape with required number of spouts as directed and other incidental etc.
40
-
-
... More
Fixing down water pipes to the required locations using PVC pipes and clamps including all labour charges, hire for tools and plants, all safety precautions at contractors risk and cost etc complete.(Required pipes issued free of cost by TCC
20
-
-
... More
Fixing roofing, side cladding with Galvalume sheets of required size and shape in required position, lifting sheets to position, bolting with self driven fasteners SDF 55 mm screws class 3 of roofix, TATA make or roofing bolt with rubber washer,etc. at corrugated portion only, sealing bolt holes with sealants, all safety precautions for men and materials, at contractor's risk and cost, all labour charges and all other incidental expenses, all cost of screws, rubber washer, sealants etc complete.(Required Galvalume sheet will be issued by TCC)
780
-
-
... More
Fabricating, erecting, setting, bolting/welding in position light weight GI square tubular sections using 25x25 mm size on the top of exsisting rafter/purlin as per the instructions , drawings and elevations upto 20 m ground level including lifting, straightening, marking, cutting, drilling, holing, welding, bolting, covering ends of circular/tubular sections etc., all as per standard practices, scrapping thoroughly to remove rust, painting with one coat primer paint and two coats chlorinated rubber paint, including all labour charges, hire for tools, plants, welding sets, gas cutting equipment’s, derricks, tackles, all safety precautions to workers including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety net at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors rick and cost, as per approval of TCC., materials, pipe lines, cables, all cost of consumables such as welding rods, cutting gas etc., complete. (GI tubes,pipes and paint will be issued free of cost by TCC)
1310
-
-
... More
Pulling and Fixing of steel rope for life line through which fabricated structure and bolting at the both ends including all safety precautions to men and materials like safety belt &temporary life line for hooking safety belt wherever necessary,safety helmet etc., at contractor's risk and cost, all labour charges, hire for tools and plants, all other incidental expenses etc., complete.(6 mm wire rope will be supplied by TCC at free of cost)
40
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements