Opening Date10 Sep 2024
Closing Date3 Oct 2024
Tender Amount₹ 15,85,40,831.22 
Notes
Download

Costs

Summary

Provision Of Grid Connected Roof Top Solar Plants At Railway Stations, Staff Quarters, And Lc Gates Over Hubballi Division'

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation in trenches in any kind of soil of required width for HT 11 KV & LT UG cables, including 01 excavation for joints and dressing of sides, ramming of bottoms, depth up to 1.5 m as directed, including getting out the excavated soil, and returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing off surplus excavated soil as directed, within a lead of 50 m from the starting point.

1800

201

363384

... More
Supply and Laying of high density polyethylene pipe (HDPE pipe) of size 110 mm (OD) category of PE-80, PN-6 along with accessories (T joint / straight coupler etc.) of ISI approved as per specification

4000

364

1456000

... More
Transportaion, Laying, testing and commissioning of LTUG cable 4cx25 / 4cx16 / 4cx35 / 4cx50 sqmm as per specification.

3700

15

55500

... More
Transportation, Laying, testing and commissioning of LTUG 4cx95/ 4C x 120 sqmm as per specification.

800

30

24000

... More
Transportation, Laying, testing and commissioning of LTUG 4cx 240 / 4C x 400 sqmm as per specification.

700

56

39599

... More
Supply, fixing and commissioning of HT Metering Panel 3 CT & 3 PT, for 3 phase 4 wire metering 06 with transparent cover TTB with 30 x 8 mm Cu Busbars (HT metering Box fabricated out of 3 mm MS sheet duly epoxy powder coated) with load break switch (3 phase 4 wire DLMS compatible) CT 11 KV ratio 10/1 A 0.2 s class accuracy 2.5 VA burden with complete foundation and as per HESCOM specification.

4

253901

1015604.72

... More
Supply and making end termination with brass compression gland and aluminium lugs for 4 x 400 sqmm size of PVC insulated and PVC sheathed / XLPE aluminium conductor cable of 1.1 KV grade.

8

1556

12448

... More
Supply and making end termination with brass compression gland and aluminium lugs for 4 x 240 sqmm size of PVC insulated and PVC sheathed / XLPE aluminium conductor cable of 1.1 KV grade.

24

1027

24648

... More
Supply and making end termination with brass compression gland and aluminium lugs for 4 x 120 sqmm size of PVC insulated and PVC sheathed / XLPE aluminium conductor cable of 1.1 KV grade.

40

613

24520

... More
Supply and making end termination with brass compression gland and aluminium lugs for 4 x 50 sqmm size of PVC insulated and PVC sheathed / XLPE aluminium conductor cable of 1.1 KV grade.

50

418

20900

... More
Supplying and making end termination with brass compression gland and aluminium lugs for 25 Sqmm size, 4 core PVC insulated and PVC sheathed /XLPE aluminium conductor cable of 1.1 KV grade as specified and directed.

80

315

25200

... More
Trenchless cutting to lay the LTUG/HTUG cable (LT 11 KV and 33KV ) for crossing the track/road 12 duly drawing 160 mm (OD) size PE80,PN.6 HDPE pipe ISI approved as per instruction of Engr. In-charge (Scope includes cost for horizontal drilling, cost of pipe and laying of pipe etc. but charge for laying of cable is not included).

200

1805

361000

... More
Cutting of cement concrete (PCC) surface, any type for laying of UG cables in trenches and disposing off the excavated material as directed including barricading, danger lighting and refilling the trenches in layers and consolidating complete all as specified and directed.

7

1078

7546

... More
Comprehensive Annual Maintenance Contract for On-Grid roof top Solar power plants of varying 01 capacity installed at Railway stations, staff quarters, and LC gates over Hubballi division under the schedules SW- I, SW-II & SW-III above for a period of 5 years. CAMC will commence after completion of 36 months Maintenance period i.e. with effect from the 4th year of commissioning of solar Plants. All as per detailed tender specifications. For 1st year (Up to first 12 months).

2150

2006

4312900

... More
Comprehensive Annual Maintenance Contract for On-Grid roof top Solar power plants of varying 02 capacity installed at Railway stations, staff quarters, and LC gates over Hubballi division under the schedules SW- I, SW-II & SW-III above for a period of 5 years. CAMC will commence after completion of 36 months Maintenance period i.e. with effect from the 4th year of commissioning of solar Plants. All as per detailed tender specifications. For 2nd year (From 12 to 24 months)

2150

2106

4528545

... More
Comprehensive Annual Maintenance Contract for On-Grid roof top Solar power plants of varying 03 capacity installed at Railway stations, staff quarters, and LC gates over Hubballi division under the schedules SW- I, SW-II & SW-III above for a period of 5 years. CAMC will commence after completion of 36 months Maintenance period i.e. with effect from the 4th year of commissioning of solar Plants. All as per detailed tender specifications. For 3rd year (From 24 to 36 months)

2150

2211

4754961.5

... More
Comprehensive Annual Maintenance Contract for On-Grid roof top Solar power plants of varying 04 capacity installed at Railway stations, staff quarters, and LC gates over Hubballi division under the schedules SW- I, SW-II & SW-III above for a period of 5 years. CAMC will commence after completion of 36 months Maintenance period i.e. with effect from the 4th year of commissioning of solar Plants. All as per detailed tender specifications. For 4th year (From 37 to 48 months)

2150

2322

4992708.5

... More
Comprehensive Annual Maintenance Contract for On-Grid roof top Solar power plants of varying 05 capacity installed at Railway stations, staff quarters, and LC gates over Hubballi division under the schedules SW- I, SW-II & SW-III above for a period of 5 years. CAMC will commence after completion of 36 months Maintenance period i.e. with effect from the 4th year of commissioning of solar Plants. All as per detailed tender specifications. For 5th year (From 49 to 60 months)

2150

2438

5242366.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.