Water Resources Development Directorate Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Water Resources Development Directorate - WRDD Tender
Civil And Construction
Irrigation Work
Eprocure
Opening Date3 Apr 2025
Closing Date22 Apr 2025
Tender Amount₹ 11,35,637
Costs
EMD
₹ 22,800Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_WRDD_832070_8Tender No
02 /RIDF XXX /WRDD /BANK/ 2024 25 of the Executive Engineer AI Bankura AI IP Division BankuraTender Authority
Water Resources Development Directorate ViewPurchaser Address
-Website
http://http://wbwridd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Foundation of Module Mounting Structure: Suitable and stable Reinforced Cement Concrete foundation for dual axis manual tracking SPV Module structure as per drawing.
(a) For 7/8 module structure.
3
11519
34557
... More
Power conditioning unit with IP54 enclosure :
Supply , transport , installation and commissioning of IP 54 protected enclosured Inverter Unit qualifying IEC 61683-Efficiency measurement and IEC 60068-2-Environment Standard , safety standard suitable for 3 Phase A.C. motor, IGBT based high voltage switching inverter with MPPT technology, to take care of the variation of Sun light and will be suitably mounted inside the metal enclosure. Inverter should have protection against Dry run, Over current, Under current, Over voltage, Under voltage, Short circuit etc. System should be able to run at low sunshine and minimum 7 to 8 hours a day run should be possible during normal sunshine.condition. Inverter should have option to auto start for any short trip off due to low light/ cloudy situation except for dry run. Inverter should be provided with a display to show the various parameter by the user such as Voltage, Current, Solar panel DC voltage, Inverter IGBT temperature, Out put AC voltage, Output frequency, Pump flow (direct or calculated method), Irradiation etc . The system should store the data at a set interval, be capable to transfer it ti external stroage device and support communication of its operational parameters and logs over Modbus protocol. It should also monitor and save total run time, total water pumped etc .There should be provision for interfacing GPRS based data transmission. (a) For 2Hp capacity pump motor set
3
32097
96291
... More
Cable and Accessories: Supplying, fitting of UV rated Copper Cable laid inside HDPE conduit and other accessories as per following with necessary connection with the solar PV Module, MPPTetc (i) 4.0 Sqmm single core multi studs - 5 mtr (for 2 HP) (iii) Lugs, HDPE pipe, Flexible Pipe, Saddle, Cable tie etc.
(a) For 2 HP per structure.
3
3434
10302
... More
Earthing : Earthing with 50 mm dia G.I. Pipe 3.64 mm thick x 3.04 Mtr long and 1 x 4 SWG GI (Hot Dip) wire (4 mts. Long) 13 mm dia x 80 mm long G.I. bolts double nuts double washers incl. S & F 15 mm dia G.I. pipe protection (1 Mts long) to be filled with bitumen partly under the ground level and partly above ground level driven to an average depth of 3.65 Mts. below the ground level as below. By ISI Medium G.I. pipe including excavation of soil for installation of Earth Electrode and filling & ramming and connecting to individual structure to earth electrode including S&F 20 mm x 3 mm galvanised (Hot Dip) MS flat on wall/floor with GI saddles as required and connection to equipments incl. drilling holes, with bolts, nuts washers etc.
3
2661
7983
... More
Connection the equipment to earth busbar including S & F GI (Hot Dip) wire of swg on wall / floor with staples buried inside wall / floor as required and making connection to equipments with bolts, nuts, washer, cable lugs etc as required and mending good damages.
60
13
780
... More
a) Lighting System at Scheme : (with lighting Pole) : Dusk to dawn lighting arrangement of 4 mtr height above ground level, with Hot Dip galvanised 80 mm x 50 mm medium duty pipe, with 12 V, 15Ah 2-in-1 Lithium ion / Ferro- Phosphate battery with in-built 7- 11 watt LED lamp, 50Wp solar panel to cover the scheme area. The lighting system should be warranted for 5 years from the date of installation.
3
19030
57090
... More
Lighting protection (Pole mounted) : Lighting protection with 1.5" G.I. pipe of 4 mtr + 0.75 mtr height with base flange in proper RCC foundation and S & F lighting conducter Air Terminal made of 20 mm dia 1000 mm long GI pipe (ISI Medium) having five discharge prongs of 4 SWG GI (Hot Dip) wire at top duly soldered with 7/16 stranded GI (Hot Dip) wire and 85 mm dia 6 mm thick GI base plate at bottom incl. necessary holes etc. Earthing with 65 mm dia G.I. pipe (Medium) 3.0 Mts long and 1 x 19/10 stranded G.I. (Hot Dip) wire (4 Mts. long) 20 mm dia x 125 mm long galvanized bolt double nuts, double washer including socking at both ends of stranded G.I. (Hot Dip) wire by crimping sockets/ thimbles and S & F 65 mm dia G.I. pipe (ISI Medium) protection (3 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level to an average depth of 3.65 Mts. (Provision of one lightning protection for each structure)
3
6725
20175
... More
Supply and installation of 3 phase electromotor pump-motor set suitable for Solar operation covering
5 years warranty for the following conditions including loading, unloading, transportation etc.:-
-
-
-
... More
(a) 2 HP ISI marked as per IS 9079 surface mounted Monoblock Pump-motor set with 2.60 - 2.78 Lps discharge at 26 mts. total head suitable for 2.0 Ha CCA Sprinkler operation with foot valve required quantity of flexible suction pipe (15m), clamps bend footvalves and all other accessories to complete connection of suction and delivery side
3
28284
84852
... More
Testing and commissioning of scheme after completion of all work
3
2000
6000
... More
(a) Construction of Pump motor shed of height 0.85m (as per drawing) with Hot dip Galvanised ISA 25x25x3 & 1.5 mm MS sheet including foundation Base of 0.95 x 0.65m for pump unit (BFS, .075mm 1:2:4 PCC, 100mm 1:1.5:3 CC) - For 2HP and 3HP surface pump.
3
4965
14895
... More
Comprehensive maintance charge for 4 years beyond 1 year warranty period (which cover monthly inspection, yearly training to WUA to attend breakdown within 3 day and to keep the scheme in operation without lapse of time) (a) For 2 HP both for Submersible & Surface pump Note :- Total Comprehensive maintance charge is to be withheld in addition to Security Deposite. Comprehensive maintance charge will be released @ Rs. 0.80 for 2 HP (ii) Rs. 0.80 for 3 HP ((iii) Rs. 0.60 for 5 HP & 10HP Submersible & Surface per Wp per year at the end of each maintance period i.e. at the end of 1st year, 2nd year, 3rd year,4th & 5th year. In case the "Bidder" dose not provide service during the warranty & comprehensive maintance period, the amount so held up will be forfeited.
6600
4
26400
... More
Insurance @ 2% for item No. 1, 4, 8, and 10 for a period of 5 years Note :- 2 1st year Insurance charge is to be paid on production of original Receipt of premium payment. Remaining 4 years Insurance payment is to be withheld which will be released during 2 nd, 3rd, 4th, & 5th year on production of original Receipt of premium payment.
451347
-
9026.94
... More
Remote monitoring for 5 years: Provision for remote monitoring for the pumps must be made in the pump controller through an integral arrangement having following basic functions:
a. Controller must be assigned with a unique serial number and its live status must be observed remotely on online portal through login credentials.
b. Live status must indicate whether controller is ON/ OFF. The parameters i.e. the water output, water flow rate, in fault condition, array input voltage/ current, power and motor frequency should at logged at an interval of 10 minutes c. Controller must have a back up to store the data locally ( at least for 1 year) supply & installation of GSM/GPRS based Data Transmitter or Modem and to provide remote monitoring service to transmit the parameters to central server from the solar pumping system with time stamp at user-defined interval and report generation at the buyer end. (Refer Technical Spec.)
3
21850
65550
... More
Cleaning and washing of modules once in a month with clear water to remove deposited dust and dirt on the module surface and keep the modules clean throughout the year. The activity to be performed for eight months in a year excluding four monsoon months. A log book should be maintained at thr site for the said purpose.
120
300
36000
... More
Supply fitting and fixing including transporation of sign board for identifying the exact location of MINI RLI scheme (one at road side and other at site) the board will be made 3 mm thick plate of size 300 mm x 600 mm and fitted and fixed on 50 mm GI of IS 1239/90 (Part-) including cutting, welding LS and writting of both sides of sign board. Base-yellow, and Words - Red both bottom end of the stands pipes will be grouted in 1:2:4 CC - on single brick flat soling. This will include one materials and labour complete as per drawing and direction of EIC.
1
3677
3677.51
... More
QRC HDPE Pump connecting nipple 63 mm
3
243
729
... More
HDPE Pipe with Quick Release Coupler (Pipe of Class 3.2 Kg/cm2) 63 mm dia. 6m long
123
762
93726
... More
HDPE Tee with coupler (63mm)
3
412
1236
... More
HDPE Bend with coupler 90 degree (63mm)
3
280
840
... More
HDPE End Plug (63 mm)
6
118
708
... More
HDPE 63 mmService saddle
27
435
11745
... More
End Riser Pipe 3/4" diameter x 100 cm
27
197
5319
... More
Sprinkler Nozzles Full Circle (1.7 to 2.8 kg/cm2)
27
691
18657
... More
Campaigning in the command area of one no clustered SPSIS Sub- project by community workers for mass awareness , capacity building to achieve sustainability of Sub-projects. Cost include wage payment to community workers, transportaton, leaflet etc.
1
1300
1300
... More
Demarcation of command area, selection of beneficiaries and preparation of land schedule within the Command area of one no clustered SPSIS Sub-project having CCA 10.5 Ha
1
1200
1200
... More
Meeting Cost for WUA formation, cost including Refreshment, training materials, transport local conveyance, wage payment to community worker, remuneration to resource person and incidental charges
2
1000
2000
... More
Registration Cost for WUA under suitable act ( Society ) deed writing including registration charge, conveyance cost & opening of Bank A/C etc.
1
1200
1200
... More
Livelyhood plan / Micro plan formulation cost for minor irrigation scheme, cost including refreshment, training materials, transport local conveyance, wage payment to community worker, remuneration to resource person and incidental charge ( rate on meeting )
4
1200
4800
... More
Meeting and onsite demonstration for operation & maintenance of Scheme , water manangement and mode of collection of water tax, building of corpus fund etc
2
1200
2400
... More
IEC Materials ( Leaflet, poster, notebook )= 8 meetings, for SL - 2 and SL - 4
24
35
840
... More
Documentation Cost for activities of WUA Scheme by photography, report booklet etc in both hard and soft copy.
1
500
500
... More
Impact study & monitoring of scheme by site visit of 2 Community workers during 3 years’ period
6
700
4200
... More
ADD GST @ 18 %(Except item No-28 to 36)
937403.45
-
168732.62
... More
ADD CESS @ 1%
1106136.07
-
11061.36
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements