Raja Ramanna Centre For Advanced Technology Tender
... More
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.
Raja Ramanna Centre For Advanced Technology - RRCAT Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date2 Jun 2023
Closing Date21 Jun 2023
Tender Amount₹ 1,09,00,000
Costs
EMD
₹ 2,18,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_RRCAT_756074_1Tender No
RRCAT/CSD/3092/W4220/23Dt 31.05.23Tender Authority
Raja Ramanna Centre For Advanced Technology ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Painting steel work in two coats of Aluminium paint of approved shade and make over one coat of steel primer including preparing surfaces, scaffolding and cleaning, tools & tackles, safety appliances etc. complete.The prefered make shall be as per specifications and as directed by Engineer-in Charge.
500
-
-
... More
In beams, slabs, lintels, bed blocks, chajjas, canopies, shelves, walls and
window cills, Staircase etc.
75
-
-
... More
2. Reinforcement steel of grade Fe500 conforming to IS:1786 TMT bars of prefered make shall be from the plants of original manufacturer rolled from virgin material and not from their rerollers or conversion agents.
-
-
-
... More
Demolishing Reinforced cement concrete works by chiselling at all levels including scaffolding, cutting of reinforcement bars by gas cutting, straightening & stacking of steel bars and disposal of unserviceable materials within 50 metres lead etc. complete.
3
-
-
... More
Demolishing brick work in cement mortar at all levels including scaffolding, stacking of serviceable materials and disposal of unserviceable materials within 50 metres lead etc. complete.
15
-
-
... More
With approved quality murrum available from excavations within RRCAT premises by mechanical transport.
4500
-
-
... More
Providing, centering and shuttering at all heights using timber planks/steel plates including strutting and propping etc. upto first floor (not exceeding 4 mtr. height) and removal of the same for in situ reinforced concrete and in plain concrete work
-
-
-
... More
Excavation in Trenches, for pipes and sewers in all soils except soft and hard rock upto a depth not exceeding 1.5m including shoring and dewatering if necessary and refilling in trenches with selected excavated materials in layers not exceeding 25cm. consolidating etc. and disposing the surplus earth within a distance of 50m.complete .
50
-
-
... More
300 mm
100
-
-
... More
Providing & laying in position Cement concrete 1:2:4 using graded stone aggregate 40 mm max. size including consolidation, finishing, curing etc. complete but excluding formwork as per specifications
10
-
-
... More
Cement plastering to external surfaces of walls at all heights, 20mm thick, with cement mortar 1:4 over brick walls or concrete surfaces, including finishing rough (wooden float finish) hacking the concrete surfaces, double scaffolding wherever necessary, curing etc. complete
180
-
-
... More
Cement concrete 1:3:6 using graded stone aggregate 40 mm maximum size including machine mixing, consolidating, finishing, curing etc. complete including formwork, as per drawings, specifications and as directed by Engineer-in-charge.
15
-
-
... More
Dismantling/removing concertina barbed tape coil of 1050mm dia including MS angles posts/supports of any size & length including stacking anywhere in RRCAT campus, cutting, dismantling of concrete if any, making rolls, transportation etc. complete as per specifications and as directed by Engineerin-Charge
150
-
-
... More
Providing & fixing/erecting in position G.I. chainlink fabric fencing of required height above ground level with 10 guage GI chainlink mesh of size 50mmx50mm fixed to MS angles/RCC post including cost of p/f GI J hooks, bolts, nuts, washers, staples and p/f longitudinally 3 rows of 8 guage GI wires complete generally as per specifications and as directed by Engineer-inCharge.
120
-
-
... More
In foundations, footings, plinth beams, base of columns, flooring.
250
-
-
... More
Forming embankments upto an average height of 1.5m above ground level with selected approved soil, in layers not exceeding 300mm thick including breaking clods, watering, rolling each layer with power roller of minimum 8 tonnes capacity to attain at least 90% of the proctor density, dressing the sides and top to the required profile and grade etc. complete.
-
-
-
... More
3. The contractor shall supply a copy of Documentary evidence of purchase of steel, test certificates from the firms and also testing from third party if required to be arranged at no extra cost.
-
-
-
... More
150 mm
100
-
-
... More
Earthwork excavation in foundations in all soils other than soft and hard rock by mechanical means (hydraulic Excavator)/manual means upto a depth not exceeding 1.5 m. including shoring and dewatering, if necessary and refilling around foundations and in plinth with selected excavated earth, in layers not exceeding 250mm thick, consolidating etc., and disposing surplus earth within
a distance of 50 metre lead. (Depth of excavation shall be measured from the existing average ground level.)
100
-
-
... More
Providing & laying lean bitumen macadam for levelling course/camber correction with 4% binder using 60/70 Grade Bitumen by weight of total mix of aggregate consisting of 20mm and down grade including heating of binder and aggregate, handling of materials, mixing, transporting, spreading, finishing with paver to required levels, grade & camber, rolling with power roller etc. complete as per specification and including spreading the stone dust/lime on the finished surfaces.
300
-
-
... More
In foundations, footings, plinth beams, base of columns, flooring.
75
-
-
... More
Dismantling the existing structural steel work at all levels in M.S. channels, plates, angles, flats, R.S. joists, bolts etc. including scaffolding, cutting of structural steel members by gas cutting, removing the nuts, bolts, straitening of members & stacking within 50m lead out side the laboratories/ buildings etc. complete
0.5
-
-
... More
Dismantling/removing barbed wire or flexible wire rope in fencing including stacking anywhere in RRCAT campus, cutting, making rolls, transportation etc. complete as per specifications and as directed by Engineer-in-Charge.
150
-
-
... More
In columns, mullions, pillars, posts, struts
3
-
-
... More
Brick work in cement mortar 1:6 using table moulded chimney bricks having a compressive strength not less than 40kg/cm² in foundation & plinth upto FFL including curing, raking out joints above ground level, simultaneous pointing below G.L. etc. complete as per specifications,
12
-
-
... More
Note: 1Binding wire required for the work will have to be supplied by the contractor at their own cost and will not be measured for payment.
-
-
-
... More
On W.B.M. surface @ 0.40Kg/Sqm
2500
-
-
... More
Supplying, lowering, laying, RCC Socket & Spigot (S&S) spun pipes (Class NP2) of IS : 458 with necessary collars, laid to correct grade and levels at all depths including cutting to length, jointing with hemp yarn and C.M. 1:1, caulking the joints and finishing, curing, testing etc. complete.
-
-
-
... More
Providing, fabricating, cutting, erecting, and fixing in position structural steel works of any shape using ISMBs, Joists, channels, angles, flats, Tees etc.
of minimum grade Fe 250, at all levels including welding, painting with a primary coat of approved steel primer and transportation etc. complete. The prefered make shall be as per specifications and as directed by Engineer-in-Charge. (The welding weights shall not be measured for payments but cost of same shall be included in the rate.)
1.5
-
-
... More
Random rubble masonry using spotless black trap or approved local stone in foundation and plinth upto FFL, in cement mortar 1:6, including casting of block of size 200mm x 200mm in cement concrete 1:2:4 @ 2m c/c in each layer excluding bottom layer, racking out joints above ground level and simultaneous flush pointing below ground level/plinth level, curing, making weep holes of size 100mm dia (if required) etc. complete as per specifications and as directed by Engineer-in-Charge.
15
-
-
... More
Providing & laying in position Design Mix REINFORCED CEMENT CONRETE of M-25 grade at all heights using graded stone aggregate of
20mm max. size including machine mixing, weigh batching, mechanical vibration, consolidation, finishing, curing and cost of labour, machinery, and
materials etc. complete as per specifications but excluding shuttering, formwork and steel reinforcement. (Minimum Cement content shall not be less than 387kg/cum of concrete.)
-
-
-
... More
In foundations, footings, plinth beams, base of columns, flooring.
250
-
-
... More
Painting steel work with two coats of Synthetic enamel paint of approved shade and made over one coat of prefered steel primer including preparing surfaces, filling with putty, scaffolding and cleaning, tools & tackles, safety appliances etc. complete. The prefered make shall be as per specifications and as directed by Engineer-in Charge.
100
-
-
... More
In foundations, footings, plinth beams, base of columns, flooring.
50
-
-
... More
Important Note:(1)The bidder must possess valid EPF & ESIC registration as per relevant laws. The bidders need to deposit EPF & ESIC with appropriate authority. The reimbursement for the same shall not be made.(2)The payment of wages to labourers should be made through bank.
-
-
-
... More
600 mm
30
-
-
... More
(4) This item shall not be operated for items of dismentaling works,earth work,area dressing, routine garbage disposal etc as the same is covered under respective items.
-
-
-
... More
Providing & applying tack coat using bitumen emulsion (Rapid Setting) compying with IS:8887-1995 spraying the bitumen emulsion with mechanically operated spray unit,cleaning and preparing the existing road surface as per specifications and as directed by the Engineer-in-charge..
-
-
-
... More
(3) The contractor shall deploy as many number of labourers as required to ensure that work gets finished promptly.
-
-
-
... More
(2) The cost incurred for deployment of labourers,excavator,tractor,ladders,safety kit etc,conveying arrangements,payment of all taxes,insurance etc shall be deemed to be included in the quoted rate.
-
-
-
... More
Earthwork excavation over areas in all soils except soft and hard rock, dressing side slopes and excavated surfaces to the required profile, camber and grade, filling the low spots within a distance of 50 m, with approved excavated material in layers not exceeding 250 mm watering, consolidating etc. and disposing of surplus earth within a distance of 50 m to be levelled and dressed etc. complete.
1500
-
-
... More
Disposing debries, non value scrap, garbage, heaps of earth, rublles,rotton woodlogs and the like by deploying excavator with Operator and Khalasi including colecting the same in a tractor with driver and Khalasi for conveying the same to low lying areas including deploying labourers for unloading the material from tractor, levelling and dressing the ground at both the places i.e. at lifting point as well as at point of disposal so as to carry out the assigned work any where in RRCAT premises including the cost of all required tools & tackles,hire charges,fuel,necessary safety kit etc. complete as directed by the Engineer-in-charge.
20
-
-
... More
Painting the exterior walls and roof with two coats of prefered make acrylic emulsion of approved shade including preparing the surface by removing loose dust and dirt with stiff brush and washing the surface with clean water, treating the surface with antifungal chemical wherever required, filling holes with putty, scaffolding and cleaning, tools & tackles, safety appliances etc. complete. The prefered make shall be as per specifications and as directed by Engineer-in Charge..
200
-
-
... More
Providing and fixing reinforcement for reinforced cement concrete using TMT bars of prefered make having minimum yield strength of Fe 500 or higher grade as per IS:1786 at all levels including supplying, cutting, bending, fixing, tying in position with 1.6mm dia soft drawn annealed binding wire etc. complete including cost of binding wire as per drawing, the prefered make shall be as per specifications and as directed by Engineer-in-Charge.
20
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements