Pey Jal Nigam Uttarakhand Tender
View complete overview of Uttarakhand Pey Jal Nigam Uttarakhand Tender
Pey Jal Nigam Uttarakhand Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date17 Nov 2023
Closing Date1 Dec 2023
Tender Amount₹ 29,60,000
Costs
EMD
₹ 75,000Document Cost
₹ 2,950Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_MDPEY_65628_1Bid Award Id
ViewTender No
6387/NIVIDA/1402 DT 10-11-2023Tender Authority
Pey Jal Nigam Uttarakhand ViewPurchaser Address
-Website
http://http://peyjal.uk.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
20 mm dia
3000
-
-
25 mm dia
2450
-
-
32 mm dia
450
-
-
Excavation of earth for pipe line in following strata lift upto 1.5m. Lead upto 30m. Including refilling,watering,ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m. Fromtrenches including supply of labour,T&P.etc complete.Assuming that 90%pipe line is laid in trenches ,it is estimated that 75% exavation will be in soil mixed with shingle,bajri&boulders and rest 25%will be in soft rock
-
-
-
Soil mixed with boulder and bajri
1348.28
-
-
Soft rock
457.76
-
-
Cartage of following sizes of G.M. valves/Air valve upto site of work and fixing the same in water supply lines including cost of valves, specials, labour and T&P complete in all respect but excluding the cost of earth work and construction of chamber
G.M. Gate Valve IS 778 Class - I
-
-
-
32mm dia
2
-
-
25 mm dia
8
-
-
20 mm dia
1
-
-
Cast Iron Air Vavle 15 mm dia
1
-
-
Supply of all materials, labours, T&P etc and construct gate valve chamber as per type design complete.
11
-
-
Supply of all materials, labours, T&P etc and construct air valve chamber as per type design complete.
1
-
-
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size).
3.6
-
-
Supply of all materials, labour, T&P etc and construction of R.C.C. Sump / CWR of following capacities (KL) with M.S. ladder outside & inside of the tank,installing and fixing of clorinator, M.S.M.H. cover with locking arrangement, cowl, outlet, over flow and wash out pipes with necessary sluice valves, pipe pieces (including cost of materials) flooring 0.60 M wide apron, painting with approved water proofing (apex) / enamal paint, testing, filling water for testing purpose etc. including supply of vertical pipes and specials, assuming bearing capacity as 8MT/M2 .
-
-
-
5.00 KL
1
-
-
Supply & Fixing an Iron Board and Printing on it as well as writing the details of Work on it.
1
-
-
Making ferrule connection in the existing main of G.I, A.C, PVC or any type of pressure mains with saddle piece, service connections, fittings and fixing of G.M. ferrule including tapping the main, but excluding the cost of earth work and cost of all materials.
-
-
-
Ferrule Connection (Labour cost only including index)
4
-
-
Providing and fixing brass bib cock of approved quality
4
-
-
Providing and fixing brass ferrule with C.I. mouth cover including boring and tapping the main
4
-
-
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD specifications.
27.4
-
-
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specification.
15.6
-
-