Puri Konark Development Authority Tender
... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 27,469Document Cost
₹ 6,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_PKDA_61653_1Bid Award Id
ViewTender No
TCN No 3 of 2020-21Tender Authority
Puri Konark Development Authority ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Filling in foundation and plinth by excavated earth including cost of all labour, T&P etc. all complete as per direction of Engineer-in-Charge 2/3rd of item No. 1.
154.76
-
155.76
... More
Supplyin all material, labour, T& P for providing M.S. Reinforcement for R.C.C. work including labor for cutting, bending, binding & tying the grills & placing in position including cost of binding wire & reinforcement including conveyance to site, complete as per direction of Engineer in charge.(FE 415 grade sttel of SAIL/RSP/JINDAL/VIZAG MAKE)
106
-
6886.82
... More
Suppying all laboaur and T&P for earth work excavation in all kind of soil including initial lead and lift including dressing & levelling the bed, depositing the soil clear of the work etc. complete as per direction of Engineer-in-Charge.
234.49
-
155.76
... More
Supplying all labour, materials and T&P for providing 6mm thick cement plaster (1:4) on the RCC surface including close deep chipping with slurry treatment with all taxes, lead ,T & P etc all complete as per direction of Engineer in Charge
184.75
-
150.97
... More
Top coping
12.46
-
10547.19
... More
Supplying all labour, materials and T&P for providing one coat of cement primer on the wall etc, all labour ,materials with all taxes, lead ,T & P etc all complete as per direction of Engineer in Charge
1359.94
-
56.74
... More
Sand filling in foundation including cost of material, labour & T& P with all taxes lead etc. all complete as per direction of Engineer-in-Charge.
33.44
-
556.03
... More
Col. Super structure
14.54
-
13969
... More
Plinth Bend
25.16
-
10547.19
... More
Base of column and footing
43.98
-
7001.22
... More
Suppying all materials, laboaur and T&P for providning cement concrete (1:3:6) using 40mm size CBHG metal with cost of all taxes , lead etc. complerte as per direction of Engineer-in-Charge.
26.2
-
4757.37
... More
Supplyin all material, labour, T& P for providing Fly ash brick masonary work using fly ash brick of 25cmx12cmx8cm. Size having crushing strength not less than 75 Kg/Sqcm. With dimensional tolerance ± 8 percent in cement mortar (1:6) in superstructure including cost all taxes, lead ,T & P etc all complete as per direction of Engineer in Charge .
122.47
-
4291.6
... More
Supplying all labour, materials and T&P for providing 12mm. thick cement plaster (1:6) on the wall etc, all labour ,materials with all taxes, lead ,T & P etc all complete as per direction of Engineer in Charge
1175.19
-
127.77
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements