Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date5 Nov 2024
Closing Soon23 Nov 2024
Tender Amount₹ 1,27,63,000
Costs
EMD
₹ 8,38,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEMRT_970508_1Tender No
7759/96M/E-Tender/BSR Circle/2024-25 dt. 18.10.24Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing and laying seal coat by manual means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510. Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST.
27750
73
-
Earth work in Embankment (For Patri) with ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M. in depth and earth work in patries should be including ramming and dressing the surface to required levels and slopes as directed by the Engineer incharge. as per S.I. No. 253 a Including cost of, all material, Bitumen, labour, T&P, royality , all taxes and labour cess complete. But excluding GST.
4560
100
-
Supplying Laying and Jointing of 350mm doa NP-3 type Hume pipe in position, Jointing with jute and stiff mixture of cement mortar in the proportion of 1:2 (1 Cement : 2 Fine sand) Including all cost of material, labour and T&P etc. and testing of joints complete in all respect.. Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST.
15
2415
-
Part (B) CC Part
Providing, laying, spreading and compacting stone aggregates of 22.4-53 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.
39
4240
-
Construction of un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix Flooring Machine.Technical Specification Clause 1501. Including complete shifting of matrials & Concrete etc and cost of all material, labour, T&P, royality, all taxes and labour cess complete . But excluding GST.
115
8050
-
Excavation in foundation in ordinary soil (Loam, clay or sand) upto 30 M and including lift upto 1.50 M and lead upto 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 M from the foundation trenches as per S.I. No. 251(a). Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST.
70
110
-
Providing and laying in cement concrete 1 : 4 : 8 (1 cement , 4 course sand, 8 graded stone ballast 40 mm nominal size) and curring complete, including supply of all materials, labour T&P etc. required for proper completion of the work as per direction of E/I. Including cost of all labour, T&P and all taxes complete. S.I. No. 281 but excluding GST. Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST.
14
6100
-
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202, 1204 and 12.5.800 R.C.C grade M 20 with 2 cm gauge approved stone grit, coarse sand & cement in the proportion of 3:1.5:1. Including cost of all labour, T&P, royalty, Labour cess and all taxes complete but excluding GST.
28
809
-
Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202. Including cost of all labour, T&P, Labour cess and all taxes complete but excluding GST.
17.5
8000
-
Earth work in Patri repair with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a Carted Earth lead upto 3.00 Km as per Technical Specification Clause 301.5 Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST.
110
210
-
Cost of maintenance for Bituminous work portion for IInd Year @ 1.50% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or as per Prevailing GO
9877270
-
-
Cost of maintenance for Bituminous work portion for IIIrd Year @ 3.00% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or as per Prevailing GO
9877270
-
-
Cost of maintenance for Bituminous work portion for IVth Year @ 4.50% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or as per Prevailing GO
9877270
-
-
Cost of maintenance for Bituminous work portion for Vth Year @ 6.00% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or as per Prevailing GO
9877270
-
-
Cost of maintenance for Cement Concrete work portion for IInd Year @ 0.25% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO
1369962
-
-
Cost of maintenance for Cement Concrete work portion for IIIrd Year @ 0.50% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO
1369962
-
-
Cost of maintenance for Cement Concrete work portion for IVth Year @ 0.75% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO
1369962
-
-
Cost of maintenance for Cement Concrete work portion for Vth Year @ 1.00% as per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO
1369962
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%