South Western Railway Tender

View complete overview of South Western Railway Tender

South Western Railway Tender

Works
Civil And Construction
Bridge Construction
Ireps
NA
Opening Date10 Jan 2025
Closing Date12 Feb 2025
Tender Amount₹ 22,00,41,927.19 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Please see item Break up for details

-

-

23978739.6

... More
Please see item Break up for details

-

-

63981250.24

... More
Please see item Break up for details

-

-

7021475

... More
Please see item Break up for details

-

-

36374554.88

... More
Please see item Break up for details

-

-

546023.5

... More
Please see item Break up for details

-

-

1596522.24

... More
DECK SHEETING: 1. Designing, supplying, fabricating and providing of trapezoidal roll formed deck sheeting profiles of 70mm depth made of galvanised steel troughed metal decking plate over cross girders/supports for cast-in-situ deck slab of ROB. Thickness of deck plate shall be 1.00mm (minimum) and shall serve as permanent shuttering to deck slab of 250mm (max) thickness measured over crest of metal decking and shall have adequate strength to support the weight of green concrete and imposed loads during concreting over a span of 2000mm between supports. Deck sheets to be 1 embossed to facilitate enhanced sheet to concrete bonding with contractor's all materials, men, equipment, tools and plant, fixing arrangements, all lead and lift and the work to be carried out above Railway tracks and 25 KV OHE electrified area without affecting Railway traffic and damage to Railway properties as directed by Engineer-in-charge. NOTE: 1. The rate includes submission of manufacturers design calculations/test reports, technical details and the supply to be taken from reputed manufacturing firms. Note:1) The thickness of sheet to be increased if required, no additional payment shall be paid on this account. 2) A suitable sample field test shall be given at site to the designed loads at free of cost.

360

1803

649080

... More
Design of super-structure for bridges (water way bridges/ROB/RUB including major bridge) as per latest loading standards for a single line BG track, preparation of detailed structural and 2 working drawings with bar bending schedule. Design to be done by recognised/reputed consultant and proof checked by another recognised consultant like IIT, Stup consultants etc., submitting approved drawings on a tracing film/latest tracing material and compact disk alongwith 6 copies of final working drawings, structural drawings and designs calculations with contractors labour, tools, plants, etc., and as directed by Engineer-in-charge.

1

115000

115000

... More
BASE PIPE FOR FIXING OF ELECTRICAL POLES : Providing and fixing MS/GI pipes 150mm dia(inner dia) for fixing the electrical poles to the crash barrier including all materials, labour, lead and lift with two coats of red-oxide paint and basement, poles should be welded with base plate complete as per the direction of Engineer-in-charge

6

2150

12900

... More
JUNCTION BOX: Supplying and fixing junction box of size 18x9x6 made of 18 gauge MS plate with clamping arrangement to fix the connectors inside the box as per the drawing and instruction of Engineer-in-charge.

6

953

5718

... More
Excavation along the alignment of signalling cable/OFC/power cable carefully and exposing the same without any damage, and excavating the new trench along the railway alignment 5 or along the alignment as specified by the railway Engineer-in-charge, laying or removed cable, filling up all complete with sand and laying a layer of brick with contractor's own material, tools and plants etc., as directed by the Engineer-in-charge. NOTE:- 1 In case the cable is damaged cost of restoration and the cost of cable will be recovered from the contractor. The decision of the railways with regard the cost to be recovered will be final.

48

207

9936

... More
Fabrication, Transportation and supply of steel cribs to SSE/Works/CN/Mysuru unit, as per standard drawing RDSO/B-1484/ 4R1 with engineering rolled steel products such as angles, plates, flats etc by drilling/welding, including 2MS clamps with bolts for each crib with all contractors steel 6 confirming to IS-2062-1962 Grade B and including one coat of ready mix zinc chromate yellow primer to IS-104 followed by one coat of Red oxide zinc chromate primer to IS-2074 and two coats of finishing coat of Red oxide paint to IS-13607 with approved colour/shade, including careful loading and unloading, leading stacking of materials without causing any damage to the railway properties with all contractor's paint, tools and plants, labour, machinery etc., complete as directed by the Engineer-in- Charge. (a)200cribs x 0.184 MT = 36.8MT (Say 40MT)

20

87405

1748100

... More
Preparation and submission of GAD / Completion drawing for the Major bridges / ROBS / RUBs 8

1

14427

14427

... More
Structural design and preparation of detailed structural and working drawings 9

1

90000

90000

... More
Extra over item 1a for lead beyond 100kms up to total lead of 200 kms.

2

-

3000

... More
Trucking / Transportation of Rails of any section /size / type from mid section / yard for 17 a Lead more than 1 km and up to 8 km during day / night under rail traffic block by dip lorries / rail lorries / any other approved means as per IRPWM including loading at the place of picking, hauling, unloading and placing them without infringing running traffic after trucking including protection of track with contractor's flagmen, wherever required, and; (ii) Stacking the rails. 18

50

260

13000

... More
Supply and Laying concrete Canvas of 5mm thickness

80

5302

424208

... More
Fabrication,assembling andsupply of RCC/PSCC pole 9mtr. / 9.10 mtr.long HT single pole structure scope includes 2way cross arm with single top support with 11KV pin insulator /shackIe insulator- 3 Nos. as per specification

5

7800

39000

... More
Supply of LTUG Cable with Alu conductor,XLPE insulated and armoured, 4 x 25 sqmm as per IS-7098

1400

177

247800

... More
Laying of 4 x 16- 50 Sq mm LTUG cable with aluminium conductor including end t*rminations at both ends. This work includes Extension of power supply from the nearest power supply source in the excavated cable trench/in trough/on building walls/sheds/shelters etc as per IS:1255

1400

12

16800

... More
Fabrication, assembling, supply and fixing of LT meter box outdoor type of size appx.900x450x250mm made of 16 SWG CRCA sheet powder coated comprising of 63A FP MCB- 1 No. 40A FP MCB - 1 No, 32A FP MCB - 1 No, 32A contactor, 24 hrs. timer, 63A cutouts - 3 Nos and neutral ink etc, with 6mm thick hylum sheet fixed inside to mount the accessories with provision for fixing 1 No. of three phase KWH meter with pad locking arrangements (Scope doesnot include supply of KWH meter)

-

-

4

... More
Supply of three phase electronic energy meter 40A capacity (meter shall be purchased from ESCOM authority)

1

3700

3700

... More
L.T. Earthing arrangements for hard soil using 50 mm C-Class GI Pipe- 2.7 Mtr length, 6 soil treatment by spreading of 25 kgs each of salt and charcoal, duly painting eath pit with black paint and stenciling of earth resistance value with date, including supply and laying of 6 SWG G.I. wire and other hardware to connect equipment at site complete.

5

6348

31740

... More
Excavation of cable trench, 450 mm. wide and 1000 mm. deep in all types of soil and refilling the cable trench as per detailed specification.

300

201

60300

... More
Supply of HDPE pipe of dia 50 mm grade PE-100 with pressure of PN 6 for safety of cables 9

300

70

21000

... More
Laying of HDPE Pipe of grade PE-100 with 'reSSU'2 of PN 6 for safety of cables

300

18

5400

... More
Supply of rigid PVC pipe 75mm innner dia heavy duty including clamp bolt nuts and washers for raising LT cable protection. 11

1200

270

324000

... More
Fixing of cable protection PVC pipe 75mm/50 mm dia

1200

60

72000

... More
Fabrication, supply and Erection of swaged tubular pole 9 mtr. Bottom H1 - 5 mtr, 12 (139x5.4 thickness) Middle H2-2 mtr. (114x4.5 thickness) Top H3 - 2 mtr. (88.9x3.65 thickness) with bracket 1000mm overhang. Pole has to be coated with one coat of zinc primer and PU silver including welding along with single arm bracket (before supply of this item contractor shall obtain permission from Sr.DDE/MYS)

46

12500

575000

... More
Fabrication and supply of one additional arm adjustable with suitable bracket, clamp, etc for the above 9 meter pole.

20

900

18000

... More
"Supply and fixing of 72 watts LED street light fitting with driver circuit as per specification SWR/LED LIGHT FITTING(Indoor/outdoor)/001-2016 effective from 18.04.2016 or latest."

66

7000

462000

... More
Erection of RCC pole 9 Mtr. Long HT / LT, single pole structure with cross arm and insulators including excavation of pit in all type of soil including hardrock and concreting as per specification

5

1900

9500

... More
Earth work by excavation of pit for Ci foundation to erect the HT/LT poles (forDP/SPstructures) / RCC spun pole / strut pole / stay set /including all type of poles in any type of soil (forLT, °l1KV and 33KV category)

5

190

950

... More
Carrying out /provision of CC foundation of 1:3:6 ratio for erecting poles of SP/DP structure (for LT, 11 KVand 33 KVcategory) / strutpole / stay set foundation including shuttering as required as per specification 18

50

2900

145000

... More
Corresponding charges for availing Load in KW etc

2

10000

20000

... More
Supply of PVC conduit pipe 25mm dia wall thickness 2 mm ivory/grey in colour as per speciifcation. 20

100

40

4000

... More
Fixing of PVC conduit pipe 25mm dia 21

100

12

1200

... More
Supply laying and connecting wiring of 3X1.5 S'ITIM copper wire for poles.

420

60

25200

... More
Supply and fixing of LT cable terminal sintex box of size 333X233X120 mm Model No. GSJB 3020 hinged door with 32 A strip connector. 23

-

-

22

... More
Supply of ACSR Rabbit conductor 7/3.35 mm size 24

750

70

52500

... More
Stringing of ACSR Rabbit conductor. 26

750

20

15000

... More
Supply, Erection and Commissioning of PSCC pole 8 m long, 200kg wt 27

3

4649

13947

... More
Supply, Erection and Commissioning of Horizontal x arm, HTST, Clamp & bolt nuts 28

1

790

790

... More
Supply, Erection and Commissioning of 4 pin x arm, HTST, Clamp & bolt nuts 29

5

561

2805

... More
Supply, Erection and Commissioning of 11 composit pin Insulator 30

1

663

663

... More
Supply, Erection and Commissioning of 45 kn polimer disc insulator 31

6

202

1212

... More
Supply, Erection and Commissioning of 1.1kV GI pin only 32

12

37

444

... More
Supply, Erection and Commissioning of 1.1kV shell only 33

12

28

336

... More
Supply, Erection and Commissioning of PSCC pole 9 m long, 200kg wt 34

1

5617

5617

... More
Supply, Erection and Commissioning of 8kV strain insulator 35

6

25

150

... More
Supply, Erection and Commissioning of Rabbit wire with 1.5 % sag 36

0.32

-

20740.48

... More
Supply, Erection and Commissioning of Guy rod 37

6

713

4278

... More
Supply, Erection and Commissioning of Guy wire 38

30

80

2403.6

... More
Releasing & Re-erection of 8mtr poles 39

7

2034

14244.02

... More
Releasing & Re-fixing of of X arm 40

9

231

2086.02

... More
Releasing & Re-erection of Rabbit conductor 41

0.59

-

3698

... More
Loading and unloading of poles 42

4

106

424

... More
Misc Materials US 43

-

-

160

... More
Supply, Erection and Commissioning of RCC pole 9 mtrs long 145 kg W/L 44

4

8987

35948

... More
Supply, Erection and Commissioning of PSCC pole 9 mtrs long with 300 kg WL

7

6391

44737

... More
Supply, Erection and Commissioning of Horizontal x arm with clamps, HTST for PSCC poles 46

6

786

4716

... More
Supply, Erection and Commissioning of 11kV, SKN Polymeric Pin Insulator 47

6

221

1326

... More
Supply, Erection and Commissioning of 11kV, 45KN Polymeric Insulator 48

18

202

3636

... More
Supply, Erection and Commissioning of 4 pin cross arm with bolts, nuts & washer's 49

7

557

3899

... More
Supply, Erection and Commissioning of 8 KV strain insulator

24

25

600

... More
Supply, Erection and Commissioning of 1.1 KV Pin Insulator with GI pin 51

-

-

50

... More
Supply, Erection and Commissioning of Bolts and nuts 52

5

103

515

... More
Supply, Erection and Commissioning of Guy set complete with No.15 strain insulator 53

8

1657

13256

... More
Supply, Erection and Commissioning of Guy set complete with No.8 strain insulator 54

5

1627

8135

... More
Supply, Erection and Commissioning of Rabbit ACSR conductor for jumps & joints 55

0.22

-

14259.08

... More
Releasing & Re-stringing of Rabbit ACSR conductor 56

-

-

2821

... More
Releasing & Re-stringing of 2/4 ACSR conductor 57

-

-

5058

... More
Releasing & Re-fixing of 4 pin X arm 58

-

-

1391

... More
Releasing & Re-fixing of Horizontal cross arm 59

-

-

464

... More
Loading and unloading of 9mtr PSCC poles

11

106

1166

... More
Excavation of cable trench in all kinds of soil except hard rocky areas including clearing of roots of trees rocks, bushes etc. to a depth of 1.0Mtrs and to a width of 0.3 Mtrs. Laying of cables is not included in this schedule.

1000

34

34650

... More
Excavation of trench to a depth of 1 Mtr. for track crossing of cables, laying of DWC/ RCC pipes with collar/coupling, refilling of trench by ramming and consolidating it as per the 2 instructions of Railway representative at site. During excavation of trench it has to be ensured that the excavated soil does not mix with the ballast available. The depth of 1m trench shall be from the bottom of sleepers for track crossings. Laying of cables is not included in this schedule. (Supply of DWC/RCC pipes with couplers/ collars is not included in this schedule).

10

208

2083.5

... More
Excavation of trench to a depth of 1 Mtr. for road crossing of cables, laying of DWC/ 3 RCC pipes with collar/ coupling, refilling of trench by ramming and consolidating it and resurfacing it to the original position. Laying of cables is not included in this schedule. (Supply of DWC/RCC pipes with couplers/ collars is not included in this schedule).

10

270

2708.3

... More
Provision of GI pipes (50/100mm dia) for cable laying with offset at both ends and with couplings over RCC Bridges/ Drainage/ Culverts with concrete masonry supports of size 300mm x 300 4 mm x 300 mm at an interval of 2m. The ends of the pipes shall be closed with brick masonry abutments work so that no cable is exposed, The work shall be carried out as per the instructions of Railway representative at site. (Supply of GI pipes with couplings and laying of cables is not included in this schedule). [Stone jelly of size 20/25mm, bricks, sand, cement and all other miscellaneous materials required for the work shall be supplied by the Contractor].

15

181

2729.25

... More
Provision of GI pipes-(50/100mm dia) for cable laying with offset at both ends and with couplings over girder bridges by fixing on suitable MS Clamps at an interval of 2 Mtrs. The ends of the 5 pipes shall be closed with brick masonry abutments work so that no cable is exposed, The work shall be carried out as per the instructions of Railway representative at site. (Supply of GI pipes with couplings and laying of cables is not included in this schedule). [MS angles, flats, bolts and nuts for manufacturing fixing clamps, bricks, river sand , cement and all other miscellaneous required for the work shall be supplied by the Contractor].

15

215

3228.75

... More
Provision of GI pipes (50/100mm dia) for cable laying in hard rocky area with off sets at both ends duly supported by concrete blocks of size 300mm x 300 mm x 300 mm at an interval of 2m. The ends of the pipes shall be closed with brick masonry abutments work so that no cable is exposed, The work shall be carried out as per the instructions of Railway representative at site. (Supply of GI pipes with couplings and laying of cables is not included in this schedule). [Stone jelly of size 20/25mm, bricks, sand, cement and all other miscellaneous materials required for the work shall be supplied by the Contractor].

-

-

6

... More
Laying of signaling/power/telecommunication cables as per cable plan in cable trenches, masonry ducts, RCC Pipes, DWC pipes, GI Pipes etc. (Supply of cables is not included in this schedule).

4000

9

39320

... More
Refilling of cable trench 1m depth by 0.3m width throughout, with earth after laying of cables, and consolidating the trench by ramming and leveling.

1000

8

8330

... More
Supply of RCC cable markers as per drawing No.CSTE/CN/OFC/1. The lettering on the cable marker shall be "SIG" / "TELE" / "OFC" as per the instructions of Railway representative at site.

20

166

3325.8

... More
Digging of pit to a depth of 800mm of size 300mmX300mm, casting of concrete 10 foundation of size 300mmX300mmX300mm and Placing of RCC cable markers on top of the foundation and refilling the pit and consolidating it by ramming. The cable markers shall be provided at an interval of 20 Mtrs. within station limits and 50 Mtrs. outside station limits throughout the cable route, diversions and also at every track/road crossing.

20

121

2428.6

... More
Excavation of cable coil pit to a size of 1.5mx1.5m and depth as instructed by Railway representative at site, for coiling the cables in rear of relay rooms/ AFTC huts, apparatus cases etc. The 11 work includes coiling the underground cables, and placing closely one layer of country bricks of size approx. 220mm x 100mm x 60mm breadth wise above the cables to cover all the cables in the cable pit, closing and consolidating the pit by ramming and leveling. [Country bricks of size 220mmx100mmx60mm (approximately) shall be supplied by the Contractor].

5

513

2565

... More
Supply of Double walled corrugated pipe - 103.5mm inner dia & 120mm outer dia conforming to specification No. IS 14930(Part 2): 2001 with one coupler for every 6m of pipe as specified in Vol.II of the Tender document.

30

263

7896

... More
Supply of GI pipes - 50mm dia -3.65mm thick as specified in Vol.II of the Tender document.

30

343

10296

... More
Supply of GI pipes - 100mm dia-4.5mm thick as specified in Vol.II of the Tender document

18

838

15098.4

... More
Excavation of pit, casting concrete foundation and erection of apparatus case full size as per Drg. No.SG/CN/02/6 and fixing of 2 Nos. of 'E' type locks, one for the front door and another for 15 the back door, fixing of one hard wood shelf plank 37mm thick and painting the apparatus case inside and outside with one coat of red-oxide and two coats of aluminium paints. (Supply of apparatus case is not included in this schedule). [Foundation bolts & nuts, 'E' type locks, cement, river sand, stone jelly of size 20/25 mm, hardwood plank of 37mm thick, paints, varnish, fixing bolts & nuts and all other miscellaneous materials required for the work shall be supplied by the Contractor.]

1

9875

9875.3

... More
Excavation of pit, casting concrete foundation and erection of apparatus case half size as per Drg, No.SG/CN/02/7, fixing one 'E' type lock for the front door and latching arrangement for the 16 back door, and fixing of one hardwood shelf plank 37mm thick and painting the apparatus case inside and outside with one coat of red-oxide and two coats of aluminium paints. (Supply of apparatus case is not included in this schedule). [Foundation bolts and nuts, cement, 'E' type locks, river sand, stone jelly of size 20/25mm, 37mm hard wood planks, latching arrangements, paints, varnish, fixing bolts & nuts and all other miscellaneous materials required for the work shall be supplied by the Contractor]

1

6966

6966.1

... More
Excavation of pit in and around the existing location boxes very carefully without damaging the working cables and shifting and turning the location boxes to clear of the infringement as instructed by the Railway representative at site. The work includes ensuring the safety of the 17 signaling system, releasing the cable coils to give access for shifting/turning the location boxes. Necessary masonry work and earth work in and around the location boxes to the required level shall be done as instructed by the Railway representative at site. If the existing earth connections to the location boxes are disturbed, the earth wires shall be properly re-connected. [All materials required for the work shall be supplied by the Contractor]. a. Shifting of apparatus case (full)

1

2895

2895

... More
Excavation of pit in and around the existing location boxes very carefully without damaging the working cables and shifting and turning the location boxes to clear of the infringement as instructed by the Railway representative at site. The work includes ensuring the safety of the 18 signaling system, releasing the cable coils to give access for shifting/turning the location boxes. Necessary masonry work and earth work in and around the location boxes to the required level shall be done as instructed by the Railway representative at site. If the existing earth connections to the location boxes are disturbed, the earth wires shall be properly re-connected. [All materials required for the work shall be supplied by the Contractor]. b. Shifting of apparatus case (half)

1

1916

1916.25

... More
Excavation of pit in and around the existing location boxes very carefully without damaging the working cables and shifting and turning the location boxes to clear of the infringement as instructed by the Railway representative at site. The work includes ensuring the safety of the 19 signaling system, releasing the cable coils to give access for shifting/turning the location boxes. Necessary masonry work and earth work in and around the location boxes to the required level shall be done as instructed by the Railway representative at site. If the existing earth connections to the location boxes are disturbed, the earth wires shall be properly re-connected. [All materials required for the work shall be supplied by the Contractor]. c. Shifting of apparatus case (Quarter)

1

1583

1583.25

... More
Termination of main, tail, Signaling and power cables and internal wiring on terminal/ fuse blocks in new apparatus cases, cable termination boxes and in gate Lodges excluding cable termination rack at relay room. The work includes fixing of all new cables by teakwood clamp on teakwood base plank, fixing of Phynolic synthetic industrial fibre base fine weave cotton fibre board 6mm thick for terminal board to suit each apparatus case, varnishing all teakwood items, fixing of terminals/ fuse blocks on the terminal board, drilling of necessary holes, termination of cables, wiring, identification of cables using aluminium tags with letters punched neatly, as per approved circuit diagram and cable plan, painting of particulars on sleeves and also on the inner side of the doors of 20 apparatus cases. After terminations are over, the side openings of apparatus case foundation shall be closed with brick work, cement plastered, the inter-space filled with river sand up to base level and the bottom surface shall be sealed with sealing compound. (Supply of PBT terminals and Fuse blocks is not covered in this schedule). [Cement, teakwood cable clamp 50mm x 50mm, base planks 100mm x 25mm, Phynolic synthetic industrial fibre base fine weave cotton fibre sheet - 6mm thick to IS specification 2036 - 1995 - Type F5, PVC/Nylon sleeves, varnish, paints, bolts, nuts and washers, Non- deteriorating type of fuses of various capacities, Aluminium cable tags, sealing compound, country bricks 220mm x 100mm x 60mm, copper bus bars, brass screw, river sand, wire PVC3/0.75mm copper and other miscellaneous materials shall be supplied by the Contractor]. a. Termination on 25/60mm PBT terminals (new location)(Phynolic sheet) eah - Pe Terminal Block

50

93

4658

... More
Termination of new main/tail cables on the existing terminals/ fuse blocks in apparatus cases/ battery boxes/ CT boxes/ cable termination racks as per approved circuit diagram. The terminal particulars are to be repainted /corrected on the doors of apparatus cases/ battery boxes/ cable 21 termination boxes and FTOT index board as instructed by Railway representative at site. This work includes closing the opening created for entry of new cables in the apparatus cases with masonry brick work and sealing the bottom of the apparatus cases/ cable termination racks with cable compound. [Paints, wire PVC 3/0.75mm and 16/0.2mm copper, sealing compound, bricks, cement, river sand and all other required miscellaneous materials shall be supplied by the contractor]. each= per terminal Block

200

39

7956

... More
Termination of main, tail, Signaling and power cables and internal wiring on terminal/ fuse blocks in new apparatus cases, cable termination boxes and in gate Lodges excluding cable termination rack at relay room. The work includes fixing of all new cables by teakwood clamp on teakwood base plank, fixing of Phynolic synthetic industrial fibre base fine weave cotton fibre board 6mm thick for terminal board to suit each apparatus case, varnishing all teakwood items, fixing of terminals/ fuse blocks on the terminal board, drilling of necessary holes, termination of cables, wiring, identification of cables using aluminium tags with letters punched neatly, as per approved circuit diagram and cable plan, painting of particulars on sleeves and also on the inner side of the doors of 22 apparatus cases. After terminations are over, the side openings of apparatus case foundation shall be closed with brick work, cement plastered, the inter-space filled with river sand up to base level and the bottom surface shall be sealed with sealing compound. (Supply of PBT terminals and Fuse blocks is not covered in this schedule). [Cement, teakwood cable clamp 50mm x 50mm, base planks 100mm x 25mm, Phynolic synthetic industrial fibre base fine weave cotton fibre sheet - 6mm thick to IS specification 2036 - 1995 - Type F5, PVC/Nylon sleeves, varnish, paints, bolts, nuts and washers, Non- deteriorating type of fuses of various capacities, Aluminium cable tags, sealing compound, country bricks 220mm x 100mm x 60mm, copper bus bars, brass screw, river sand, wire PVC3/0.75mm copper and other miscellaneous materials shall be supplied by the Contractor]. b. Termination on PBT fuse block (new location) (Phynolic sheet) each - Per Terminal Block

10

113

1135.6

... More
Termination of main, tail, Signaling and power cables and internal wiring by fixing additional terminals/ fuse blocks on the existing terminal boards of apparatus cases, cable termination boxes etc. The work includes fixing of all new cables by teakwood clamp on teakwood base plank, varnishing all teakwood items, fixing of terminals/ fuse blocks, on the existing terminal boards, drilling of necessary holes, termination of cables, wiring, identification of cables using aluminium tags with 23 letters punched neatly, as per approved circuit diagram and cable plan, painting of particulars on sleeves and also on the inner side of the doors of apparatus cases. After terminations are over, the side openings of apparatus case foundation shall be closed with brick work, cement plastered, the inter-space filled with river sand up to base level and the bottom surface shall be sealed with sealing compound. (Supply of PBT terminals and Fuse blocks is not covered in this schedule). [Cement, teakwood cable clamp 50mm x 50mm, base planks 100mm x 25mm, PVC/Nylon sleeves, varnish, paints, bolts, nuts and washers, Non-deteriorating type of fuses of various capacities, Aluminium cable tags, sealing compound, country bricks 220mm x 100mm x 60mm, copper bus bars, brass screw, river sand, wire PVC3/0.75mm copper and other miscellaneous materials shall be supplied by the Contractor]. a.Termination of cables on 25/60mm PBT terminals (existing location) each- Per Ter. Block

10

81

816.8

... More
Termination of main, tail, Signaling and power cables and internal wiring by fixing additional terminals/ fuse blocks on the existing terminal boards of apparatus cases, cable termination boxes etc. The work includes fixing of all new cables by teakwood clamp on teakwood base plank, varnishing all teakwood items, fixing of terminals/ fuse blocks, on the existing terminal boards, drilling of necessary holes, termination of cables, wiring, identification of cables using aluminium tags with letters punched neatly, as per approved circuit diagram and cable plan, painting of particulars on 24 sleeves and also on the inner side of the doors of apparatus cases. After terminations are over, the side openings of apparatus case foundation shall be closed with brick work, cement plastered, the inter-space filled with river sand up to base level and the bottom surface shall be sealed with sealing compound. (Supply of PBT terminals and Fuse blocks is not covered in this schedule). [Cement, teakwood cable clamp 50mm x 50mm, base planks 100mm x 25mm, PVC/Nylon sleeves, varnish, paints, bolts, nuts and washers, Non-deteriorating type of fuses of various capacities, Aluminium cable tags, sealing compound, country bricks 220mm x 100mm x 60mm, copper bus bars, brass screw, river sand, wire PVC3/0.75mm copper and other miscellaneous materials shall be supplied by the Contractor]. b.Termination of cables on PBT fuse block (existing location) Each - Per Fuse Block

10

102

1020.8

... More
Alterations to painted termination/ wiring particulars of functions in the existing apparatus cases, cable termination boxes, etc., on the PVC/ nylon sleeves and painting of new 25 nomenclature on the existing signaling gadgets. This work includes carrying out alterations of particulars on the inner side of the doors of apparatus cases, re-numbering of apparatus cases and cable termination boxes. [Paints and all other miscellaneous materials required for the work shall be supplied by the Contractor]. a. Alteration to painting particulars (apparatus case - Full size)

10

884

8848.5

... More
Alterations to painted termination/ wiring particulars of functions in the existing apparatus cases, cable termination boxes, etc., on the PVC/ nylon sleeves and painting of new 26 nomenclature on the existing signaling gadgets. This work includes carrying out alterations of particulars on the inner side of the doors of apparatus cases, re-numbering of apparatus cases and cable termination boxes. [Paints and all other miscellaneous materials required for the work shall be supplied by the Contractor]. b. Alteration to painting particulars (apparatus case - half size)

5

464

2320.5

... More
Excavation of pit, casting concrete foundation as per Drg.No.SG/CN/02/9 using metallic 27 templates, for erection of colour light signals up to 4 aspects. [Foundation bolts, cement, river sand, stone jelly of size 20/25mm dia and all other miscellaneous materials required for the work shall be supplied by the Contractor].

3

5008

15024.6

... More
Erection of surface base, signal pole, mounting of colour light signal up to 4 aspects complete on Signal pole/ Off-set bracket, (for LED/ filament bulbs) with lenses, triple pole lamp holder, filament switching units, CLS transformer, current regulators (whichever is applicable), fixing of ladder with platform complete and concreting of ladder shoe, fixing of number plates, marker board, lens guard, fixing of speed limit board wherever necessary, termination of tail cables, wiring of signal unit with PVC wire 3/0.75mm copper, provision of EWS locks, and painting of one coat of red oxide and two 28 coats of aluminium/ enamel paints. When the aspect is fixed on Offset bracket using 'U' bolts and nuts, a through bolt shall be provided by drilling a hole in the signal pole to prevent the offset bracket from sliding down. (Supply of surface base, Offset bracket, CLS pole, CLS aspects complete, ladder with shoes and platform, Speed limit board, LED aspects, current regulators, lamp holders, lamps, filament switching unit and CLS transformer is not covered in this schedule). ['U' bolts and nuts, through bolts and nuts, cement, stone jelly 20/25mm dia, river sand, Signal Collar Rings, wire PVC 3/0.75mm copper, lens-guard, all fixing bolts and nuts, lead wool, paints PVC/Nylon sleeves, enameled number plates. enameled marker boards, EWS locks, and all other miscellaneous materials for the work shall be supplied by the Contractor].

3

5501

16503.6

... More
Removal of existing CLS units, fixing of new CLS units with LED aspects/ lamps, holders etc., up to four aspects, directly or using off set brackets duly drilling holes on the signal poles, 29 provision of EWS locks wherever necessary, termination of tail cables and wiring using wire PVC3/0.75mm copper and painting of aspect. The new tail cables shall be taken through the signal poles and the unwanted cables duly released. (Supply of CLS unit with LED aspects/ lamps holders, CLS transformers is not included in this schedule.) [EWS locks, Wire PVC 3/0.75mm copper lenses guard, wire netting arrangements, paints and all other miscellaneous materials shall be supplied by the Contractor].

3

5999

17997.75

... More
Supply of Colour light Signal pole 140mm dia, 4.6m/3.6m tall with necessary inspection as per specification/ drawing/ description enclosed in this Document. b. Supply of colour light Signal pole (3.6m)

3

2974

8922

... More
Supply of surface base to suit CLS Signal pole 140mm dia with necessary inspection as per specification/ drawing/ description enclosed in this document.

3

4118

12354

... More
Supply of ladder with platform and shoes to suit CLS pole 4.6m/ 3.6m tall, with necessary inspection as per specification/ drawing/ description enclosed in this document. b. Supply of ladder with platform and shoes for 3.6m CLS pole

3

3089

9267

... More
Installation of LC control panel cum illuminated diagram board at Level Crossing gate 33 lodge and wiring the same including interconnections and painting. (Supply of LC control panel cum illuminated diagram board is not included in this schedule). [Wire PVC 16/0.2mm copper, soldering materials, LEDs, resistances and all other required miscellaneous materials shall be supplied by the Contractor.].

1

3437

3437.4

... More
Excavation of pit, concreting 'A' type foundation and Nos. fixing ground lever frames single/double as per Drg.No.SG/CN/02/11 complete with ground connection. The work includes 34 concreting of 'A' type foundations and fixing of HP lock and connecting the ground lever frame with the HP lock using MS rod as instructed by Railway representative at site. (Supply of ground lever frames, hand plunger locks and 'A' type foundations is not covered in this schedule). [Cement, river sand, stone jelly of size 20/25mm, fixing bolts and nuts with washers and all other miscellaneous materials shall be supplied by the Contractor].

2

4531

9062.7

... More
Interlocking of level crossing gate with Lifting Barrier: This work consists cutting of notches on the drum of the winch, , fixing and levelling of trestles, rod roller assembly, levelling and concreting of 'A' type foundations, fixing of rod diversion cranks, vertical cranks, running of rods (app. 35 30mtrs.) and connecting them to lever tail at one end and boom locking arrangement at the other end, and painting as per standard practice. The work also includes fixing of wiring of one limit switch for each boom as per the instructions of Railway representative at site. (Supply of HP locks, rods, 'A' type foundations, trestles, segments, rod roller assembly complete and cranks is not covered in this schedule). [Cement, river sand, stone jelly of size 20/25mm dia, coal bengal, paints, all types of bolts & nuts and all other miscellaneous materials shall be supplied by the Contractor].

1

12370

12370.05

... More
Fixing and wiring of Two Nos. of Electronic Gate Warning equipment for each level 36 crossing gate, one on each road warning signal, amplifier in the Set. apparatus case with wire PVC 3/0.75mm and 16/0.2mm copper, and painting. (Electronic Gate Warning Equipment and amplifier will be supplied by Railways). [All wiring, fixing and painting materials shall be supplied by Contractor].

1

2427

2427.75

... More
Fixing of EKT instrument with (or) without crank handle or on suitable fixtures at station/apparatus case, provision of economiser push switch with locking facility, wiring with wire PVC 37 16/0.2mm copper, provision of teakwood terminal box covered with decolum along with locking facility and painting. (Supply of electric key transmitter and crank handles is not covered in this schedule). [wire PVC 16/0.2mm copper, wire wound resistance, decolum covered terminal box with locking facility by using 25mm thick teakwood, bolts and nuts, paints, push switches, padlocks and other miscellaneous materials required for this work shall be supplied by the contractor].

2

2943

5887.5

... More
Supply and provision of E type lock with key for fixing the same in LC/HP/FP Locks/SM 38 slides and painting as per standard practice and instructions of Railway representative at site. (Supply of E type Locks, Keys, Paints, all types of screws, bolts & Nuts and all other miscellaneous materials shall be supplied by the Contractor).

3

1266

3798

... More
Dismantling and releasing of existing Colour light Signals complete (upto 4 aspects) with or without Route Indicators, calling on signals, shunt signals etc., carefully without any damage to the gadgets, accounting and stacking them neatly at a place as instructed by Railway representative at site. The work includes breaking the concrete foundation, closing the resultant pit and resurfacing it by ramming and levelling.

-

-

39

... More
Dismantling and releasing of ground lever frame along with all connected gadgets like 40 lever locks, 'E' type locks, HP locks, etc., accounting and stacking them neatly at a place as instructed by Railway representative at site. The work also involves breaking and removal of concrete foundation and the resultant pit shall be filled and consolidated by ramming and levelling.

1

3000

3000

... More
Releasing of point rods with rod roller trestles, complete assembly. This includes 41 releasing of all cranks, compensators and 'A' type concrete foundation on the rod run. The resultant pits are to be covered with earth and consolidated by ramming and levelling. a. Releasing of tressles 1/2 way

20

46

933

... More
Releasing of point rods with rod roller trestles, complete assembly. This includes 42 releasing of all cranks, compensators and 'A' type concrete foundation on the rod run. The resultant pits are to be covered with earth and consolidated by ramming and levelling. b. Releasing of tressles 3/4 way

20

63

1266

... More
Releasing of point rods with rod roller trestles, complete assembly. This includes 43 releasing of all cranks, compensators and 'A' type concrete foundation on the rod run. The resultant pits are to be covered with earth and consolidated by ramming and levelling. c. Releasing of point roddings

60

7

477

... More
Releasing of point rods with rod roller trestles, complete assembly. This includes 44 releasing of all cranks, compensators and 'A' type concrete foundation on the rod run. The resultant pits are to be covered with earth and consolidated by ramming and levelling. d. Releasing of 'A' type foundations

2

341

683.4

... More
Releasing of all the S & T gadgets at LC gates like SM slide instruments, illuminated 45 diagram board, block counter, termination box, telephones, emergency key box, etc and concerned wiring, accounting and stacking them neatly at a place as instructed by Railway representative at site. After releasing any holes on the walls/ floor are to be filled with cement mortar and plastered.

1

5166

5166

... More
Provision of earth electrodes as per drawing No.SG/SN/02/13 and earthing of metallic sheath and armour of all cables in all apparatus cases, relay room, equipment room, SM's room for block and control, and earthing of all equipments in apparatus cases, power room, relay rack, cable 46 termination rack, control panel, signals, lever frames with MS flat 35mm X 6mm/19c cable (MS flat for closer by areas and MS flat/19c cable combination for farther areas) as per the instructions of Railway representative at site. The work includes painting of earth resistance value on the earth pit. (Supply of 19C cable is not covered in the scope of this schedule). [MS flat for earthing 35mm X 6mm, cement, GI earth electrodes, common salt, charcoal, country bricks, river sand, soldering materials and all other miscellaneous materials required for the work shall be supplied by the Contractor].

10

1799

17990

... More
Supply of PBT terminals 25mm/ 60mm centre and PBT Fuse blocks with necessary inspection as per specification/ drawing/ description enclosed in this document. a. Supply of PBT terminal - 25mm centre

500

44

22000

... More
Supply of PBT terminals 25mm/ 60mm centre and PBT Fuse blocks with necessary inspection as per specification/ drawing/ description enclosed in this document. b. Supply of PBT terminal - 60mm centre

100

60

6000

... More
Supply of apparatus cases (full/ half/ quarter size) to suit Southern Railway standard with necessary inspection as per specification/ drawing/ description enclosed in this document: a. Supply of apparatus case - Full size

2

12012

24024

... More
Supply of apparatus cases (full/ half/ quarter size) to suit Southern Railway standard with necessary inspection as per specification/ drawing/ description enclosed in this document: b. Supply of apparatus case - Half size

2

8580

17160

... More
Supply of Electric key transmitter - rotary type of required ward Nos. with keys, with necessary inspection as per specification/ drawing/ description enclosed in this document.

3

4279

12837

... More
Carrying out alterations to the existing relays in the Per relay racks/apparatus cases as per the approved Relay circuit diagram using wire PVC 16/0.2mm copper. The work includes painting 52 alterations and releasing the unwanted wires carefully without disturbing the existing wiring. [Wire PVC 16/0.2mm copper, soldering materials, bunching threads, condensers, resistances and teakwood plank for fixing them and all other miscellaneous materials required for the work shall be supplied by the Contractor]. Each -Per Relay

25

376

9401

... More
Manufacture and supply of M.S. relay frames of suitable size to hold up to 4/ 8/ 12/ 20 relays /plug in type HMU as required by Railways and fixing them in apparatus cases for all types of signal control circuits, LC gate control circuit and Point control circuits, fixing of plug boards, relays, resistors and electrolytic condensers on Phynolic synthetic industrial fibre base fine weave cotton fibre sheet - 6mm thick to IS specification 2036 - 1995 - Type F5, wiring and termination as per approved 53 circuit diagram and painting the particulars. (Supply of all types of relays, plug boards, connectors, retaining clips and plug in type HMU is not covered in this schedule). [Wire PVC copper, 3/0.75mm and 16/0.2mm copper, Phynolic synthetic industrial fibre base fine weave cotton fibre sheet - 6mm thick to IS specification 2036 - 1995 - Type F5, for fixing resistors and condensers, MS flats 25mm x 6mm brass bolts and nuts, paints, soldering materials, resistors, condensers and all other miscellaneous materials required for the work shall be supplied by the contractor]. c. Wiring of Signal/ Point/ LC control circuit (up to 12 relays/plug in type HMU)

1

6137

6137.85

... More
Installation of LC control panel cum illuminated diagram board at Level Crossing gate 54 lodge and wiring the same including interconnections and painting. (Supply of LC control panel cum illuminated diagram board is not included in this schedule). [Wire PVC 16/0.2mm copper, soldering materials, LEDs, resistances and all other required miscellaneous materials shall be supplied by the Contractor.].

1

3437

3437.4

... More
Design, fabrication and supply of Gate Indication Panel of 16 SWG, powder coated MS sheet of size 450mm x 300mm x 100mm approximately consisting of different colour LEDs with 55 holders suitable to work on 24VDC supply. Indications on the front panel shall be as per typical diagram supplied by Railways. All descriptions on the front panel have to be neatly painted. The Panel shall then be wired using wire PVC 16/0.2mm copper as per the approved circuit diagram and installed in the gate lodge as instructed by Railway representative at site. [All materials required for the work shall be supplied by the Contractor].

1

7843

7843.5

... More
Releasing of existing apparatus cases (Full/ Half/ Quarter size) without damage after 56 releasing the shelf planks, Terminal blocks, Fuse Blocks, Terminal Boards, Relays of all types EKTs, Secondary Cells, power equipments, 'E' type locks, etc., and breaking the concrete foundation. After releasing, the resultant pits are to be closed and consolidated by ramming and levelling. The released materials shall be accounted and stacked at a place as instructed by Railway representative at site.

8

1625

13002

... More
Submission of all relevent final 'Asmades' of circuit diagrams, contact analysis charts, termination particulars of apparatus cases and cable termination rack, power supply arrangements, relay index board, cable plans, cable route plans, red boundary plans and all other particulars covered under various schedules. All 'As mades' shall be prepared by the Contractor in AUTOCAD 2000 or latest and submitted in CDs. One copy of the 'As mades' check print shall be submitted before Testing the circuits. The final negatives shall be made in tracing sheet (80 to 90 gsm). All 'As mades' except cable plan, cable route plan, bonding diagram & power supply diagram shall be prepared in A3 size. 57 On approval the contractor shall submit along with the negatives, 8 copies in each, duly making booklet neatly bound. Out of 8 sets, 2 sets of drawings and other plans shall be kept in transparent plastic cover (2 sheets back to back in one plastic cover) and handed over to Railways. Also the contractor has to supply one set of As mades in 'Reproduction Film' . The approved circuit diagram will be issued by Railways in soft copy as well as two sets of hard copies. Wherever alterations to existing circuits are involved, the existing as-made circuit diagrams will be supplied by Railways either in CDs or RP film. The Contractor shall incoporate the details of all the new wirings and alterations in the CD/ RP film and submit them to Railways. On approval 8 copies shall be made for As- made circuit diagrams also as mentioned above. Each-Per Sheet

25

206

5163.75

... More
Transportation of Signalling materials by road as per the instructions of Railway representative at site. The work also includes loading and unloading of the materials. a. Transportation upto 100 Kms. Each - Per Ton Km

2000

12

24600

... More
Transportation of Signalling materials by road as per the instructions of Railway representative at site. The work also includes loading and unloading of the materials. b. Transportation more than 100 Kms. Each- Per Ton Km

6000

7

45120

... More
Track crossing by Horizontal Boring Method based on RDSO Report No. BS - 105. This also includes insertion of HDPE Pipe of 110mm Outer dia in the Bore drilled.(Supply of HDPE Pipe is not included).

-

-

60

... More
Termination of Main, Tail, Signalling and power cables and internal wiring on terminal/ fuse blocks in cable termination Rack at relay room. The work includes fixing of all new cables by teakwood clamp on teakwood base plank, fixing of Hylem sheet 10 mm thick for terminal board , varnishing all teakwood items, fixing of terminals/ fuse blocks on the terminal board, drilling of necessary holes, termination of cables, wiring, identification of cables using aluminium tags with 61 letters punched neatly, as per approved circuit diagram and cable plan, painting of particulars on sleeves . After terminations are over, cable entry at the bottom shall be closed with , cement plastered, the inter-space filled with sand upto base level and the bottom surface shall be sealed with sealing compound. Cable armour to be soldered to earth.(Supply of cable termination racks is not included in this schedule). [All bolts and nuts with washers, Hylum Sheet 10 mm Thick, cement, sand, stone jelly, Teak wood base , paints and all other miscellaneous materials required for the work shall be supplied by the contractor]a. Termination on 25/60mm PBT terminals Each- Per Terminal

100

144

14400

... More
Concreting of cable laid in the trench or GI pipe/DWC/HDPE pipe in which cable is already laid to a size of 300*300mm with 1:3:6 mortar. (All the matetrials required for the work should be supplied by the contractor)

30

495

14850

... More
Providing services of helping hand man power to carry out miscellaneous/sundry works in the office/field between 08.00 hrs and 20.00 hrs of the day and accompanying Railway staff with all 63 expenses of transportation, accomodation, food, consumables etc., with all ascents/descents, taxes, octroi, cess, fees, duties, with contractors tools and plants, materials, consumables, labour, crew, machineries with all lead and lift etc., complete as per special conditions, specification, regulation and as directed by Railway Engineer-in-charge.

90

498

44820

... More
Supply and laying of Split DWC pipe of 120/103 mm dia, 2 meter long in already dug cable trenches. The unit of RMT means two split pipes of I Mtr each. Material shall be supplied as per specification RDSO/SPN/204/2011 or latest

1000

284

284000

... More
Modification in existing EI system as per latest TAN, it Includes: Design and modification in existing interface and interlocking circuit of EI system, including modification in VDU,CCIP, MT, Data logger, EI, Relay rack complete wiring conforming to RDSO specification, as per technical requirement & tentative approved signalling plan/diagrams. Required hardware will be provided by railways except 65 the wiring, material (i.e. connectors, interconnecting cable/wires, fuses etc.). The work includes supply of modified ST/LT, interface and logic circuit, CCIP/VDU diagram etc. to suit the approved interlocking plan. It also includes modification in data logger/MT, carrying out FAT, SAT jointly with railways and satisfactory commissioning of the modified El with full complements as per approved IP and central railway practices. All plans and wiring diagrams shall be prepared on- AUTOCAD and supplied in both soft copy and hard coples (6 sets). Alteration involving modification in upto 10 routes Each- Per Alteration

1

171607

171607.91

... More
PVC insulated armoured , unscreened underground Aluminium conductor 1.1 KVA grade Power cable 2C x25sqmm as per spec IRS: S-63/2014 (Rev.4.0)& IS:1554. (part-I) (Rev.4.0) or latest.

1

105015

105015.28

... More
PVC insulated armoured , unscreened,multicore Cu conductors, underground Railways signalling cable 19C x1.5sqmm cu cableas per spec IRS: S-63/2014 (Rev.4.0) IS:1554. (part-I) or latest.

1

314933

314933.15

... More
PVC insulated armoured , unscreened,multicore Cu conductors, underground Railways signalling cable 30C x1.5sqmm cu cableas per spec IRS: S-63/2014 (Rev.4.0) IS:1554. (part-I) or latest.

1

482030

482030

... More
PVC Wire 16/0.2 mm YELLOW PVC INSULATED COPPER WIRE , ATC SPEC IRS/76/89 WITH LATEST AMENDMENT (CABLE SHALL BE SUPPLIED IN 100 MTRS BUNDLES)

5.9

2000

11800

... More
Main LED Signal lighting unit 1 l0V AC consisting of LED signal YELLOW aspect as per RDSO specification. No. RDSO/SPN/199/2010 REV.1 . I . with latest amendment for Integrated LED signal lighting unit compatible for housing in existing CLS main signal YELLOW aspect.

5

8732

43660

... More
Main LED Signal lighting unit I l0V AC consisting of LED signal RED aspect as per RDSO specification. No.RDSO/SPN/ l99/20 IO REV.l . I . with latest amendment for lntegrated LED signal lighting unit compatible for housing in existing CLS main signal RED aspect.

-

-

71

... More
Main LED Signal lighting unit 1l0V AC consisting of LED signal GREEN aspect as per RDSO specification. No. RDSO/SPN/199/2010 REV.l .1 . w r t. latest amendment for Integrated LED signal lighting unit compatible for housing in existing CLS main signal GREEN aspect. 73

5

9912

49560

... More
Supply of Dominos and alteration of existing operatingcontrol cum indication panel.

6

1900

11400

... More
Execavation of pit and concreting foundations for resting stand/meeting stand (approx 10nos) for sliding boom erection all required materials for foundation like, sand, cement,jelly and other misc materials are to be arranged by contractor

-

-

22780.95

... More
Fixing of sliding type mechanical boom make assembly movement drive mechansim, resting stand meeting posts and fixing of E type locking plate to meeting post and in gate lodge, the 75 includes complete erection and commisioning of slide booms, overhauling of E type locks, extenssion of slide booms, clearing of vegitation, painting of sliding booms and etc,. required at site shall be done by the contractor as per railway supervisor incharge at site all the miscelleneous materials required for the work shall be borned by the contractor

-

-

34292.5

... More
Manufacture and supply of Block counters as perthe sketch 700mm X950mmX800mm withapplication of patty and good quality painting andshall have the provision to fix the PBT terminalsboards and cable inlet holes at bottom ( 4 places)and dummied. 77

1

12000

12000

... More
Installation and commissioining of road warning signal with out civil works

1

10000

10000

... More
Casting of circular FRP chamber, bottom plate and top covers(1:2:4 concrete mix) with reinforcement, two hooks in each half cover, provision of duct holes as shown in the drawing. 78 Excavation of circular pit to a depth of 1300 mm, dia of 1500 mm, positioning of bottom plates, chamber and top covers .(two halves). Chamber to be filled with river sand to the brim of the chamber after cable blowing and splicing, top covers placed, refilled with excavated soil and rammed etc., complete to the finished item of work as directed by the RailTel Engineer-in-Charge . 79

2

4279

8558

... More
Providing dry sand in FRP/RCC joint chambers up to 400mm height

2

750

1500

... More
Laying of OFC /Quad Cable in trench and through HDPE/GI/RCC pipes where ever necessary. 81

2000

15

30000

... More
Laying of HDPE duct in trenches. Supply and pulling of nylon rope through it. 82

500

12

6000

... More
Splicing and termination of Fiber OFC (Splice enclose supplied by RailTel)

2

7872

15744

... More
Supply of Double walled corrugated pipe - 103.5mm inner dia & 120mm outer dia conforming to specification No. IS 14930(Part 2): 2001 with one coupler for every 6m of pipe as specified in Vol.II of the Tender document.

60

263

15792

... More
Supply and provision of earth electrodes as per RDSO Nos. specification No.RDSO/SPN/TC/75/2008 with copper base of size 1000mm X 1000 X 3mm, for sophisticated signaling equipments. The work involves digging of pit to a depth of 2.5m and placing of the copper plate and connecting it to the signaling equipments through copper strips 25mm X 3mm (2 No's) by welding and taking it through to the wall of the equipment room where it shall be connected to a copper bus bar 84 fixed on the wall. The work also involves providing a perforated up to 2m HDPE pipe 75mm OD - 4mm thick, 2600mm long vertically at the centre of the copper plate which shall be used for watering. The work also involves back filling the pit by a mixture of app 200kg of charcoal/ graphite and soil free from sand, gravel and stone in the ratio of 6:1. The pit shall be covered using an RCC slab 100mm thick supported by an MS angle 50mmx50mmx3mm and MS rods 6mm dia. The HDPE pipe shall be covered using concrete enclosure with GI cover and handle. [Copper earth plate, copper strips, HDPE pipe, charcoal, RCC slabs, MS angles and rods, and all other miscellaneous materials required for the work shall be supplied by the Contractor].

2

31118

62236

... More
Transportation of Signalling materials by road as per the instructions of Railway representative at site. The work also includes loading and unloading of the materials. a. Transportation upto 100 Kms. Each- Per Ton Km

1000

12

12300

... More
Transportation of Signalling materials by road as per the instructions of Railway representative at site. The work also includes loading and unloading of the materials. b. Transportation more than 100 Kms.

-

-

86

... More
Provision of normal joint of Heat Shrinkable type complete for 6 quad cable. After the jointing the through cable has to be tested for insulation resistance and loop resistance in presence of 88 Railway Engineer and in case of any defect the jointing has to be re-done free of cost by the contractor. [Heat Shrinkable jointing kit conforming to RDSO Specification No.IRS-TC 77/2006 covered in the supply portion has to be used for this purpose. The contractor should supply all other small items including thermal sleeves free of cost which are required for making a joint. Only gas blower to be used for blowing].

5

3553

17765

... More
Supply of Joint kit conforming to RDSO specificaiton No.|RS-TC 77|2OOO Revisionl or fatest for Quad cable

5

3891

19455

... More
Supply and Fixing of PVC casing and capping/Pvc pipe of minimum 25 mm size or 90 higher as per requirement at site on the wall/floor etc., using bends, coupler and T joints and flexible pipe wherever necessary with fixture in the OFC room from equipment rack to common termination and from OFC room to SM room/Reservation office /Data logger/FO|S room etc. (All required material for fixing to be arranged by the contractor

100

53

5300

... More
Supply of Telecom Termination panel with WAGO/Pheonbr/Elmex make or similar disconnecting Terminals blocks of size 1500mm x 500mm x 200mm thickness 1.6mm (16 SWG) 150 91 numbers of disconnecting terminal block with accessories. (The box should be divided in to two compartments 500 mm from TOP with door anangement including locking, and bottom 1000mm closed fully with screws WAGO/Pheonix/Elmex terminals suitable for cable dimensions maximum of 2.5 sq.mm. Provision of easy and ensuring aesthetics

1

45842

45842

... More
Fixing of 'Telecom Termination Panel'and termination of cables on A/ago/krone connectors as per the instructions of the site Engineer.

1

5110

5110

... More
Permanently Lubricated High Density Polyethylene Duct (PLB-HDPE), 40/33 mm Dia, along with End Cap, End Plug, Cable Sealing Plug and Couplers, as per RDSO/SPN/TC/45/2013 Rev.2 (upto Amdt.2) or latest

0.5

-

44553

... More
Supply of Railway Signalling and Telecom Cable 6 Quad 0.90 mm dia Conductor Underground Jelly filled Quad Cable as per RDSO Spec No. IRS : TC 30/2005 (Ver-I) Amdt. No.1 to 5 or latest.

1

306151

306151

... More
Supply of 24 Fiber Optical Fiber cable(armoured) as per RDSO Specs.IRSTC- 55/2006(Rev.1) with Amendment 1.1 or Latest with G652D Fiber for RailTel OFC network

1

68247

68247.9

... More
Supply of VF Transformer 470 : 600 Ohms Rack Mountable as per RDSO Specification IRS : TC-22/76 or latest.

10

719

7198

... More
Supply of STP CAT- 6 Cable compliant with latest EIA/TIA-568-C.2 Standard for CAT 6 Cable 305 Mtrs Roll /Bundle.

300

25

7500

... More
Excavation of joint pit/cable coil pit up to the size of lm depth X 1.5m length X l.5m 98 breadth for providing joint/coil at joint locations and at culverts. bridges. L.C gates etc..this includes backfilling and ramming of the pit after the cable laying and onsolidating of the soil as well as disposal of soil as per plan or as advised by the railway representative

10

1100

11000

... More
Testing of Quad Cable to find the location of LOW insulation/break fault including temporary jointing the cable for testing.

10

607

6075

... More
Handheld True RMS Insulation Resistance Tester with 6000 display counts combined 100 feature of a digital multimeter . 20Gigaohm insulation tester @ 1kV,PI/DAR function, 600 V AC/DC, 99 sets data storage, CAT IV 600V Safety rating. Used for resistance testing of precise tools including motors, cables, transformers, switches, electrical appliances and insulated materials

1

33984

33984

... More
6(a) Supply (excluding supply of copper contact wire and catenary wire) and erection of over head equipment only by manual -Supply and Erection only

0.6

-

61813.51

... More
6(a) Supply (excluding supply of copper contact wire and catenary wire) and erection of over head equipment only by manual -Erection under power block

0.6

-

27705.2

... More
9 (d) Supply ( excluding supply of copper conductor ) and erection of anti creep with Pure/Cadmium Copper Catenary Wire -Supply and Erection only

2

9581

24015.73

... More
9 (d) Supply ( excluding supply of copper conductor ) and erection of anti creep with Pure/Cadmium Copper Catenary Wire -Supply and Erection only 5

2

1907

4780.09

... More
3 (a)(ii) & 3(a)(iii) Supply only of fabricated mast K,B, S series etc

2

99942

221851.25

... More
3(c) Supply and erection of fabricated and galvanized small parts steel work-Supply & Erection

0.6

-

72008.09

... More
3(c) Supply and erection of fabricated and galvanized small parts steel work-Erection under power block 8

0.6

-

4069.56

... More
2 (b) Concrete in other than hard soil and rocky soil

30

6987

269935.76

... More
1(a) Preparation of designs and drawings for over head equipment and verification of Purchasers Engineering Plan Each - SKTM

0.6

-

8799.59

... More
3 (a)(i) Erection of traction masts and main masts of switching stations and L.T. supply transformer stations by manual/crane

2

5257

14238.06

... More
3 (a)(i) Erection of traction masts and main masts of switching stations and L.T. supply transformer stations by manual/crane under Power Block 12

2

5257

14238.06

... More
3(e) Supply and erection of a Guy rod assembly -Supply & Erection 13

2

10462

28335.28

... More
3 (e) Supply and erection of a Guy rod assembly -Erection under Power Block

2

571

1546.5

... More
4(a)(i)(a) Supply and erection of a single bracket assembly (including stay and bracket insulators) -Supply & Erection

10

21391

289676.92

... More
4(a)(i)(a) Supply and erection of a single bracket assembly (including stay and bracket insulators) -Erection under Power Block

10

1061

14368.06

... More
4 (a)(ii) Extra on 4 (a) (i) for supply and erection of additional fittings on a single bracket assembly for supporting two OHEs-Supply & Erection

10

3200

43334.4

... More
4 (a)(ii) Extra on 4 (a) (i) for supply and erection of additional fittings on a single bracket assembly for supporting two OHEs-Erection under Power Block

10

196

2654.23

... More
8 (a) (v) Supply and erection of regulating equipment (3 pulley type) modified with counter weight assembly for conventional / composite OHE. -Supply & Erection

2

81751

221414.41

... More
8 (a) (v) Supply and erection of regulating equipment (3 pulley type) modified with counter weight assembly for conventional / composite OHE. -Erection under power block

2

2913

7889.57

... More
8(b) (ii) Supply and erection of materials for termination of Double conductor (conventional/composite OHE) -Supply & Erection 21 2.00 Each 748.00 1496.00 35.42 2025.88 21

2

12571

34047.3

... More
8(b) (ii) Supply and erection of materials for termination of Double conductor (conventional/composite OHE) -Erection under Power Block

-

-

21

... More
8 (b)(iv) Supply and erection of materials for anticreep termination (one end)-Supply & Erection

2

10012

27116.5

... More
8 (b)(iv) Supply and erection of materials for anticreep termination (one end)-Erection under power block

2

1186

3212.16

... More
8(b) (vi) Supply and erection of materials for termination of tramway type OHE (Regulated).-Supply & Erection only

2

8055

21816.16

... More
8(b) (vi) Supply and erection of materials for termination of tramway type OHE (Regulated).- Erection under Power Block

2

997

2700.27

... More
10 (a) Extra on item 6(a) for supply and erection of additional fittings at a turnout, diamond crossing or overlap.-Supply & Erection

2

7375

19974.45

... More
10 (a) Extra on item 6(a) for supply and erection of additional fittings at a turnout, diamond crossing or overlap.-Erection under Power Block

2

839

2272.35

... More
10 (c) Extra on item 6 (c) & (d) for supply and erection of additional fittings required at a turnout, diamond crossing or over lap - Supply & Erection

2

7284

19727.99

... More
10 (c) Extra on item 6 (c) & (d) for supply and erection of additional fittings required at a turnout, diamond crossing or over lap - Erection under Power Block 30

2

785

2126.09

... More
16 (a) Supply and erection of a structure bond-Supply & Erection 31

12

738

11992.8

... More
16 (b) Supply and erection of longitudinal bond- Supply & Erection 32

16

499

10811.93

... More
16 (c) Supply and erection of transverse and special bond -Supply & Erection 33

4

820

4441.78

... More
30 (a) (iii) Supply and erection of protective screen for FOB/ROB.-Supply & Erection

2

21619

58552.9

... More
30 (a) (iii) Supply and erection of protective screen for FOB/ROB.-Erection under Power Block 35

2

1570

4252.19

... More
31 (a)Transfer of equipment from one mast or support to another- Erection Only

10

1883

25499.59

... More
31 (b) Provision of an additional bracket assembly/assemblies on a mast or support- Erection Only

2

1669

4520.32

... More
31 (b) Provision of an additional bracket assembly/assemblies on a mast or support- Erection under Power Block 38

2

1669

4520.32

... More
31 (d) Dismantling of overhead equipment - Erection only 39

0.4

-

20318.96

... More
31 (d) Dismantling of overhead equipment - Erection under power block 40

0.4

-

20318.96

... More
31 (f) Splicing and extension of an anchored over head equipment -Supply & Erection

0.2

-

2546.71

... More
31 (f) Splicing and extension of an anchored over head equipment -Erection under power block 42

2

7985

21626.57

... More
31 (h) Slewing of equipment- Erection only each =each span

30

1501

60979.63

... More
Slewing of equipment- Erection under power block only. Each= each span 44

30

1501

60979.63

... More
Dismantlement of OHE mast / structure by cutting -Erection only 44

10

3768

51026.26

... More
Dismantlement of OHE mast / structure by cutting -Erection under power block

10

3768

51026.26

... More
31 (l) Dismantlement of OHE mast/structure by breaking the foundation -Erection under power block only 47

2

5373

14552.23

... More
31 (n) Dismantling of guy rod -Erection only 48

2

2433

6589.54

... More
31 (n) Dismantling of guy rod -Erection under power block only 49

2

2433

6589.54

... More
35 Transporting of OHE Materials Each-MTKM

50

105

5250

... More
Adjustment on bracket assemblies for lowering/raising the height of contact and catenary wires where Encumbrance is changed Numbers-span

10

3000

30000

... More
Provision of PG clamps (4 nos per Stiffener rod) and povision of stiffner rod (2 stiffener rod per Set) under FOB/ROB or under any Over line structure (Contect wire piece will be supplied by railways, PG clamps shall be supplied by Contractor ) - Supply & Erection 52

2

3500

7000

... More
42. Dismantlement of Cantilever Assembly - Erection 53

20

2000

40000

... More
43. Dismantlement of ATD - Erection 54

3

5000

15000

... More
25kV Danger board with skull symbol - Supply

10

2000

20000

... More
Provision of Replacement catenary wire with contact wire under FOB/ROB (Contact wire piece will be supplied by railways, Contact and catenary ending clamps to be supplied by contractor) 56

2

13000

26000

... More
Supply of jointless grooved copper contact wire 107 sqmm each= TKM 57

0.6

-

333468

... More
Supply of un-insulated cadmium copper catenary wire 65sqmm Eah - TKM

0.7

-

269950.02



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.