The ZP has issued a formal invitation for competitive bids for the Zilla Parishad project, for Construction Of Diversion Road From 0.00 Km To 2.20 Km At Gourandih Begunia Ocp Within Barabani Block In The District Of Paschim Bardhaman Zilla Parishad For 2024-2025. in Paschim Bardhaman, West Bengal, with an estimated contract value of Rs. 3,89,10,788. The bid opening date for this tender is 18-01-2025 and the last date for bid submission is 08-02-2025. Interested bidders for Zilla Parishad tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Zilla Parishad - ZP Tender

Opening Date18 Jan 2025
Closing Date8 Feb 2025
Tender Amount₹ 3,89,10,788.77 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Concrete Barrier (For Concrete Block) Earth work in excavation of foundation trenches in all sorts of soil (including mixed soil but excludimg stony and moorum soil) including removing spreading or stacking the spoils within alead of 150 mtr as directed and including trimming the side of trenches leveling dressing and ramming the bottom, bailing or pumping out water etc as required complete. Depth of excavation Up to 3.00mtr (Without pumping out water and shoring).

612

104

63648

... More
(PART-C) ROAD FURNITURE WORKS R.C. Guard post Supplying fitting and fixing R.C. guard post 1.37m long with C.C. 1:2:4 with graded stone chips of 13.2mm down casting , curing complete including cost of providing 4nos.of 12mm dia. rod of length 1.54m as main reinforcement and 6 nos. of round shaped 8mm dia rods used as binders; the placing of the first binder should be at 75mm below the top finished surface and the other 5 nos of binders should be placed at 245mm c/c ; the guard post is of octagonal section with inscribed circle of dia 24cm at the base tapering to orresponding dimensions of 16cm at the top including two coats of painting with best quality synthetic enamel paint of approved make and grade to form 6 nos. horizontal alternate bands in hite/tannery yellow and black to 90 cm length standing up above ground after mending good damages if any during striking off shuttering, making hole in ground of 47cm depth and 30cm. minimum dia, fixing the guard posts in the same holes and repacking the earth properly so as to keep the guard posts standing properly erect in correct position true to line and length including carriage of R. C. Guard Post with due care to the site including loading into the truck and unloading at site complete in all respect. With Pakur variety stone chips

150

773

115950

... More
Supplying, fitting and placing reinforcement in Foundation including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications. With Tor steel rod.

3.03

56765

171999.83

... More
Furnishing and Placing Reinforced Cement concrete in Super-structure with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement and admixtures, as necessary, including labour, cost and carriage of all materials and including preparation of design mix and cost for quality control, sampling, testing etc. all complete as per drawing and technical specification including the cost of necessary form work and staging complete. as per drawing and technical specifications. RCC Grade M25, Using Concrete Mixer For solid slab super-structure, Height upto 5m.

88.14

6723

592570.51

... More
(PART-D-CROSS DRAINAGE WORKS) (Cross Drain)Excavation for Structures Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 for Rural Roads of MORD including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (Ref :- P- 284 It No-12.01)

272.66

124

33809.84

... More
Providing and fixing M.S information board of 1.2m x0 .75 m size made with 1.5 mm plate welded over angle iron (40mm x40 mmx5 mm) in both sides (Side stands) and (20mm x 20mm x 3 mm )in top and bottom and diagonal bracing with MS flat( 50mm x50 mm x6 mm) having total height 1.5m above GL and side stands embeded in a depth of 0.6m into 1:2:4 PCC including writing and painting as per direction complete.

2

3397

6795.32

... More
Plain /Reinforcd cement concrete in Substructure with coarse aggregate of appropriate nominal size and grading ,fine aggregates (sand) conforming to proper grading zone , both of approved quality ,cement and water reducing admixtures ,as necessary ,including labour ,cost and carriage of all materials and including preparation of design mix ,approval of the same by the Engineer -in-charge and cost for quality control ,sampling, testing etc ,All complte as per drawing and technical specification , M-25 Grade of concrete

123.85

6242

773079.13

... More
Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade.cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing and Clause 801 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). i) 90 cm equilateral triangle

20

4246

84920

... More
Providing and laying Design Mix concrete for plain /reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works. M-15 Grade. Using concrete mixer.

59.18

4796

283878.77

... More
Add Labour welfare cess @ 1%

1

385112

385112.34

... More
Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand.(Compaction factor of dry clean sand is 0.835 )

54.32

691

37545.98

... More
Supplying, fitting and placing reinforcement in Sub-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications. With Tor steel rod.

14.58

56898

829581.88

... More
Do-Do-DO Hectometer stone (precast)

10

450

4500

... More
Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall / return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical specifications.

200

115

23000

... More
Plain /Reinforcd cement concrete in Foundation with coarse aggregate of appropriate nominal size and grading ,fine aggregates (sand) conforming to proper grading zone , both of approved quality ,cement and water reducing admixtures ,as necessary ,including labour ,cost and carriage of all materials and including preparation of design mix ,approval of the same by the Engineer -in-charge and cost for quality control ,sampling, testing etc ,All complte as per drawing and technical specification , M-25 Grade of concrete (P- 286, Item No.12.05/d i)

25.7

5931

152428.24

... More
By Mix in Place Method : Construction of granular sub-base by providing graded material, mixing by mix in place method with Rotavator at OMC, spreading in uniform layers with Motor grader on prepared surface inproper grade and camber, compacting with vibratory roller to achieve the desired density, including lighting, guarding, barricading,including cost of all materials, machinery, tools and plants including cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). GSB: Grading-IV

741.29

1752

1298821.62

... More
Do-Do-DO 80 mm x 60 mm rectangular

10

5208

52080

... More
Painting the vertical end faces of posts ,………………………by the Engineer in charge with approved synthetic enamel paint (a) Two coats.

53.87

99

5333.13

... More
Wet Mix Macadam Base Course Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including screening of aggregates and granular materials, premixing the material with water at OMC inWet Mix Plant, carriage of mixed material by tipper to site, laying in uniform layers with Paver in Sub- base / Base course on well prepared surface and compacting with Vibratory Roller to achieve the desired density, including supply of all materials, machinery, fuel and lubricants, including incidental costs for lighting, guarding, barricading, making earthen bundh to protect the edges including cost of quality control complete as per Clause 406 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).Pavement- 2 Layer (125 mm thick+125 mm thick)=250 MM

2167.5

2244

4864325.18

... More
Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 for Rural Roads of MORD. (Mode of measurement: pre works and post works)

9888

85

846412.8

... More
Drum Sheet Walling 1.40m (av.) high on Sal-bullah / Eucalyptus bullah piling 10 cm dia. and 3.25m long driven 1.75m (av.) below G.L. and 75cm centre to centre including fitting fixing 3 nos. of half bullah pieces (from 10 cm dia) and drum(empty bitumen) sheet (approved condition) of height 1.5m , cutting and straightening drum sheet (each joint must have lap length of min.50mm) including cost of necessary nails, bolts, nuts etc. and providing 2 to 3m long half bullah ties of 10cm dia. @ 2.25 m centre to centre fixed with 10 cm dia. bullah posts driven 1.5m below G.L. including cost of all materials and one coat of coal tarring to all bullah etc. complete as per direction. Using Eucalyptus bullah .

300

1244

373200

... More
Add GST, as applicable @ 18%

1

5876776

5876776.34

... More
Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand.(Compaction factor of dry clean sand is 0.835 ) (Ref :- P- 286 It No-12.04)

201.63

691

139366.66

... More
Providing and laying Design Mix concrete for plain /reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works. M-15 Grade. Using concrete mixer.

163.29

4796

783280.9

... More
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, cross drain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. Where staging is not required.

360

214

77040

... More
Water Bound Macadam Sub Base Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base by consolidating Jhama metal (63 mm to 45 mm) with moorum screening : cum

255

1863

475284.3

... More
Kilometre Stone Reinforced cement concrete M15 grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc.Ordinary kilometer stone (precast)

3

1577

4731

... More
(PART-A) ROAD WORKS Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specifications Clause 201 for Rural Roads of MORD (II) By Mechanical Means a) In area of non-thorny jungle

1.28

23363

29787.83

... More
Plain / Reinforced Cement Concrete in Substructure with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality, cement and water reducing admixtures, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete as per drawing and technical specification including the cost of necessary form work and staging complete as per drawing and technical specifications. PCC Grade M 20

624.75

5146

3215413.32

... More
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.

1360

24

32640

... More
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.

264.2

24

6340.8

... More
Drainage spouts in superstructure including providing drip moulding and also including supplying fitting and fixing approved type of materials complete as per drawing and Technical specification vide clause no 2705 of MoRT&H specification for Roads & Bridge works.

40

783

31320

... More
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, cross drain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. Where staging is not required.

1785

214

381990

... More
By Mix in Place Method : Construction of granular sub-base by providing graded material, mixing by mix in place method with Rotavator at OMC, spreading in uniform layers with Motor grader on prepared surface inproper grade and camber, compacting with vibratory roller to achieve the desired density, including lighting, guarding, barricading,including cost of all materials, machinery, tools and plants including cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). GSB: Grading-V

867

1872

1623110.7

... More
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.(Vol -I P.W.D Ref :- P- 47 It No-3)

90.84

24

2180.16

... More
Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including.

102

691

70502.4

... More
Supplying, fitting and placing reinforcement in Super-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications. With Tor steel rod.

10.38

57766

599616.17

... More
(PART-B-CROSS DRAINAGE WORKS) R.C.C BOX CULVERT -1X2X2 -2 Nos, Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge .

206.37

124

25589.88

... More
Plain/Reinforced cement concrete in Superstructure with coarse aggregates of appropriate nominal size and size and grading , fine aggregate (sand) conforming to proper grading zone , both of approved quality ,cement and water reducing admixtures ,as necessary ,including labour ,cost and carriage of all materials and including preparation of design mix , approval of the same by the Engineer-in -charge and cost for quality control, sampling ,testing etc . All complete as per drawing and technical specification including the cost of necessary form work and staging complete as per drawing and technical specifications, M-30 Grade

5.63

5376

30268.17

... More
Construction of Embankment with Material Obtained from (Carried Earth) Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 for Rural Roads of MORD. (Mode of measurement: pre works and post works)

7650

261

2003535

... More
By Mix in Place Method : Construction of granular sub-base by providing graded material, mixing by mix in place method with Rotavator at OMC, spreading in uniform layers with Motor grader on prepared surface inproper grade and camber, compacting with vibratory roller to achieve the desired density, including lighting, guarding, barricading,including cost of all materials, machinery, tools and plants including cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). GSB: Grading-III

650.25

1802

1171835.03



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.