Chief Conservator Of Forest Tender

... More
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Chief Conservator Of Forest Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date18 Nov 2023
Closing Date13 Dec 2023
Tender Amount₹ 11,01,243 
Notes
Download

Costs

Summary

Construction Of Chain Link Fencing

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement- All work up to plinth level: 5.1.2 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20mm nominal size de rived from natural sources) In sub structure (per post) 0.30x0.30x0.15 =0.0135 CuM 0.125x0.125x0.375= 0.005859 CuM Total= 0.019359

5.44

-

9564.04

... More
Columns, Pillars, Piers, Abutments, Posts and Struts For bed of post (per post) 0.50x1.875 = 0.9375

254.98

-

919.62

... More
Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all lcomplete above plinth level. 5.22A.1 Mid steel and Medium Tensile steel bars b) 6 mm dia bar 14x0.40x0.222 = 1.2432 Kg

338.16

-

101.71

... More
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete For bed of post (per post) 1.20x0.15= 0.18 Sqm

48.93

-

352.13

... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15˚ landings, balconies, shelves, chajjas, bands, plain window sills, staircase and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering finishing and reinforcement with 1:1.5.3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone agggregate 20 mm nominal size derived from natural sources). In super structure- 0.125x0.125x1.50 = 0.023438 CuM

6.52

-

12256.98

... More
Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 Kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for seperately):- Payment to be made per metre cost of total length of barbed wire used. (Per 100 M) With G.I. barbed wire: 100 M x 3 strand = 300.00 M

1989

-

14.24

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. 5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. Reinforcement TRM (per post) a) 8 mm dia bar 2 sides x 4 nos. x 0.30x0.395 = 0.948 Kg 3 sides x2.175x0.395 = 2.577375 Kg Total=3.5253 75 Kg

958.47

-

102.51



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.