Water Resources Development Directorate Tender

... More
The WRDD has issued a formal invitation for competitive bids for the Water Resources Development Directorate project, for Installation Of New Solar Mini Rli Scheme At Payraura-iii in West Midnapore, West Bengal, with an estimated contract value of Rs. 26,09,910. The bid opening date for this tender is 08-03-2025 and the last date for bid submission is 25-03-2025. Interested bidders for Water Resources Development Directorate tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Water Resources Development Directorate - WRDD Tender

Works
Energy, Oil and Gas
Electrical and Electronics
Solar Installation and Products
Eprocure
Opening Date8 Mar 2025
Closing Date25 Mar 2025
Tender Amount₹ 26,09,910.04 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Installation Of New Solar Mini Rli Scheme At Payraura-iii

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cleaning and washing of modules once in a month with clear water to remove deposited dust and dirt on the module surface and keep the modules clean throughout the year. The activity to be performed for eight months in a year excluding four monsoon months. A log book should be maintained at thr site for the said purpose.

160

300

48000

... More
110 mm.dia IS.NO.10124/2009 Part-4 with latest amendment.PVC End Cap.(Cl-III) with free solvent cement.

2

230

460

... More
Carriage chagre as applicable

1

6297

6297.66

... More
100 mm dia. dia sluice valve.

2

54

109.38

... More
Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand.

34.52

357

12323.64

... More
Brick work in cement mortar (1 : 6) with first class kiln burnt bricks including racking out joints, scaffolding and other incidental works etc. complete in foundation and plinth. (a) In superstructure ground floor.

6.49

5514

35785.86

... More
Module Mounting Structure ( For 2HP, 3HP and 5HP Solar Water Pumping System): Supply , transportation & installation of G.I manual tracking structure made of MS hollow sections, pipes, plates, angles etc as per IS 1161/1239, 1079/2062, to hold min 300 Wp SPV Module as per drawing and specification of MNRE . The steel structure is to be protected with minimum 80 micron galvanisation(hot dip) and provided with dual axis manual tracking arrangement three times in a day and seasonal tilting are to be regulated to face the sun optimally. [The weight of the Module Mounting Structure holding 4 Modules should not be less than 195Kgs, holding 6 Modules should not be less than 210 Kg and holding 8 Modules should not be less than 245 Kg. (250Kg for 6 module structure]

1260

157

197820

... More
Ordinary Cement Concrete (mix 1:2:4) with graded stone chips (20 mm. nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevent IS codes.Pakur Variety

4.37

5623

24574.26

... More
Remote monitoring for 5 years: Provision for remote monitoring for the pumps must be made in the pump controller through an integral arrangement having following basic functions: a. Controller must be assigned with a unique serial number and its live status must be observed remotely on online portal through login credentials. b. Live status must indicate whether controller is ON/ OFF. The parameters i.e. the water output, water flow rate, in fault condition, array input voltage/ current, power and motor frequency should at logged at an interval of 10 minutes c. Controller must have a back up to store the data locally ( at least for 1 year) supply & installation of GSM/GPRS based Data Transmitter or Modem and to provide remote monitoring service to transmit the parameters to central server from the solar pumping system with time stamp at user-defined interval and report generation at the buyer end. (Refer Technical Spec.)

1

21850

21850

... More
80 m dia Ruber Insertion (Table-17)

11

95

1045

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints, including throating, nosing and drip course, scaffolding/staging where necessary (ground floor) excluding cost of chipping over concrete surface.with (1:6) cement mortar, 15 mm. thick plaster

97.38

144

14022.72

... More
Compresed Asbestos fibre jointing for Quadruped & Tripod set( for raised surface of Flange as per IS-6392) 300mm.dia(Table-5)

2

1018

2036

... More
150 m dia Ruber Insertion(Table-5)

12

166

1992

... More
Installation of Sloar Module and Accessories

-

-

-

... More
100 m dia Ruber Insertion(Table-17)

21

129

2709

... More
Labour charges for fitting, fixing 110 mm. Dia. Alfa-Alfa valve with 110 mm. dia.P.V.C. pipe with the help of flanged P.V.C. tail-piece by joining the P.V.C.End of Tail-piece and riser pipe with coupler and flanged end of Tail-piece and Alfa-Alfa valve with rubber insertion, nuts and bolts etc.

9

112

1009.89

... More
Supplying, fitting and fixing including transportation of sign board for identifing the exact location of Major RLI scheme (one at road side and other at site) the board will be made 3 mm thick MS plate of size 300 mm × 600 mm and fitted and fixed on 50 mm GI Pipe of IS 1239/90 (part-1) including cutting, welding and writting of both sides of Sign board. Base - Yellow, and ward Red. Both bottom end of the stands pipe will be grouted in 1:2:4 CC on a single brick flat soiling. This will include one materials and labour complete as per drawing and direction of EIC.

1

3677

3677.51

... More
Add Cess 1% in all item from Sl No. 2.01 to 2.27

1

3559

3559.57

... More
140 x 110 mm Reducer(cl-II) with free solvent cement,I.S. 10124/2009, Part-3.

4

283

1132

... More
Hire and labour charges for shuttering with centreing and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing and striking out after completion of works. (upto roof of ground floor). Above 30mm to 37 mm. thick wooden shuttering as per decision & direction of Engineer-in-charge.

15.39

334

5140.26

... More
110 mm. dia 600 bend(cl-II) ( IS. No. 10124/ 2009 Part- 8 with latest amendment ) with free solvent cement.

6

378

2268

... More
Power conditioning unit with IP54 enclosure : Supply , transport , installation and commissioning of IP 54 protected enclosured Inverter Unit qualifying IEC 61683-Efficiency measurement and IEC 60068-2-Environment Standard , safety standard suitable for 3 Phase A.C. motor, IGBT based high voltage switching inverter with MPPT technology, to take care of the variation of Sun light and will be suitably mounted inside the metal enclosure. Inverter should have protection against Dry run, Over current, Under current, Over voltage, Under voltage, Short circuit etc. System should be able to run at low sunshine and minimum 7 to 8 hours a day run should be possible during normal sunshine.condition. Inverter should have option to auto start for any short trip off due to low light/ cloudy situation except for dry run. Inverter should be provided with a display to show the various parameter by the user such as Voltage, Current, Solar panel DC voltage, Inverter IGBT temperature, Out put AC voltage, Output frequency, Pump flow (direct or calculated method), Irradiation etc . The system should store the data at a set interval, be capable to transfer it to external storage device and support communication of its operational parameters and logs over Modbus protocol . It should also monitor and save total run time, total water pumped etc . There should be provision for interfacing GPRS based data transmission. For 5 HP capacity Pump-motor set

2

56882

113764

... More
Foot valve leather washer 100mm dia,

2

234

468

... More
Demarcation of command area, selection of beneficiaries and preparation of land schedule within the Command area of one New Major RLI having CCA 20.5 Ha [Approved estimate regarding activities for institutional development for sustainability of project

1

3500

3500

... More
100 mm dia Galv. MS Flanged Pipe with flange as per IS 1239 (Part-I)/2004 & 6392/1971, table 17 Specification.ISI MARKED

24

2474

59376

... More
110 mm. dia P.V.C. pipe class-II ( with a loose matching coupler,class-II) marking IS No. 4985/ 2000 with latest amending with free solvent cement.

12

284

3408

... More
Livelyhood plan / Micro plan formulation cost for minor irrigation scheme, cost including refreshment, training materials, transport local conveyance, wage payment to community worker, remuneration to resource person and incidental charge ( rate on meeting ) [Approved estimate regarding activities for institutional development for sustainability of project

3

3000

9000

... More
Earth work in filling in trenches after laying pipe lines (PVC,RCC,ACP etc.) with good earth obtained from excavation of field trences in layer not exceeding 225 mm , including watering & ramming etc. layer by layer complete. (payment will be made on the basis of measurement of finished quantity of work)

780.51

66

51521.47

... More
Rubber Insertion I.S. 638/1979 with latest amendment sheet 5 mm. 2 Ply. ( for raised surface of Flange as per IS-6392) 150 m dia Ruber Insertion(Table-17)

25

166

4150

... More
Foundation of Module Mounting Structure: Suitable and stable Reinforced Cement Concrete foundation for dual axis manual tracking SPV Module structure as per approved drawing. For 4 module structure

2

11519

23038

... More
Meeting Cost for WUA formation, cost including Refreshment, training materials, transport local conveyance, wage payment to community worker, remuneration to resource person and incidental charges [Approved estimate regarding activities for institutional development for sustainability of project

1

3000

3000

... More
150 mm. dia I.S.I. 14846/2000 Amd No. ISI mark and specification PN- 1.6 sluice valve .

2

9950

19900

... More
G.I. 150 mm dia 90º M.S bend both end flanged ISI marked-IS 1239,Galv-IS 4736

2

8175

16350

... More
Solvent cement extra (Medium duty)

5

425

2125

... More
Supplying, fitting and fixing including transportation of sign board for identifing the exact location of MINI RLI scheme (one at road side and other at site) the board will be made 3 mm thick MS plate of size 300 mm × 600 mm and fitted and fixed on 50 mm GI Pipe of IS 1239/90 (part-1) including cutting, welding and writting of both sides of Sign board. Base - Yellow, and ward Red. Both bottom end of the stands pipe will be grouted in 1:2:4 CC on a single brick flat soiling. This will include one materials and labour complete as per drawing and direction of EIC.

1

3677

3677.51

... More
150 mm dia Galv. MS Flanged Pipe with flange as per IS 1239 (Part-I)/2004 & 6392/1971, table 17 Specification. ISI MARKED

54

3800

205200

... More
Labour Charges for fitting, fixing and laying, where necessary of following M.S / G.I. / E.R.W. pipes and accessories (to be supplied departmentally) including transportation of the same cutting, threading, jointing and making leak-proof threaded / flanged joint at site, by using socket / rubber insertion, nuts and bolts etc. maintaining proper alignment and level - all complete - as per direction of Engineer-in-Charge.150 mm. dia. ERW pipe.

54

134

7281.36

... More
Meeting and onsite demonstration for operation & maintenance of one New Major RU , water manangement and mode of collection of water tax, building of corpus fund etc [Approved estimate regarding activities for institutional development for sustainability of project

2

3000

6000

... More
Lightning protection (Pole mounted): Lightning protection with 3" X 1.5" G.I pipe of 5m + 1 m height with base flange in proper RCC foundation and S & F Lightning Conductor Air Terminal made of 20 mm dia 1000 mm long GI pipe (ISI Medium) having five discharge prongs of 4 SWG GI (Hot Dip) wire at top duly soldered with 7/16 stranded GI (Hot Dip) wire and 85 mm dia 6 mm thick GI base plate at bottom incl. necessary holes etc. Earthing with 65 mm dia GI pipe (Medium) 3.0 Mts. long and 1 x 19/10 stranded GI (Hot Dip) wire (4 Mts. long), 20 mm dia x 125 mm long galvanized bolt, double nuts, double washers including socketing at both ends of stranded GI (Hot Dip) wire by crimping sockets/ thimbles and S & F 65 mm dia GI pipe (ISI-Medium) protection (3 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level to an average depth of 3.65 Mts. including connection to earth electrodes with 25 X 6mm G.I strip. (Provision of one lightning protection for each scheme as per drawing)

2

10683

21366

... More
Foundation Bolt, For Distrubution Chamber Quadruped (1.1 Kg each) manufactured from 20 mm nominal dia MS rod as per IS 2062/2002.Total length of the bolt is 375+_ 10mm having welded head 80+- 10 mm in length and 20 mm nominal dia with Nut & 2 Nos. Washer.

14

223

3122

... More
M-16 X 65 mm

38

176

6688

... More
Supply of 4' Hose Clamp

16

112

1792

... More
100 mmdia Flexible PVC Hose for Suction & Delivery line

30

774

23220

... More
Erection, fitting, fixing of set of M S tripod inlet and outlet pipe fittings for MIDI RLI Scheme with 1st. And 2nd chamber.(Rate inclusive of transportation from departmental store to work site)

1

12466

12466.74

... More
100X80mm M.S. flanged reducer (Flange having ISI Marked)

4

1633

6532

... More
110 mm. dia P.V.C. pipe Class- I (with a loose matching coupler,class-II) marking IS No. 4985/ 2000 with latest amendments with free solvent cement.

1200

186

223200

... More
Supply fitting and fixing of Hot dip Galvanised ( min 80 micron) / Powder Coat painted M.S Kiosk Box / Stainless Steel Kiosk of SS304 of 710(L) X 410(W) X 740(H) and total height with legs is 1670mm for mounting of motor-pump set including transportation, grouting in Cement Concrete.

2

14157

28314

... More
Laying of UPVC pipes of different diameters within field trenches in curve/ straight line including using UPVC fittings, Viz. Horizontal and Vertical Bends, riser pipes, Tee Reducer etc.and making leak proof joints with couplers after roghening the surface with wire brush and emery paper and applying solvent cement (The rate is inclusive of transport of pipes, fittigs and solvent cement to be supplied by deptt.) all complete asper direction of Engineer-In- charge. 140 mm.OD.

252

10

2555.28

... More
125 mm. thick brickwork with 1st class bricks in cement mortar (1 : 4) in ground floor.

10.35

722

7472.7

... More
Placing and positioning the Centrifugal pump motor set on the pump base / pump house floor, aligning properly with necessary packing and fixing the set with holding down nuts and washer including cutting holes of requisite size in the floor / base, grouting the bolts and mending good all damages complete as per direction of the Engineer-in-Charge. (ii) 3 H.P./5 H.P. Capacity

2

335

671.38

... More
Water User Assosiation registration

-

-

-

... More
110 mm. dia 900 bend(cl-II) ( IS. No. 10124/ 2009 Part- 8 with latest amendment ) with free solvent cement.

13

378

4914

... More
a) Lighting System at Scheme: (with lighting Pole) : Dusk to dawn lighting arrangement of at 4 mts height above ground level, with Hot dip galvanised 80 mm x 50 mm , medium duty pipe, with 12 V, 15Ah 2-in-1 Lithium ion/ Ferro- Phosphate battery with in-built 7-11watt LED lamp , 50 Wp solar panel to cover the scheme area. The lighting system should be warranted for 5years from the date of installation.

1

19030

19030

... More
Coupler(Cl-II) for 110 mm. dia P.V.C. pipe ( extra) I.S. 10124/2009, Part- II with free solvent cement.

50

67

3350

... More
Supply and installation of 3 phase electromotor pump-motor set suitable for Solar operation covering 5 years warranty for the following conditions including loading, unloading, transportation etc.:- c) 5 HP ISI marked 3 phase 415 V Pump-Motor set having discharge at required head as below:- i) Monoblock Surface Pump-motor set ISI marked as per IS: 9079 for mini RLI scheme with discharge of 13.8 Lps at 18 mts. total head with 100/80 mm dia. reinforced PVC suction pipe (20m) and delivery pipe(10mts), foot valve, nipple, priming bend Cable and all other required accessories to complete connection of suction and delivery side .

2

62406

124812

... More
Add GST @ 18 % on all item from 3.01 to 3.18

1

190430

190430.54

... More
100 mm dia C.I. Sluice Valve I.S.I. 14846/2000 Amd No. 1&2 mark and specification PN- 1.6 sluice valve .

2

6300

12600

... More
Supply and transport of materials to proposed site inclusive of all demand

-

-

-

... More
Earthing: Earthing with 50 mm dia GI pipe 3.64 mm thick x 3.04 Mts. long and 1 x 4 SWG GI (Hot Dip) wire (4 Mts. long), 13 mm dia x 80 mm long GI bolts, double nuts, double washers incl. S & F 15 mm dia GI pipe protection (1 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level driven to an average depth of 3.65 Mts. below the ground level as below: By ISI-Medium GI pipe including excavation of soil for installation of Earth Electrode and filling & ramming and connecting to individual structure to earth electrode including S&F 20 mm x 3 mm galvanised (Hot Dip) MS flat on wall/floor with GI saddles as required and connection to equipments incl. drilling holes, with bolts, nuts, washers etc.

4

2661

10644

... More
Documentation Cost for activities of WUA Scheme - by still photography, report booklet etc in both hard and soft copy.[Approved estimate regarding activities for institutional development for sustainability of project

1

1000

1000

... More
Add GST 18% in all item from Sl No. 2.01 to 2.26

1

54293

54293.94

... More
Impact study & monitoring of scheme by site visit of 2 Community workers during 3 years' period [Approved estimate regarding activities for institutional development for sustainability of project

8

1200

9600

... More
80X65mm M.S. flanged reducer (Flange having ISI Marked)

2

1381

2762

... More
Supply of 160 mm dia F.T.P. as per IS-10124/2009 and shall be duly marked with standard ISI certification marks & class Class-II (0.40 MPA)

2

670

1340

... More
110 mm. dia ( IS. No 10124/2009 Part- 6 with latest amendment) F.T.P.(Cl-II) with free solvent cement.

9

310

2790

... More
Neat cement punning about 1.5 mm. thick in wall, dado, window, sills, floor, drain etc. NOTE : Cement 0.152 cu.m. per 100 sq.m.

97.38

34

3310.92

... More
140 mm. dia P.V.C. pipe Class- I 140(with a loose matching coupler,class-II) marking IS No. 4985/ 2000 with latest amendments with free solvent cement.

252

293

73836

... More
Registration Cost for WUA under suitable act ( Society ) deed writing including registration charge, conveyance cost & opening of Bank A/C Charges etc [Approved estimate regarding activities for institutional development for sustainability of project

1

1200

1200

... More
Fitting and fixing of M.S. / G.I. / C.I.accessories and special in pipe line (accessories & special to be supplied departmentally) including supply of jointing materials viz.rubber insertion, nuts & bolts, havoc Zink (Zink Oxide) complete as per direction of Engineer-in-Charge. a) 150 mm dia sluice valve.

2

54

109.38

... More
Supply of 160 mm dia P.V.C exrtra coupler (cl-II)

6

218

1308

... More
Cable and Accessories : Supplying, fitting and fixings of UV rated Copper Cable laid inside HDPE conduit and other accessories as per followings with necessary connection with the Solar PV Module, MPPT etc. i. 4.0 Sq mm single core multi studs - 5m(for 2HP) & 20m(for 3/5 HP) for 2 or more Structure per Structure with 9 m distance between structures.

4

3434

13736

... More
Insurance @ 2% for Item No. 3.01, 3.05, 3.09 and 3.11 for a period of 5 years. Note:2 Ist year's Insurance charge is to be paid on production of Original Receipt of premium payment. Remaining 4 years Insurance payment is to be withheld which will be released during 2nd, 3rd , 4th & 5th year on production of Original Receipt of premium payment.

612796

-

12255.92

... More
Comprehensive maintenance charges for 4 years beyond 1 year warranty period (which cover monthly inspection, Yearly training to WUA, to attend breakdown within 3 days and to keep the scheme in operation without lapse of time) c) For 5 HP both for Submersible & Surface pump Note: Total comprehensive maintenance charge is to be withheld in addition to Securirty Deposit. Comprehensive maintenance charges will be released @ i) Rs 0.80 for 2 HP, ii) Rs.0.80 for 3 HP, iii) Rs.0.60 for 5 HP / 7.5/ 10 HP / 15HP / 17.5HP and 20 HP Submersible & Surface per Wp per year at the end of each maintenance period i.e.at the end of 1st year, 2nd year, 3rd year, 4th year& 5th year. In case the “Bidder” does not provide service during the warranty & comprehensive maintenance period, the amount so held up will be forfeited

11000

3

33000

... More
M-16 X 80 mm

10

176

1760

... More
140 mm. dia 900 bend (cl-II) ( IS. No. 10124/ 2009 Part- 8 with latest amendment ),with free solvent cement.

2

647

1294

... More
Solar Module: Supply , transport , installation and commissioning of ISI marked Solar Modules as per following specification: 1. Cell: Indigenous mono crystalline silicon SPV cells 2. Solar Module: Monocrystalline cell with PERC technology / module with bifacial cell. 3. Standards: ISI marked as per IS 14286 and having certification of IEC 61853(1), 61730(1&2), 61710 4.Modules must qualify to IS 170210 (Part 1) 5.Min. Efficiency: 19.5%. 6. Fill factor: More than 75% 7. Module wattage mismatch in the SPV array: within ±3% 8. Wattage output warranty:Should not be less than 90% at the end of 10 years and 80% at the end of 25 years. 9.The power output of individual PV modules used in the PV array, under STC: minimum 300 Wp. Necessary test certificates also to be supplied. For detail information please see Cl. no. 2.1 of technical specification . d)For 5 HP Off-grid / On-grid Solar Water Pumping System with Monocrystalline/ Monocrystalline PERC/bifacial SPV modules - 5400-5800 Wp.

11000

32

355190

... More
Testing and commissioning of scheme after completion of all work

2

2000

4000

... More
140 mm. dia ( IS. No 10124/2009 Part- 6 with latest amendment) F.T.P.(Cl-II) with free solvent cement.

2

462

924

... More
Supply of 160 X 140 mm P.V.C. Reducer (Class-II) as per IS-10124/2009 and shall be duly marked with standard ISI certification marks & class Class-II (0.40 MPA)

2

328

656

... More
Brick work in cement mortar (1 : 6) with first class kiln burnt bricks including racking out joints, scaffolding and other incidental works etc. complete in foundation and plinth. (a) In foundation & plinth

0.88

5292

4656.96

... More
100 mm dia NTP /Alfa-Alfa Valve as per technical specification

9

3300

29700

... More
Earthwork in excavation of field trenches as per designed section & alignment for laying of pipe lines(PVC,RCC,ACP etc.) upto a depth of 1500 mm in all sorts of soil including removing, spreading or stacking extra earth as directed.The item includes necessary trimming the sides of trenches, levelling,dressing and ramming the bottom as required complete.

796.93

99

78904.04

... More
Laying of Water Transmission Arrangement for Mini RLI Scheme

-

-

-

... More
Testing of pipe line system against leakages by filling the distribution chamber with water and supplying water through the entirepipe line net work for at least 4 (four) hour by running the departmental Deasel Engine pumping set, including supplying necessary fuels & lubricants and hiring and transporting tools and plants all complete as per direction of Engineer-in-Charge.

1

2494

2494.1

... More
Connecting the equipments to earth busbar including S & F GI (Hot Dip) wire of 8 swg on wall/floor with staples buried inside wall/floor as required and making connection to equipments with bolts, nuts, washers, cable lugs etc. as required and mending good damages.

80

13

1040

... More
For 8 module structure

2

13205

26410

... More
140 mm. dia IS. NO. 10124/ 2009 Part- 4 with latest amendment End cap (Cl-III) with free solvent cement.

1

330

330

... More
M-20 X 100 mm

8

176

1408

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups,binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape,placing in proper position and binding with 16 gauge black annealed wire at every inter-section, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor / upto 4m. (i) Tor steel/Mild steel(SAIL/TATA/RINL) i)For foundation Blocks of tripod

0.06

55768

3346.12

... More
Earthwork in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite and sand stone), including removing, spreading or stacking the spoils, within a lead of 75 m as directed.The item includes necessary trimming the sides of trenches, levelling,dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1500 mm.

10.87

119

1296.46

... More
Filling in foundation or plinth by fine sand in layers not exceeding 150 mm. as directed and consolidating same by thorough saturation with water ramming complete, including the cost of supply of sand. (Payment to be made on measurement of finished quantity)

5.1

951

4854.33

... More
Add Cess @1% on all from item no 3.01 to 3.19

1

12483

12483.78

... More
M-16 X 50 mm

16

176

2816

... More
110x110x 110 mm. P.V.C. Tee (Part-V) with free solvent cement,I.S. 10124/2009 (Cl-II)

9

347

3123

... More
Campaigning in the command area of New Mini RLI Sub-project by community workers for mass awareness , capacity building to achieve sustainability of Sub-projects. Cost include wage payment to community workers, transportaton, leaflet etc.[Approved estimate regarding activities for institutional development for sustainability of project

2

2600

5200

... More
140x140x 140 mm. P.V.C. Tee (Part-V) with free solvent cement,I.S. 10124/2009 (Cl-II)

3

712

2136

... More
110 mm. OD.

1200

8

10464

... More
M.S Foundation Bolt for Pump Motor sets manufactured from 20 mm nominal diameter M.S Rod as per IS 2026/1992. Total length of bolts is 275+10 mm in length & 20 mm in nomonal diameter with Nuts & 2 nos washer,the average weight of such bolt 1.1 kg per bolt with tolerance in weight of each bolt @ +/-10%

8

223

1784

... More
G.I. Tripod set and Inlet & outlet Pipe Fittings(I No. for 2nd chamber of Drawing) as per drawing and Specification

1

202000

202000

... More
100 mm dia. NB ERW/MS Pipes

24

82

1980.24

... More
Sal sleeper (4ft x 6 in x4 in)

2

2200

4400

... More
IEC Materials ( Leaflet, poster, notebook )= 8 meetings, for SL - 2 and SL-4 [Approved estimate regarding activities for institutional development for sustainability of project

55

35

1925



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.