Technopark Tender
... More
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Technopark Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date20 Nov 2023
Closing Date18 Dec 2023
Tender Amount₹ 2,85,78,807
Costs
EMD
₹ 1,00,000Document Cost
₹ 8,850Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_ETPK_623591_1Bid Award Id
ViewTender No
ETPK/TC/192/2023-24Tender Authority
Technopark ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Plastering with cement mortar 1:6(1 cement & 6 sand) 12mm thick one coat floated hard and trowelled smooth for inside and outside walls including cost and conveyance of all materials to site, labour charges, hire charges for scaffolding, watering for curing, etc. complete for all floors for all heights as per the direction of engineer in charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge.
6175.84
-
-
... More
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for serarately) :- Payment to be made per metre cost of total length of barbed wire used. As per the direction of engineer in charge. With G.I. barbed wire. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc. for all heights complete as per the direction of engineer in charge.
12826
-
-
... More
Pumping or Bailing out water and removing slush etc by using pumpset including cost of labour,oil, hire charges of pumpset,etc complete. As per the direction of engineer in charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc. for all heights complete as per the direction of engineer in charge.
23.96
-
-
... More
Centering and shuttering including strutting, etc. and removal of form for: Lintels, beams, plinth beams, girders bressumers and cantilevers. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc. for all heights complete as per the direction of engineer in charge.
1452
-
-
... More
Dry rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 ( 1 cement : 6 coarse sand: 12 graded stone aggregate 20 mm nominal size) including cost of through stone and bond stone. As per the direction of engineer in charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc. for all heights complete as per the direction of engineer in charge.
1161.6
-
-
... More
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo - Mechanically Treated bars. As per the direction of engineer. All work above plinth level upto floor V level. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc. for all heights complete as per the direction of engineer in charge.
3186.16
-
-
... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work for MS angle and post over compound wall, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc. for all heights complete as per the direction of engineer in charge.
6969.6
-
-
... More
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 3km. As per the direction of engineer in charge. All kinds of soil in or under water and/or liquid mud,
including pumbing out water as required. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc. for all heights complete as per the direction of engineer in charge.
2178
-
-
... More
PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete. The lenght will be same as the foundation width. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc. for all heights complete as per the direction of engineer in charge.
1391.5
-
-
... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 3km and lift up to 1.5 m. As per the direction of engineer. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc. for all heights complete as per the direction of engineer in charge.
653.4
-
-
... More
Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 3km and lift up to 1.5 m as per direction of site Engineer-in-charge in or under water and/or liquid mud, including pumbing out water as required. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc. for all heights complete as per the direction of engineer in charge.
726
-
-
... More
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish outside Technopark Campus. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc. for all heights complete as per the direction of engineer in charge.
2200
-
-
... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size) The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc. for all heights complete as per the direction of engineer in charge.
72.6
-
-
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size). As per the direction of engineer in charge. for laying concrete in or under water and/or liquid mud including cost of pumping or bailing out of water and removing slush etc. complete upto to a depth 2.50 metre from ground level. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc. for all heights complete as per the direction of engineer in charge.
145.2
-
-
... More
Hollow block masonry using pre cast blocks ( Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure aboveground level upto floor five level with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc. for all heights complete as per the direction of engineer in charge.
562.72
-
-
... More
Painting on G.S. sheet/ Angle iron post with synthetic enamel paint of approved brand and manufacture of required colour to given an even shade. As per the direction of engineer in charge. New work (two or more coats) including coat of approved steel primer but excluding a coat of mordant solution. As per the direction of engineer in charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc. for all heights complete as per the direction of engineer in charge.
290.4
-
-
... More
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material and removing all scrap material outside Technopark campus. Beyound 60 cm girth up to and including 120 cm girth. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc. for all heights complete as per the direction of engineer in charge.
50
-
-
... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris outside Technopark campus etc. for all heights complete as per the direction of engineer in charge.
117.98
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements