Department Of Water Supply And Sanitation Tender

View complete overview of Punjab DWSS Tender

Department Of Water Supply And Sanitation

Metal FabricationCivil Works
Views393 Views
Downloads154 Downloads

Opening Date

16 Sep 2021

Closing Date

25 Oct 2021

Tender Amount

₹ 97,82,000

Costs

  • EMD

    ₹ 1,50,000
  • Document Cost

    ₹ 1,000
  • Tender Fee

    ₹ 5,900

Summary

Construction Of 06 Nos New Rcc Ohsrs Cluster 2 In Place Of Non Existing Ohsrs In Various Villages Of Block Harsha Chhina District Amritsar

Description

Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

  • Tender Id

    Unregistered TenderId
  • BidAward Id

    Unregistered BidAwardId
  • Tender No

    Data for unregistered User Data for unregistered User Data for unregistered User Data for unregistered User
  • Tender Authority

    Data for unregistered User Data for unregistered User Data for unregistered User Data for unregistered User
  • Purchaser Address

    Authority for unregistered User
  • Email

    Data for unregistered User
  • Website

    wwww.unregistereduser.com

BOQ Items

ItemQuantityUnitsRateAmount
... more
Construction of 06 No RCC OHSRs of various Capacities with sill levels (not to be less than) and FSLs (not to be less than) from ground level in villages mentioned as follows, complete with external RCC stair case with landing slabs at each staging, RCC roofs, ventilator, single manhole cover, lightening conductor, plinth protection, water level indicator, prov., fixing and laying of Rising Main and Delivery Main to be connected to existing pipeline network etc. complete duly tested and handed over in proper working order to the satisfaction of Engineer-Incharge. The construction of OHSRs shall be as per standard drawings/design of DWSS uploaded with this bid document. However, if (i) the height of Sill Level(s) and FSL(s) of OHSR(s) to be constructed is more than the standard drawings/design. (ii) the bearing capacity at site after allotment comes out to be less than 8.75 t/sq.m Then the contractor shall submit revised design from reputed Engineering Institute to fulfill the requirements of additional height and less Bearing Capacity at site. However, key parameters of OHSR(s) like tank portion diameter and center to center distance of columns etc. shall NOT be reduced. The revised structural design shall NOT be downward revised in any case. The responsibility for structural safety of OHSR(s) shall be of the contractor. Nothing extra shall be paid to the contractor on account of increase in height of OHSR(s) and cost of submission of revised design/drawings. However, in case of variation due to upward revision in the design due to lesser bearing capacity encountered at site than 8.75t/sqm¬¬, then the additional quantities for items of work which that could have to be executed on account of less Bearing Capacity than 8.75 t/sqm shall be paid at CSR plus ceiling premium applicable at the time of tendering. .
---
... more
Cost of conducting soil bearing capacity test shall be borne by the bidder. The lump sum rates should also included the cost of all material like cement, steel, fine aggregate, coarse aggregate, scaffolding, shuttering labouretc, whatsoever. Providing and installing inlet, outlet, scour and over flow D/F DI Pipes as per (IS 8329 with latest amendments), including the cost of DI Specials like Duck foot bend, DI Double Flange S.Vs., one each with inlet, outlet, scour pipe along with construction of suitable size haudies and C.I/D.I D/F expansion Joints, Bell mouth and Flanged Puddle Collar. All the pipes & specials shall be duly ISI marked. These lump sum rates shall also include lightening conductor, aluminum and steel ladder, GI railing, nut and bolts and all other specials and accessories whatsoever, complete in all respects to the entire satisfaction of Engineer-in-charge in following villages The difference in quantities from the standard drawing based on 8.75 tone per sqm. to the safe bearing capacity will be paid as per CSR+prevailling celling premium). It also includs, providing & fixing automatic Electronic water level control device & Construction of Plinth Protection around OHSR with masonary toe wall & 0.90 mtr. width appron with 40mm thick CC1:2:4 on top over 100 mm thick CC 1:8:16 & inside earth filling including overflow haudi complete in all respect, Including Carriage.
---
... more
Village Dhariwal (OHSR of capacity 50 CUM, Staging Height = 17.00 M and F.S.L. = 20.00 M)
1Job--
... more
Village Khatrai Khurd + Khatrai Kalan (OHSR of capacity 75 CUM, Staging Height = 19.00 M and F.S.L. = 22.00 M)
1Job--
... more
Village Bagga Khurd (OHSR of capacity 25 CUM, Staging Height = 15.50 M and F.S.L. = 17.20 M)
1Job--
... more
Village Majjupura (OHSR of capacity 50 CUM, Staging Height = 17.00 M and F.S.L. = 20.00 M)
1Job--
... more
Village ChhinaKaram Singh (OHSR of capacity 50 CUM, Staging Height = 17.00 M and F.S.L. = 20.00 M)
1Job--
... more
Village Jagdev Kalan (OHSR of capacity 150 CUM, Staging Height = 23.50 M and F.S.L. = 27.50 M)
1Job--
... more
CONDITIONS :-
---
... more
The OHSR wise allotted amount is for the entire Capital Works and Testing on a "Single responsibility" basis such that the total lump sum allotted price, subject to any adjustments in case of less SBC than specified, covers all the Contractor's obligations mentioned in or to reasonably inferred from the bidding documents in respect of the design, including procurement and subcontracting (if any), delivery, construction, hydraulic testing and completion of the capital works as set out in the condition. This includes all requirements under the contractor's responsibilities for testing, pre-commissioning and commissioning (as applicable) of the works and, where so required by the Bidding document, the acquisition of all permits, approvals and licenses, etc. ; all in accordance with the requirements of the conditions of contract.
---
... more
All classes of work not otherwise described shall be executed in according with the principals laid down in the book of specifications latest edition 1963 with correction slips and amendments upto date or as per latest relevant IS Code, whichever is more stringent
---
... more
All rates included in the above contract schedule of rates will be paid subject to the notes provided in the CSR. All amendments issued upto the date of opening of tenders will be applicable on the contract schedule of rates.
---
... more
The rates also include the testing of the structures for the tightness and emptying if so desired.
---
... more
Approximate quantities have been taken in the DNIT and these can vary and payment will however be made as per actual work done at site. The cost of operation and maintenance will be met from revenue collected from consumers.
---
... more
All the works included in the DNIT have to be completed
---
... more
The distance for carriage of sand, bazri, bricks etc. are tentative, these can vary. Payment will however be made as per actual lead involved from nearest quarry/kiln to site of work
---
... more
Splitting of any item is not allowed. Any lapse will render the tender liable to be rejected
---
... more
Only antique thick letters have written in the DNIT however complete item as CSR will be applicable
---
... more
Description of all CSR items read as per CSR-2020 with latest amendments
---
... more
NOTE :-
---
... more
Item for which no rates or price has been entered in will not be paid for by the Employer when executed and shall be deemed covered by the other rates and prices in the Bill of Quantities
---
... more
Unit rates and prices shall be quoted by the bidder in Indian rupees
---
... more
There is a discrepancy between the rate in figures and words will govern
---
... more
Where there is a discrepancy between the unit rate and the line item total resulting from multiplying the unit rate by quantity, the unit rate quoted shall govern
---
... more
Payment of environment management charges will be released after successful plantation period of 3 months, if applicable
---
... more
Rates of all credit items quoted by the bidder will be considered as negative (i.e. amount to be deposited to the department)
---
... more
Rates of construction of OHSRs are on lumpsum basis and nothing extra will be payable like carriage, material etc., whatsoever
---
Evaluation Notes How It Works ?

Result

No Result Available
Click here to view all tender results of this authority
Business Providers

Check Business Providers

Business Seekers

Check Business Seekers

https://bidassist.com/pricing/1?referer=Banners
7 DAY
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.
whatsapp chat