The Zilla Parishad has issued a formal invitation for competitive bids for Supply, Installation, Testing And Commissioning Of 4kwp Off-grid Rooftop Solar Pv Power Plant At Jiranpur Office Building Under Jiranpur Gram Panchayat Within Cooch Behar-i Panchayat Samity In The District Cooch Behar in Cooch Behar, West Bengal, with an estimated contract value of Rs. 4,84,520. The bid opening date for this tender is 09-09-2024 and the last date for bid submission is 17-09-2024. Interested bidders for Zilla Parishad tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Zilla Parishad Tender
Energy, Oil and Gas
Solar Installation and Products
Electrical and Electronics
Eprocure
Opening Date9 Sep 2024
Closing Date17 Sep 2024
Tender Amount₹ 4,84,520
Costs
EMD
₹ 9,690Document Cost
₹ 2,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ZPHD_747049_1Bid Award Id
ViewTender No
eNIT NO 07/JRNPR/2024-25 (SL 01)Tender Authority
Zilla Parishad ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Supply of ACDB : Designed for 3 kWp Off-grid solar power plant with all protections as per MNRE guidelines.DC DPBs shall have sheet from enclosure of dust & vermin proof conform to IP 65 protection. The bus bars are made of copper of desired size. Suitable capacity fuse & MCBs/MCCB shall be provided for controlling the DC power output to the PCU along with necessary surge arrestors and suitable battery MCB's are used between Battery and solar PCU in DCDB . AC Distribution Panel Board (DPB) shall control the AC power from PCU/ inverter, and should have necessary surge arrestors. Interconnection from ACDB to mains at LT Bus bar while in grid tied mode.All switches and the circuit breakers, connectors should conform to IEC 60947, part I, II and III/ IS60947 part I, II and III. All the Panel’s shall be metal clad, totally enclosed, rigid, floor mounted, air - insulated, cubical type suitable for operation on three phase / single phase, 415 or 230 volts, 50 Hz.All indoor panels will have protection of IP54 or better. All outdoor panels will have protection of IP65 or better.
1
10200
10200
... More
Supply of Offgrid solar PCU Rating : 6 KW, 1Ph Off-grid Inverter – 1 Nos with nominal DC voltage 48-96 V DC., Make: Anchor-Panasonic/ Siemens /Microtek/ Power One. Control : Microprocessor /DSP. Off-grid Inverter .Nominal AC output voltage : 230V, 1 Phase, . Output frequency : 50 Hz . Max. DC input Power 6kW. MPPT Voltage Range 60 - 660 VDC. . Output Voltage Range - 180V - 260V AC. Grid Frequency Synchronization range : +/- 5 %. Ambient temperature considered : -10o C to 55 ℃. Humidity : 90 % Non-condensing. Protection of Enclosure :: IP-21(Minimum) for Indoor. Grid Frequency Tolerance range : +/- 5 %. Grid Voltage tole rance : 180 V to 260 V. No-load losses : Less than 1% of rated power. Inverter efficiency 92%. THD : 3%. Efficiency Measurement IEC 61683/ Equivalent BIS Std.Environmental testing IEC 60068-2 (1,2,14,30) / Equivalent BIS Std.Interfacing with utility grid IEC 61727. Islanding Prevention Measurement IEC 62116. EMI/EMC : IEC 61000-6-316 Amps IEC 61000-6-416 Amps. Safety: IEC - 62109-1 (2010/4) C - 62109-2 (2011/6). All above IEC’s should be from NABL/ IEC Accredited Testing Laboratories or MNRE Approved Test Centers/ International laboratories.
1
78289
78289
... More
Supply of System Earthings : Each array structure of the PV yard should be grounded/ earthed properly as per IS:3043-1987. In addition the lighting arrester/masts should also be earthed inside the array field, PCU, ACDB and DCDB should also be earthed properly. Earth resistance shall not be more than 5 ohms. It shall be ensured that all the earthing points are bonded together to make them at the same potential.
1
10925
10925
... More
Add GST 18%
1
73178
73178
... More
Add Labour welfare cess 1%
1
4797
4797
... More
Lightning Protection: The SPV power plants shall be provided with lightning &overvoltage protection. The main aim in this protection shall be to reduce the over voltage to a tolerable value before it reaches the PV or other sub system components. The source of over voltage can be lightning, atmosphere disturbances etc. The entire space occupying the SPV array shall be suitably protected against Lightning by deploying required number of Lightning Arrestors. Lightning protection should be provided as per IEC standard. The protection against induced high-voltages shall be provided by the use of metal oxide varistors (MOVs) and suitable earthing such that induced transients find an alternate route to earth.
1
8275
8275
... More
Supply of Solar Photovoltaic Panels.Poly Crystalline. 335 Wp (Each) (Make: Havells/TATA/WARRE) The PV modules used must qualify to the latest edition of IEC PV module qualification test or equivalent BIS standards Crystalline Silicon Solar Cell Modules IEC 61215/IS14286 .The rated output power of any supplied module shall have tolerance of +/- 3%.The peak-power point voltage and the peak-power point current of any supplied module and/or any module string (series connected modules) shall not vary by more than 2 (two) per cent from the respective arithmetic means for all modules and/or for all module strings, as the case may be.The module shall be provided with a junction box with either provision of external screw terminal connection or sealed type and with arrangement for provision of by-pass diode. The box shall have hinged, weather proof lid with captive screws and cable gland entry points or may be of sealed type and IP-65 rated.
12
196176
16348
... More
Battery Bank Capacity should be 12 V , 200 Ah. Tubular C10 Lb Acid Solar batteries conforming to IEC-61427 & IS-1651 /IS 13369 Standards, low maintenance, stationery at C/10 rate). It will be staged in racks duly painted with acid resistant paint to cover less space. (Make. Microtek/Exide/Okaya solar Tubular)