Northeast Frontier Railway Tender
View complete overview of NFR Tender
Costs
EMD
₹ 10,15,100Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
EL-LM-24-25-23-RT-LUMDING DIVISION-ELECTRICAL/N F RLYTender No
EL-LM-24-25-23-RTTender Authority
Northeast Frontier Railway ViewPurchaser Address
-Website
http://ireps.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Supply,assembly, alignment, fitting, fixing, installation and commissioning of 20 KWp capacity of solar on grid power plant. Contents:- 1.20Kwp Mono Perc half cut Solar Panel PV & solar power conditioning unit MPPT based 2-GI module mounting structure. 3-Lightening Arrestors, Earthing etc. 4- Connecting wires, MCB's, cashing pipe, accessories, etc. as required. 5-Civil works for installation of Module mounting structure including sand, gravels, cement etc. 6- Electrical works for distribution of Loads from PCU . 7-Transportation Up to the destination. 8- Installation & commissioning included. 9- The rooftop solar should be enabled with Real-time Monitoring system : 4 RTUs enable real-time monitoring of various parameters such as power output, energy production, system efficiency, units generated and environmental conditions. This allows for immediate detection of issues and performance tracking Remote Control: So that the Operators can remotely control the solar system, including starting or stopping inverters, adjusting settings, and responding to faults without needing to be physically present at the site.10-Insurance & Five year CAMC. 11- Trim branches that directly shade the solar panels during peak sunlight hours as per instruction of site engineer. The work to be executed as per direction of engineer in charge at site. If any other items have been omitted but required for efficient working of solar power plant it would be responsibility of contractor to supply and provide such items. However the quoted rate shall be inclusive of those items.
16
1169313
18709010.4
Supply,assembly, alignment, fitting, fixing, installation and commissioning of 10 KWp 5 capacity of solar on grid power plant. Contents:- 1. 10Kwp Mono Perc half cut Solar Panel PV & solarpower conditioning unit MPPT based 2-GI module mounting structure. 3- Lightening Arrestors, Earthing etc. 4- Connecting wires, MCB's, cashingpipe, accessories, etc. as required. 5- Civil works for installation of Module mounting structure including sand, gravels, cement etc. 6- Electrical works for distribution of Loads from PCU . 7- Transportation Up to the destination. 8- Installation & commissioning included. 9- The rooftop solar should be enabled with Real-time Monitoring system : RTUs enable real-time monitoring of various parameters such as power output, energy production, system efficiency, units generated and environmental conditions. This allows for immediate detection of issues and performance tracking Remote Control: So that the Operators can remotely control the solar system, including starting or stopping inverters, adjusting settings, and responding to faults without needing to be physically present at the site.10-Insurance & Five year AMC/CAMC. 11- Trim branches that directly shade the solar panels during peak sunlight hours as per instruction of site engineer. The work to be executed as per direction of engineer in charge at site. If any other items have been omitted but required for efficient working of solar power plant it would be responsibility of contractor to supply and provide such items. However the quoted rate shall be inclusive of those items. The rooftop solar should be enabled with Real-time Monitoring system : RTUs enable real-time monitoring of various parameters such as power output, energy production, system efficiency, units generated and environmental conditions. This allows for immediate detection of issues and performance tracking Remote Control: So that the Operators can remotely control the solar system, including starting or stopping inverters, adjusting settings, and responding to faults without needing to be physically present at the site.
16
584656
9354505.12
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%