Soil Conservation Department Tender
... More
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 3,93,897Document Cost
₹ 4,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_SCD_19873_6Tender No
E-TEN-1/Pt./2020-21/4215 Date-30.12.2020Tender Authority
Soil Conservation Department ViewPurchaser Address
-Website
http://https://soilconservation.assam.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Plain Cement Concrete 1 : 3 : 6 nominal mix in foundation with crushed stone aggrete 40 mm including curing for 14 days.
8.97
-
-
... More
Earthwork filling guide bund by head load upto lead of 60m as per drawing and technical specifications.
777.66
-
-
... More
Plain Cement Concrete 1 : 3 : 6 nominal mix in foundation with crushed stone aggrete 40 mm including curing for 14 days.
9.05
-
-
... More
Providing & laying filter material underneath the boulder pitching in slopes as specified.
128
-
-
... More
Earthwork filling guide bund by head load upto lead of 60m as per drawing and technical specifications.
9569.88
-
-
... More
Earth work in excavation of foundation of structure as per drawing and technical specification.
River bank cutting with dewatering
180
-
-
... More
RCC signboard
1
-
-
... More
R.C.C.DROP SPILL WAY AT VILLAGE THURIBARI (PART-B)
-
-
-
... More
Site preparation
1
-
-
... More
Earth work in filling for construction of cofferdam
189
-
-
... More
Turfing with sods Furnishing & laying of the live sods of perennial turf forming Grass on embankment slope, verges and other location as direct.
8866
-
-
... More
Instalation of Tube well
1
-
-
... More
Earth work in filling for construction of cofferdam
183.75
-
-
... More
Earth work in excavation of foundation of structure as per drawing and technical specification.
River bank cutting without dewatering
624.95
-
-
... More
Providing & laying boulder apron layed in wire crates as specified.
768
-
-
... More
Providing & laying pitching on slopes laid over filter material as per drawing and specifications.
600
-
-
... More
Providing & laying pitching on slopes laid over filter material as per drawing and specifications.
120
-
-
... More
RCC signboard
1
-
-
... More
Earth work in excavation of foundation of structure as per drawing and technical specification.
River bank cutting with dewatering
345.6
-
-
... More
Instalation of Tube well
1
-
-
... More
Earth work in excavation of foundation of structure as per drawing and technical specification.
River bank cutting with dewatering
180
-
-
... More
Earthwork in filling of diversion channel
459.38
-
-
... More
RCC Works in in sub structure complete as per drawing & technical specification.
71.06
-
-
... More
Earth work in excavation of foundation of structure as per drawing and technical specification.
(b) Below G.B. level including bailing out water
99.66
-
-
... More
Supplying, fitting & placing TMT CRS(Fe-500) bar reinforcement complete as per drawing & technical specifications.
42
-
-
... More
Earth work in excavation of foundation of structure as per drawing and technical specification.
(a) Up to G.B. level without dewatering
220
-
-
... More
Earth work in excavation of foundation of structure as per drawing and technical specification.
(b) Below G.B. level including bailing out water
96.22
-
-
... More
Temporary Camp Hut
24
-
-
... More
RCC Works in in sub structure complete as per drawing & technical specification.
65.91
-
-
... More
Earth work in excavation of foundation of structure as per drawing and technical specification.
River bank cutting without dewatering
99.97
-
-
... More
Providing turfing as specified.
508.8
-
-
... More
Earthwork filling guide bund by head load upto lead of 60m as per drawing and technical specifications.
(b)Diversion channel
459.38
-
-
... More
RCC signboard
1
-
-
... More
Providing & laying pitching on slopes laid over filter material as per drawing and specifications.
384
-
-
... More
Providing & laying filter material underneath the boulder pitching in slopes as specified.
40
-
-
... More
Providing & laying boulder apron layed in wire crates as specified.
400
-
-
... More
BOULDER PITCHING AT TARANG RIVER IN VILLAGE SHYAMTAIBARI
-
-
-
... More
Earthwork filling guide bund by head load upto lead of 60m as per drawing and technical specifications.
(a)Guide Bund
918.75
-
-
... More
Providing & laying boulder apron layed in wire crates as specified.
1600
-
-
... More
Earthwork in excavation of diversion channel
525
-
-
... More
Temporary Camp Hut
10
-
-
... More
Providing & laying filter material underneath the boulder pitching in slopes as specified.
40
-
-
... More
RCC signboard
1
-
-
... More
Providing & laying pitching on slopes laid over filter material as per drawing and specifications.
120
-
-
... More
Providing & laying boulder apron layed in wire crates as specified.
400
-
-
... More
Earth work in excavation of foundation of structure as per drawing and technical specification.
River bank cutting with dewatering
720
-
-
... More
Site preparation
1
-
-
... More
RCC signboard
1
-
-
... More
Providing turfing as specified.
848
-
-
... More
BOULDER PITCHING AT TARANG RIVER IN VILLAGE AGECHOTO-SINGIMARI (SPOT-2)
-
-
-
... More
L.D.P. OF TARANG DWISA
-
-
-
... More
Supplying, fitting & placing TMT CRS(Fe-500) bar reinforcement as per drawing & technical specifications.
43
-
-
... More
Providing & laying filter material underneath the boulder pitching in slopes as specified.
200
-
-
... More
BOULDER PITCHING AT TARANG RIVER IN VILLAGE AGECHOTO-SINGIMAR(SPOT-1)
-
-
-
... More
Providing and laying boulder apron
22
-
-
... More
Plastering with cement mortar (1:3)on brick work in sub-structure complete as per drawing and technical Specifications.
221.72
-
-
... More
RCC signboard
1
-
-
... More
R.C.C.DROP SPILL WAY AT VILLAGE THURIBARI (PART-A)
-
-
-
... More
RCC signboard
1
-
-
... More
BOULDER PITCHING AT VILLAGE OWABARIUNDER
-
-
-
... More
Earth work in excavation of foundation of structure as per drawing and technical specification.
River bank cutting without dewatering
99.97
-
-
... More
Plastering with cement mortar (1:3)on brick work complete as per drawing and technical Specifications.
172.87
-
-
... More
Earth work in excavation of foundation of structure as per drawing and technical specification.
River bank cutting without dewatering
401.01
-
-
... More
Earthwork in excavation of diversion channel
525
-
-