Irrigation And CAD Department Tender
... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Irrigation And CAD Department Tender
Civil And Construction
Opening Date16 Nov 2023
Closing Date30 Nov 2023
Tender Amount₹ 6,88,027
Costs
EMD
₹ 8,150Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
685749Bid Award Id
ViewTender No
3/2023-24, Dated 10.11.2023Tender Authority
Irrigation And CAD Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing and laying insitu vibrated M-15 (28 days cube compressive strength not less than 15 N/sq mm) grade cement concrete using 40mm down size approved, clean hard, graded aggregates for foundation clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour formwork cleaning, batching mixing placing in position, levelling vibrating, finishing curing etc., complete with initial lead upto 50 m and all lifts. (Foundations, approns, cutoff walls) (Cement content: 260kg/cum with use of super plasticiser (0.4% by wt. of cement) CA: 0.90cum, Blending Ratio of CA- 50:30:20, FA: 0.40cum)
5
31825
6365
... More
Surface cleaning of metal surface by chemical cleaners and then by hand and power tool cleaners and removing dust. After cleaning applying primary coat with two coats of Zinc chromite red oxide primer followed by finishing coats 2 coats with synthetic enamel paint with material labour and all accessories with all leads and lifts where surface cleaning by sand blasting is not feasible and based on specific recommendations of designers, it is to adopt surface preparation done manually by hand and power tool after cleaning by chemical tratement to remove grease, rust scaling etc and to form phasphate coating to prevent further rusting, before applying primer painting.
118
70446
597
... More
Estimate Contract Value
-
688027
-
... More
Supply of Rubber side seal (music note type claded) size 50mm bulb 15mm thick 110mm width inculding 11.30mm Dia holes 150mm center to center for Arm Crest Gates, Confirming to IS 11855. The rate is inculding cost of materials, transporting charges, all incidental charges complete and for delivery at section stores as directed by the Engineer - in - charge.
8
9048
1131
... More
Labour charges for removing the damaged and spolied rubber seals and Bolts and nuts from gates at Top, bottom and side and corner and cleaned with Diesel, wire brushes, cotton waste at Rubber seal portion. Replacing with new Rubber seal at top, bottom, side and corner applying with P.V.C. Gum solution, fixing with new stainless steel bolts. The rate is inculding cost of labour charges, trasporting charges, incidental charges, fabrication charges, finished item of work trail run afater replacemetn of rubber seals as directed by the Engineer- in - charge.
3
18000
6000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements