Pradhan Mantri Gram Sadak Yojana Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Civil And Construction
Road Construction
Eprocure
Opening Date2 Sep 2022
Closing DateCancelled
Tender Amount₹ 4,54,66,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Girth above 600mm to 900mm.

120

-

233.61

... More
Part B: Earth Work

-

-

-

... More
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.

2947.2

-

11.04

... More
Construction of unlined surface drains of average cross secvtional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lft upto 3m and lead of 50 m ( average lead 25 m) as per Technical specifications clause 307 By mechanical means (finshed work to be measured).

200

-

18.22

... More
Excavation in soil in Hilly Area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1

300

-

70.75

... More
Construction of embankment with approved material deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of tables 300.1and 300.2 as per techanical specification clause 301.5 .including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)

300

-

68.3

... More
Part C: Pavement

-

-

-

... More
GSB Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408.using naturally occuring Gravel complete job (finshed work is to be measured) ncluding cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)

530.5

-

1079.02

... More
WMM:- Providing ,laying ,spreading and compacting graded stone aggregate to Wet Mix Macadam specification Including premixing the material with water at OMC in Mechanical Mixer (Pug Mill) carriage of mixed material by tipper to site,laying in uniform layers in sub-base/ base course on a well prepaired sub base and compacting with smooth wheel roller of 80 to 100 KN weigh to acheive the desired density including lighting,barricading and maintanance of diversion etc as per table 400.11 & 400.12 and technical specifications clause 406.Including cost and carriage of all materials from approved plant to site with all leads and lifts and octori etc complete job (Finished work to be measured).

415.2

-

1918.37

... More
Prime Coat: Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. (Low Porosity) Including cost and carriage of all materials from approved plant to site with all leads and lifts and octori etc complete job (Finished work to be measured).

4152

-

53.42

... More
Tack Coat: Providing and Laying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 Kg per Sqm on the prepared bituminous surface cleaned with Hydraulic broom ar per technical specification clause 503 including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

19410

-

15.74

... More
Bituminous Macadam : Providing and laying of waste plastic bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder (3.041%) and waste plastic (0.26%)as per clause 5.1 of table 3 of IRC SP-98 , transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504.Including cost and carriage of all materials from approved plant to site with all leads and lifts and octori etc complete job (Finished work to be measured).

970.5

-

8118.08

... More
20mm thick OGPC: Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 bitumen (Bitumen @ 13.43 kg per 10 sqm and waste plastic @ 1.17 kg per 10 sqm) to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.(By Mechanical Means).Including cost and carriage of all materials from approved plant to site with all leads and lifts and octori etc complete job (Finished work to be measured).

19410

-

190.75

... More
Seal Coat: Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 (By Manual Means)Including cost and carriage of all materials from approved plant to site with all leads and lifts and octori etc complete job (Finished work to be measured).

19410

-

62.8

... More
Shoulders: Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam G-II specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.ncluding cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .)

736.8

-

2189.33

... More
Part D Cross Drainage

-

-

-

... More
a) 500mm dia Single Row

-

-

-

... More
Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.

442.56

-

282.6

... More
Type B (First Class) bedding, Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii) including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

46.5

-

1084

... More
Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109 including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

16.5

-

4996.67

... More
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

-

-

-

... More
750 mm Dia

82.5

-

5234.72

... More
500 mm Dia

75

-

5235.72

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC M-15 Grade. H/D Walls including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

277.72

-

5103.83

... More
Backfilling behind abutment ,wing and return wall (Grulnar Material) complete as per drawing & technical specifications clause 1204.3.8 including cost and carriage of all materials from approved source to site of work,including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

271

-

1119.55

... More
RCC Culvert 2.00M Span

-

-

-

... More
Dewatering / Diversion of Nallah during execution of work if found necessary including diversion of traffic during execution and makings the things good after completion of job incl. hire charges of land if found necessary. including cost and carriage of all materials from approved source to site of work withe all leads lifts, loading, unloading and Octori (finished work to be measured) complete job

1

-

10000

... More
Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.Ordinary rock.

102.98

-

282.6

... More
Type B (First Class) Bedding : Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii)including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

9.45

-

1084

... More
Providing concrete for plain/reinforced concrete PCC M10 in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203.including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) . including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

6.3

-

4996.67

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. PCC Grade M-15 including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

42

-

5103.83

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. PCC Grade M-20 including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

8.1

-

5604.63

... More
Plain/reinforced concrete in substructure complete as per drawings and technical specifications Clause 802, 804,805,806,807, 1202 & 1204. PCC Grade M-20 including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

7.09

-

5604.63

... More
Providing and laying cement concrete in super structure as per drawings and technical specification clause 800, 1205.4 and 1205.5. R.C.C Grade M-25 including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

6.24

-

7036.45

... More
Supplying , fitting and placing TMT bar reinforcement (Fe 415) in CULVERT complete as per drawing and technical specification clauses 1002, 1005 and 1202 including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

2.6

-

71298.1

... More
Backfilling behind abutment,wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 with (Graunlar marerial) including cost and carriage of all materials from approved source to site of work,including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

72

-

1119.55

... More
RCC Culvert 5.00M Span

-

-

-

... More
Dewatering / Diversion of Nallah during execution of work if found necessary including diversion of traffic during execution and makings the things good after completion of job incl. hire charges of land if found necessary. including cost and carriage of all materials from approved source to site of work withe all leads lifts, loading, unloading and Octori (finished work to be measured) complete job

1

-

10000

... More
Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.Ordinary rock(not requiring blasting)

178.5

-

282.6

... More
Type B (First Class) Bedding : Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii)including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

14.1

-

1084

... More
Providing concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. PCC Grade M-10 including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

9.4

-

4996.67

... More
Providing concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. PCC Grade M-15 including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

26.6

-

5103.83

... More
Providing concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. PCC Grade M-20 including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

30.4

-

5604.63

... More
Providing and laying Plain cement concrete in substructure complete as per drawings and technical specifications Clause 802, 804,805,806,807, 1202 & 1204. PCC Grade M-20 including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

12.34

-

5704.63

... More
Providing and laying cement concrete in super structure as per drawings and technical specification clause 800, 1205.4 and 1205.5. R.C.C Grade M-25 including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

24.07

-

7036.45

... More
Supplying , fitting and placing TMT bar reinforcement (Fe 415) in CULVERT complete as per drawing and technical specification clauses 1002, 1005 and 1202 including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

7.34

-

71298.13

... More
Backfilling behind abutment,wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 with (Graunlar material) including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

128.5

-

1119.55

... More
Part E: PCC Drain

-

-

-

... More
Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.

659.1

-

282.6

... More
Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii) including cost and carriage of all materials from approved source to site of work,including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

152.1

-

1084

... More
Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109 including cost and carriage of all materials from approved source to site of work,including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

101.4

-

4996.67

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC M-15 Grade including cost and carriage of all materials from approved source to site of work,including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

371.8

-

5103.83

... More
Part "F" Protection Work Edge wall/R-wall/B-wall and crate wall

-

-

-

... More
RR MasonryR/Wall (Avg Ht 1.75 Mtr)

-

-

-

... More
Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.

1492.8

-

282.6

... More
Type B (First Class) bedding,Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii) including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

223.92

-

1084.9

... More
Plain Cement Concrete PCC M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109 including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

149.28

-

4996.67

... More
Stone masonry work in cement mortar in Substructure complete as per drawing and technical specifications clauses 702,704, 1202 & 1204. Random Rubble Masonry, In cement mortar (1:5) mix. including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

1316.03

-

5441.1

... More
Random Rubble Masonry work Laid Dry complete as per drawing and technical specificatins Clauses 702, 707, 1202 & 1203. In Sub Structure including cost and carriage of all materials from approved source to site of work,including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

708.58

-

3163.87

... More
Back filling behind abutment, wing, wall, return wall, complete as per drawings and technical specification clause 1204.3.8.(Boulder material )including cost and carriage of all materials from approved source to site of work,including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

410.5

-

900

... More
Providing and laying PCC M20 Coping on the top of Retaining wall/Breast wall. complete as per drawing and technical specification Clause 615,710 &1204.3.11. including cost and carriage of all materials from approved source to site of work,including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

1866

-

200

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC M-15 Grade(Parapets) including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

190.33

-

5103.83

... More
PCC Toe / Edge Wall

-

-

-

... More
Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.

240.98

-

282.6

... More
Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii) including cost and carriage of all materials from approved source to site of work,including cost and carriage of all materials from approved

68.85

-

1084

... More
Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109 including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

45.9

-

4996.67

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC M-15 Grade including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

550.6

-

5103.83

... More
Back filling behind abutment, wing, wall, return wall, complete as per drawings and technical specification clause 1204.3.8.(Boulder material )including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete)

140

-

900

... More
Providing weep holes in plain/reinforced cement concrete abutment, wing wall & return wall with 100mm dia PVC pipe extending through the full width of the structures with slope of 1(v):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204. 3.7 including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .

120

-

236.6

... More
Part G: Road Furniture

-

-

-

... More
Providing and fixing retro- refllectorised cautionary , mandatory and informatory sign as per IRC :67 made of encapsulated lense type reflective sheeting wide clause 1701, 2.3 fixed over aluminum sheeting 1.5mm thick supported on a mild steel angle iron post 75 x75 x6mm steel tube firmly fixed to the ground by properly designed foundation with M-15 grade cement concrete 450 x450 x 600mm , 600mm below round level as per drawing and technical clause 801.

40

-

1605.68

... More
Providing & fixing PMGSY Information sign board with logo as per drawings & technical specifications as per drawing clause 1701 and annexure 1700.1.

2

-

12949.7

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703

6

-

2091.56

... More
Providing and Fixing PMSGY LOGO boards as per as per signage booklet of PMGSY

2

-

2000

... More
Provoding and Laying of hot applied thermoplastic compound 2.5 mm thich including reflecting glass beads @ 250 grm .Sqm, Thick of 2.50 mm is exclusive of surface applied glasss beads as per IRC 35. The finished surface to be levelled, uniform and free from streeks and holes as per clause 803 MORTH Specififications.

1090

-

553

... More
Total Construction cost

1

-

1

... More
Maintenance for five years

-

-

-

... More
1st year

1

-

487142.95

... More
2nd Year

1

-

730714.43

... More
3rd Year

1

-

974285.91

... More
4th Year

1

-

1217857.38

... More
5th Year

1

-

1461428.86



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.