Department Of Coir Development Tender

... More
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Department Of Coir Development Tender

Works
Eprocure
Opening Date20 Jan 2020
Closing Date27 Jan 2020
Tender Amount₹ 51,57,000 
Notes
Download

Costs

Summary

Azhekode Cvcs Ltd No. 69 Construction

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Roofing with GI hard colour powder coated traffold sheets 0.35 mm thick or nearest available thickness with over lap 150mm at ends and GI hook crank CI bolts and nuts including pain washersand bitumen washers etc complet

32.49

-

-

... More
Doors and shutters

2

-

-

... More
Pump 1.5 hp

1

-

-

... More
Random rubble in cement mortar 1:8 for foundation and basement

27.38

-

-

... More
Earth work excavation in ordinary soil and despositing on bank with initial lead upto 50 m and lift upto 1.5 m including breaking clods, watering, ramming and sectioning of soil bank etc. complete

18.24

-

-

... More
TOILET

-

-

-

... More
Dry stone masonry for foundation and basement

9.9

-

-

... More
Flooring in cement concrete 1:4:8 using 40 mm brocken stone including cost of all material, labour charge etc. complete

1

-

-

... More
Floor plastering with cm 1:3 12 mm thick over the concrete including cost of all material, labour charge etc. complete

97.92

-

-

... More
Floor plastering with cm 1:3 12 mm thick over the concrete including cost of all material, labour charge etc. complete

187.79

-

-

... More
Earth work excavation in ordinary soil and despositing on bank with initial lead upto 50 m and lift upto 1.5 m including breaking clods, watering, ramming and sectioning of soil bank etc. complete

6.34

-

-

... More
Flooring in cement concrete 1:4:8 using 40 mm brocken stone including cost of all material, labour charge etc. complete

9.79

-

-

... More
Godown Trussed Roof

-

-

-

... More
Plastering in CM 1:3 9mm for ceiling and sunshade including cost of all material labour charge etc. complete

34

-

-

... More
Steel reinforcement for RCC work including straightening , cutting bending, placing in position and binding all complete up to plinth level

200

-

-

... More
Random rubble masonary in CM 1 :6 for foundation and basement including cost of all material labour charge etc complete for foundation and basement

12

-

-

... More
Random rubble in cement mortar 1:8 for foundation and basement including cost of all material, laboour charge etc. complete for foundation

28

-

-

... More
Flooring in cement concrete 1:4:8 using 40 mm brocken stone including cost of all material, labour charge etc. complete

18.77

-

-

... More
Floor plastering with cm 1:3 12 mm thick over the concrete including cost of all material, labour charge etc. complete

21

-

-

... More
Flooring with cement concrete 1:5:10, 75 mm thick using 40mm (nominal size) broken stone

44.84

-

-

... More
Late rite masonry in CM 1:6 for superstructure including cost of all material labour charges etc complete

3.27

-

-

-

-

-

... More
TOILET

-

-

-

... More
Painting

1

-

-

... More
Roofing galvanised iron corrugated sheets .8 mm thick or nearest available size with overlaps of 150mm at ends and G.I.hooks or crank bolt and nuts including plane washers and bitumen washers etc. complete

125

-

-

... More
TOILET

-

-

-

... More
Cement washing one coat and white washing two coats over the walls including cost of all material , labour charge etc. complete

551

-

-

... More
Plastering with CM 1:4 12mm thick over the roof slab including cost of all material, labour charge etc. complete

39

-

-

... More
TRESS WORK

-

-

-

... More
Supplying and fixing MS grills to walls for fully openable windows and ventilators with standard MS sections as per the designs and drawings.

16

-

-

... More
Roofing with GI hard colour power coated traffod sheets .35mm thick or nearest available thickness with overlap 150mm at ends and GI hook or cranck CI bolts and nuts including plain washers and bitumen washers etc complete

174

-

-

... More
Ridge capinging with pre painted galvanized steel sheet .5mm thick 60cm wide including all cost and materials, conveyance, labour charges etc. complete

5.7

-

-

... More
Supplying and fixing MS grills to walls for fully openable windows and ventilators with standard MS sections as per the designs and drawings.

9

-

-

... More
Ridge capinging with pre painted galvanized steel sheet .5mm thick 60cm wide including all cost and materials, conveyance, labour charges etc. complete

19

-

-

... More
Supplying and fixing wood work for doors, windows and ventilators including cost of all materials and labour charge etc complete. (Aanjili with painting)

4

-

-

... More
Solid cement block masonry for super structure using solid cement blocks of available size in cm 1:8

16

-

-

... More
Roofing galvanised iron corrugated sheets .8 mm thick or nearest available size with overlaps of 150mm at ends and G.I.hooks or crank bolt and nuts including plane washers and bitumen washers etc. complete

175

-

-

... More
Electrification

1

-

-

... More
Plastering with cement mortar 1:5, 12mm thck floated hard and towelled smooth one coat

145

-

-

... More
Late rite masonry in CM 1:6 for superstructure including cost of all material labour charges etc complete

24

-

-

... More
Supplying and fixing wood work for doors, windows and ventilators including cost of all materials and labour charge etc complete.(D - 5, w - 6)

11

-

-

... More
Steel work built up tubular trusses etc including cutting, hoisting, fixing position and applying a priming coat of steel primer, including welding and bolted with special shaped washers etc complete hot finished seamless type tube

696

-

-

... More
Electrification and water supply

1

-

-

... More
Earth work excavation in ordinary soil and despositing on bank with initial lead upto 50 m and lift etc. complete for building work

26.75

-

-

... More
Ridge capinging with pre painted galvanized steel sheet .5mm thick 60cm wide including all cost and materials, conveyance, labour charges etc. complete

18.44

-

-

... More
Ridge capinging with pre painted galvanized steel sheet .5mm thick 60cm wide including all cost and materials, conveyance, labour charges etc. complete

22

-

-

... More
Earth work excavation in ordinary soil and depositing on bank with initial lead and lift etc. complete for building work

2.37

-

-

... More
REST ROOM AND TOILET

-

-

-

... More
Steel reinforcement for RCC work including straightening , cutting bending, placing in position and binding all complete up to plinth level

500

-

-

... More
Random rubble masonary in CM 1 :6 for foundation and basement including cost of all material labour charge etc complete for foundation and basement

3.71

-

-

... More
Cement washing one coat and white washing two coats over the walls including cost of all material , labour charge etc. complete

260.67

-

-

... More
Cement washing one coat and white washing two coats over the walls including cost of all material , labour charge etc. complete

47.25

-

-

... More
Earth work excavation in ordinary soil with in an intial lead of 50 m and lift 1.5m including labour charge etc. complete

8

-

-

... More
Roofing with GI hard colour power coated traffod sheets .35mm thick or nearest available thickness with overlap 150mm at ends and GI hook or cranck CI bolts and nuts including plain washers and bitumen washers etc complete

173.38

-

-

... More
Steel work in tubular

1250

-

-

... More
Plastering with CM 1:4 12mm thick for inside and outside the wall including cost of all material, labour charge etc. complete

32.52

-

-

... More
Electrification

1

-

-

... More
Plastering with CM 1:4, 12 mm thick for inside and outside the wall including cost of all material, labour charge etc complete

261

-

-

... More
Plastering with CM 1:4 12mm thick for inside and outside the wall including cost of all material, labour charge etc. complete

16.32

-

-

... More
Steel work built up tubular trusses etc including cutting, hoisting, fixing position and applying a priming coat of steel primer, including welding and bolted with special shaped washers etc complete hot finished seamless type tube

696

-

-

... More
RCC 1:2:4 using 20 mm brocken stone including cost of all material labour charge etc complete

4.5

-

-

... More
Supplying and fixing wood work for doors, windows and ventilators including cost of all materials and labour charge etc complete.

13

-

-

... More
Steel work built up tubular trusses etc including cutting hoisting position and applying a priming coat of steel primer, including welding and bolted with special shapes washers etc. complete hot finished seamless type tubes

1274

-

-

... More
Steel work in built up sections trusses and framed work with M.S. angles, Plates Tees etc. straightening cutting fabricating and hoisting including applying a coat of iron primer

1120

-

-

... More
Electrification

1

-

-

... More
Office Maintenance

-

-

-

... More
Plastering in CM 1:3 9mm thick ceiling and sundhade including cost ofall aterial labour charge etc. complete

14.73

-

-

... More
Supplying and fixing wood work for doors windows and ventilators including cost of all materials and labour charge etc complete (D - 3, w - 8)

11

-

-

... More
Plastering with cement CM 1:4 12mm thick for inside and outside the wall including cost of all material, labour charge etc. complete

260.67

-

-

... More
Earth work excavation in ordinary soil and despositing on bank with initial lead and lift etc. completefor building work

19

-

-

... More
RCC 1:2:4 using 20 mm brocken stone including cost of all material labour charge etc complete

1.89

-

-

... More
RCC 1:2:4 using 20 mm brocken stone including cost of all material labour charge etc complete

5

-

-

... More
Cement washing one coat and white washing two coats over the walls including cost of all material , labour charge etc. complete

192

-

-

... More
Fan light

1

-

-

... More
Providing and fixing MS Grills of required pattern in frames of ventilator etc with MS flats square or round bars etc.including priming coat with approved steel primer all complete. Fixed to steel ventilator by welding

96

-

-

... More
Steel reinforcement for RCC work including straightening , cutting bending, placing in position and binding all complete up to plinth level

200

-

-

... More
Providing three window with shutter

3

-

-

... More
Cement washing one coat and white washing two coats over the walls including cost of all material , labour charge etc. complete

261

-

-

... More
Door frame

1

-

-

... More
Plastering in CM 1:4 12mm thick for inside and outside the wall including cost of all material labour charge etc.

159

-

-

... More
Flooring with cement concrete 1:5:10, 75 mm thick using 40mm (nominal size) broken stone

49.4

-

-

... More
Floor finishing with cement grout on existing cement cencrete flooring after plastering with cm 1:3 9mm thick one coat

81.45

-

-

... More
Flooring with cement concrete 1:5:10, 75 mm thick using 40mm (nominal size) broken stone

75

-

-

... More
Floor plastering with cm 1:3 12 mm thick over the concrete including cost of all material, labour charge etc. complete

98

-

-

... More
Supplying and fixing MS grills to walls for fully openable windows and ventilators with standard MS sections as per the designs and drawings.

17.04

-

-

... More
Steel work in built up sections trusses and framed work with M.S. angles, Plates Tees etc. straightening cutting fabricating and hoisting including applying a coat of iron primer

3070

-

-

... More
Floor plastering with cm 1:3 12 mm thick over the concrete including cost of all material, labour charge etc. complete

188

-

-

... More
Flooring in cement concrete 1:4:8 using 40 mm brocken stone including cost of all material, labour charge etc. complete

0.1

-

-

... More
WORK SHED

-

-

-

... More
Roofing galvanised iron corrugated sheets .8 mm thick or nearest available size with overlaps of 150mm at ends and G.I.hooks or crank bolt and nuts including plane washers and bitumen washers etc. complete

112.36

-

-

... More
WORK SHED AND REST ROOM

-

-

-

... More
RCC 1:2:4 using 20 mm brocken stone including cost of all material labour charge etc complete

1.87

-

-

... More
Late rite masonry in CM 1:6 for superstructure including cost of all material labour charges etc complete

15

-

-

... More
Random rubble masonary in CM 1 :6 for foundation and basement including cost of all material labour charge etc complete for foundation and basement

40.18

-

-

... More
Plastering with CM 1:4 12mm thick for inside and outside the wall including cost of all material, labour charge etc. complete

550.04

-

-

... More
Steel work built up tubular (Round, squae or rectangular hollow tubes etc) trusses etc. Including cutting hoisting fixing position and applying a priming coat of steel primer including welding and bolted with special shapped washers etc complete hot dinished seamless type tubes

129.96

-

-

... More
Laterite massonary in CM 1:6 for super structure including cost of all material labour charge etc complete

52.65

-

-

... More
Roofing with GI hard colour power coated fraffod sheets .35 mm thick or nearest available thickness with over laps 150 mm at ends and GI hook or crank CI bolts and nuts including plain washers and bitumin washers etc complete.

319

-

-

... More
Steel reinforcement for RCC work including straightening , cutting bending, placing in position and binding all complete up to plinth level

200

-

-

... More
Roof plastering with cement mortar 1:3 9mm thick floated hard and trowelled smooth one coat

89.3

-

-

... More
Flooring in cement concrete 1:4:8 using 40 mm brocken stone including cost of all material, labour charge etc. complete

10

-

-

... More
Electrification & water supply

1

-

-

... More
Steel reinforcement for RCC work including straightening , cutting bending, placing in position and binding all complete up to plinth level

200

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.