Water Resources Development Directorate Tender

... More
The WRDD has issued a formal invitation for competitive bids for the Water Resources Development Directorate project, for Installation Of 2 Nos Clustered, 12 Nos Light Duty Tubewell (solar) (5hp) Scheme At Purba Baroghoria, Saptibari Mouza In Maynaguri Block Under Jalpaiguri (a-i) Division Under Core Sector Programme in Jalpaiguri, West Bengal, with an estimated contract value of Rs. 1,02,66,610. The bid opening date for this tender is 15-10-2026 and the last date for bid submission is 17-11-2026. Interested bidders for Water Resources Development Directorate tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Water Resources Development Directorate - WRDD Tender - WB Tender

Opening Date15 Oct 2026
Closing Soon17 Nov 2026
Tender Amount₹ 1,02,66,610 
Notes
Download

Costs

Summary

Installation Of 2 Nos Clustered, 12 Nos Light Duty Tubewell (solar) (5hp) Scheme At Purba Baroghoria, Saptibari Mouza In Maynaguri Block Under Jalpaiguri (a-i) Division Under Core Sector Programme

Description

Installation Of 2 Nos Clustered, 12 Nos Light Duty Tubewell (solar) (5hp) Scheme At Purba Baroghoria, Saptibari Mouza In Maynaguri Block Of Jalpaiguri District Under Jalpaiguri (a-i) Division Under Core Sector 2026-27 Programme.

Contact

Unlock the Tender details

GEM & Bid Advisory Services

Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

Unlock the Tender details
... More
100 mm nominal dia 5 mm thick uPVC Blue ribbed screen / strainer (Filter MEDIUM) made as per IS 12818 / 2010 UPVC BLUE RIBBED SCREEN PIPES (FILTERS) MADE AS PER IS: 12818 / 2010 (NOMONAL DIA 100 MM, WALL THICKNESS 5 MM, RMS- RIBBED MEDIUM SCREEN UPTO 250 METRE DEPTH) (i) 100 mm dia.

144

911

131184

... More
75 mm dia LAY FLAT HOSE (Non-ISI) (i) 75 mm dia.

1200

140

168000

... More
Galv. MS column pipe , ISI marked- 1239, Galv-IS 4736 80 mm dia screwed at one end & std flanged at other 3 m long (top)

12

6185

74220

... More
Galv. MS column pipe , ISI marked- 1239, Galv-IS 4736 80 mm dia both end screwed & one end socketted 3 m long (bottom)

96

5400

518400

... More
90 degree GI bend ( both end flanged ) -ISI marked - IS 1239, Galv- IS 4736 e) 80 mm dia

12

3150

37800

... More
Holding clamp - IS 1239, Galv- IS 4736 c) 80 mm dia

12

2076

24912

... More
3 C Flat water proof Copper cables ISI marked-IS 694 b) 3C X 2.5 sq. mm

420

189

79380

... More
E.R.W.Casing & Blank Pipe lSI marked-IS 4270 200 mm N.B.(6.4mm) 33.1 Kg / m

12

3615

43380

... More
PART-2 DRILLING AND DEVELOPMENT OF LDTW (SOLAR), WRIDD/PWD SCHEDULE

-

-

-

... More
a) Drilling of bore hole of suitable diameter upto required depth by water jet system through any type of soil ncluding hire and labour charges for boring pipes, scaffolding, other tools and plants etc. and taking out the same all complete and other incidental works in this connection. The bore hole should have minimum 65 mm gap in between outside of the tube well pipe and the bore.(b) For Siliguri Sub-Division/ Alipurduar Sub-Division/ Malbazar Sub-Division/ Jalpaiguri Sub-Division the above rate shall be enhanced by 20%. ii) for lowering 100 mm dia GI / PVC pipe 0 to 66 m

360

314

113245.2

... More
ii) for lowering 150 mm dia GI / PVC pipe

432

678

293293.44

... More
Labour charges for lowering of pipe, strainers, blank pipes etc. and fitting, fixing the same including cutting, threading where neccessary complete including bucket washing and other incidental works in this connection. (i) 150 mm dia GI / PVC Housing pipe.

432

102

44301.6

... More
Labour charges for lowering of pipe, strainers, blank pipes etc. and fitting, fixing the same including cutting, threading where neccessary complete including bucket washing and other incidental works in this connection. (ii) 100 mm dia GI / PVC Blank pipe, Bottom Plug with cutter, Brass Jacketted / stainless steel strainer.

360

70

25462.8

... More
(a) Supplying and filling up of the annular space between the Well Pipe and the bore hole by coarse sand of fineness modulus not less than 2 including watering as necessary as per direction of the Engineer-in-Charge.

35.08

848

29770.99

... More
Supplying, fitting and fixing including supplying of suitable jointing compound for fixing in position, threading, if necessary etc. all complete. (a) 100 mm. dia. CI cutter piece upto 450 mm. long with socket.

12

330

3960.36

... More
(b)P.V.C Flexible Hose Pipe, ISI Marked IS:15265, 100mm dia Suction Hose

12

774

9288

... More
g) 250 x 50 x 6 mm thick, 80 / 100 mm dia, M S Supporting clamp with 2 nos 12 mm dia 65 mm long bolts, nuts,washer, on each side.

12

990

11881.2

... More
h) 80/100 mm dia plug of approved make conforming to IS specification .

12

146

1753.92

... More
Cement Concrete (1:2:4) Base Block of (600 x 600 x 300 mm) for fixing base of Tubewell

12

754

9052.32

... More
Washing and development by pumping with 30 cum per hour capacity pump for a period till sand free water comes out and the discharge is about 30 cum per hour, followed by final yield test; inclusive of all tools, plants and scaffolding and hire charge of submersible pump, generator etc. all complete.

12

1574

18896.76

... More
Labour charges for testing of 5 H.P. Pump set at site for at least 1 (one) hour including supplying necessary fuels and lubricants.

12

556

6676.08

... More
Charges for Mobilisation of drilling equipments, tools & plants etc and transportation of of departmental materials from any sub divisional store to work site and returning excess departmental materials if any, to the same sub divisional store after completion of work.

12

876

10523.28

... More
Supplying, fitting and fixing G.I. cap at top 100 mm dia

12

139

1668

... More
PART-3 INSTALLATION OF SOLAR SYSTEM 5HP SOLAR MONOPERC Pumping System with 5HP Submersible Pump:, WRIDD/PWD SCHEDULE

-

-

-

... More
SOLAR ITEM NO- 1 Solar Module: Supply , transport , installation and commissioning of ISI marked Solar Modules as per following specification: 1. Cell: Indigenous mono crystalline silicon SPV cells 2. Solar Module: Monocrystalline cell with PERC technology / module with bifacial cell. 3. Standards: ISI marked as per IS 14286 and having certification of IEC 61853(1), 61730(1&2), 61710 4.Modules must qualify to IS 170210 (Part 1) 5.Min. Efficiency: 19.5%. 6. Fill factor: More than 75% . 7. Module wattage mismatch in the SPV array: within ±3% 8. Wattage output warranty:Should not be less than 90% at the end of 10 years and 80% at the end of 25 years.9.The power output of individual PV modules used in the PV array, under STC: minimum 300 Wp. Necessary test certificates also to be supplied. For detail information please see Cl. no. 2.1 of technical specification . d)For 5 HP Off-grid / On-grid Solar Water Pumping System with Monocrystalline/ Monocrystalline PERC/bifacial SPV modules - 5400-5800 Wp.

66000

32

2131140

... More
SOLAR ITEM NO- 2Module Mounting Structure ( For1 HP, 2HP, 3HP, 5HP and 10 HP Solar Water Pumping System): Supply , transportation & installation of G.I manual tracking / Fixed structure made of MS hollow sections, pipes, plates, angles etc as per IS:4923, IS:1161/1239, IS:1079/2062, to hold min 300 Wp SPV Module as per drawing and technical specification. The steel structure is to be protected with minimum 80 micron galvanisation(hot dip) and provided with fixed arrangement or dual axis manual tracking arrangement for three times in a day and seasonal tilting to face the sun optimally. The approximate weight of the Module Mounting Structure given in Technical Specification Clause no.5.1 should be followed. 1 no 4 Module MS & 1 no 6 Module MS1 no 4 Module MS 1 no 6 Module MS

6840

157

1073880

... More
SOLAR ITEM NO- 3Power conditioning unit with enclosure :Supply , transport , installation and commissioning of Solar Power conditioning Unit consisting of following components and features: 1) Variable frequency Drive with inbuilt MPPT, voltage range suitable for operating pump-motor set of 1HP to 20 HP, detail mentioned in Cl.6.12) Power input : DC source for 1HP, 2HP and 3HP.3) Power input : AC / DC source or hybrid for 5HP and above.4) Incomer: DC MCB 2 Pole 16 amp upto 5 HP, 25 amp for 7.5HP and 10 HP, 40 amp for 15 to 20 HP as per IS/IEC 60947-25) Incomer: AC MCB 4 pole 16 amp for 5.0 HP, 25 amp for 7.5HP and 10 HP, 40 amp for 15 to 20 HP as per IS/IEC 60947-26) Type II DC SPD of 40 KA.7) Type II AC SPD of 40 KA for AC/ DC or Hybrid input.8) Dual input (solar/Grid) 25 amp changeover switch for 5HP and 7.5 HP, 40 amp for 10 HP, 63 amp for 15 to 20 HP9) Reverse protection diode 1600 VDC with heat sink.10) Data Logger.11) Remote monitoring system.12) Should have built –in EMC filters .13)IP 65 glands for cable in and out.14) Min. IP 54 enclosure.For detail features, protections, RMS, Communication architecture, Security, Data storage, tolerance of various parameters, standards to be qualified, etc. please refer to Cl. 6.1 of technical qualification. Note: AC SPD, AC MCB and Selector switch to be provided only for item no. 3(f) to 3(l). d) For 5 HP capacity Pump-motor set with DC input

12

56882

682584

... More
SOLAR ITEM NO- 4 Cable and Accessories :Supplying, fitting and fixings of UV rated Copper Cable laid inside HDPE conduit and other accessories as per followings with necessary connection with the Solar PV Module, MPPT etc.i. 4.0 Sq mm single core multi studs - 5m(for 1HP/2HP/3HP) & 20m(for 5/7.5/10/15/17.5/20 HP)ii. Lugs, HDPE Pipe, Flexible Pipe, Saddle, Cable tie etc b) For 5 HP per structure

12

3434

41208

... More
SOLAR ITEM NO- 5 Earthing: Earthing with 50 mm dia GI pipe 3.64 mm thick x 3.04 Mts. long and 1 x 4 SWG GI (Hot Dip) wire (4 Mts. long), 13 mm dia x 80 mm long GI bolts, double nuts, double washers incl. S & F 15 mm dia GI pipe protection (1 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level driven to an average depth of 3.65 Mts. below the ground level as below: By ISI-Medium GI pipe including excavation of soil for installation of Earth Electrode and filling & ramming and connecting to individual structure to earth electrode including S&F 20 mm x 3 mm galvanised (Hot Dip) MS flat on wall/floor with GI saddles as required and connection to equipments incl. drilling holes, with bolts, nuts, washers etc.

12

2661

31932

... More
SOLAR ITEM NO- 6 a) Lighting System at Scheme: (with lighting Pole) : Dusk to dawn lighting arrangement of at 4 mts height above ground level, with Hot dip galvanised 80 mm x 50 mm , medium duty pipe, with 12 V, 15Ah 2-in-1 Lithium ion/ Ferro- Phosphate battery with in-built 7-11watt LED lamp , 50 Wp solar panel (min 19% Eff.) to cover the scheme area. The lighting system should be warranted for 5years from the date of installation.

12

19030

228360

... More
SOLAR ITEM NO- 7 a) Lightning protection (Pole mounted): Lightning protection with 1.5" G.I pipe of 4 mts + 0.75 mts height with base flange in proper RCC foundation and S & F Lightning Conductor Air Terminal made of 20 mm dia 1000 mm long GI pipe (ISI Medium) having five discharge prongs of 4 SWG GI (Hot Dip) wire at top duly soldered with 7/16 stranded GI (Hot Dip) wire and 85 mm dia 6 mm thick GI base plate at bottom incl. necessary holes etc. Earthing with 65 mm dia GI pipe (Medium) 3.0 Mts. long and 1 x 19/10 stranded GI (Hot Dip) wire (4 Mts. long), 20 mm dia x 125 mm long galvanized bolt, double nuts, double washers including socketing at both ends of stranded GI (Hot Dip) wire by crimping sockets/ thimbles and S & F 65 mm dia GI pipe (ISI-Medium) protection (3 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level to an average depth of 3.65 Mts. (Provision of one lightning protection for each structure)

12

6725

80700

... More
SOLAR ITEM NO- 8 Supply and installation of 3 phase AC electromotor pump-motor set with speed of 3000 r.p.m(synchronous speed) suitable for Solar applications and shall have 60 months guarantee for the following conditions including loading, unloading, transportation etc.:- (Refer technical specification for more detail) d) 5 HP 3 phase AC Pump-Motor set having discharge at required head as below:- iii) Submersible Pump-motor set for LDTW with external part made of stainless steel of grade 304 or higher as per IS 6911 and IS 3444,with discharge of 7.5 Lps- 5.83 Lps at 30 mts.-35 mts. total head with cable(3m), cover plate, Socket, Flanged Nipple, Rubber Insertion, Nuts& bolts and all other accessories including transportation of Bend, Column Pipes, cable, sluice valve, lay flat hose pipe etc. from Deptt. Store to site within 100km. The pump motor should be tested as per IS 8034:2048(third revision)

12

46339

556068

... More
SOLAR ITEM NO- 9 Testing and commissioning of scheme after completion of all work

12

2000

24000

... More
SOLAR ITEM NO- 10 Cleaning and washing of modules once in month with clear water to remove deposited dust and dirt on the module surface and keep the modules clean throughout the year. The activity to be performed for eight months in a year excluding four monsoon months. A log book should be maintained at the site for the said purpose. Note:1 Total Cleaning & washing charge is to be withheld in addition to Securirty Deposit . Cleaning & washing charges will be released alongwith comprehensive maintenance charge for each year at a time for 8 months for the completed year i.e.at the end of 1st year, 2nd year, 3rd year, 4th year, 5th year. In case the “Bidder” does not provide service during the warranty & comprehensive maintenance period, the amount so held up will be forfeited.

960

300

288000

... More
SOLAR ITEM NO- 11 Connecting the equipments to earth busbar including S & F GI (Hot Dip) wire of 8 swg on wall/floor with staples buried inside wall/floor as required and making connection to equipments with bolts, nuts, washers, cable lugs etc. as required and mending good damages

240

13

3120

... More
SOLAR ITEM NO- 12 Comprehensive maintenance charges for 5 years (which cover monthly inspection, Yearly training to WUA, to attend breakdown within 3 days and to keep the scheme in operation without lapse of time) c) For 5 HP both for Submersible & Surface pumpNote:1Total comprehensive maintenance charge is to be withheld in addition to Securirty Deposit . Comprehensive maintenance charges will be released @ i) Rs 0.80 for 2 HP, ii) Rs.0.80 for 3 HP, iii) Rs.0.60 for 5 HP & 10 HP Submersible & Surface per Wp per year at the end of each maintenance period i.e.at the end of 1st year, 2nd year, 3rd year, 4th year, 5th year. In case the “Bidder” does not provide service during the warranty & comprehensive maintenance period, the amount so held up will be forfeited

66000

3

198000

... More
SOLAR ITEM NO- 13 Insurance @ 2% for Solar Item No. 1, 3, 6, and 8 for a period of 5 years. Note:2 Ist year's Insurance charge is to be paid on production of Original Receipt of premium payment. Remaining 4 years Insurance payment is to be withheld which will be released during 2nd, 3rd , 4th & 5th year on production of Original Receipt of premium payment.

12

5996

71963.04

... More
Note: (i) Extra rate for diffecult/Reverine Areas connected by river route and/or ferry crossing as applicable as per current PWD Schedule of Rates (Building Works) for item no. 2 & 3. (ii) Extra rate for transportation @ 2% for item no. 1 & 2 as applicable for the district of Malda, Uttar Dinajpur, Dakshin Dinajpur , Jalpaiguri, Cooch Behar and Alipurduar.

12

5341

64100.4

... More
Supplying, fitting and fixing including transportation of sign board for identifying the exact location of MINI RLI scheme (one at road side and other at site) the board will be made 3 mm thick MS plate of size 300 mm x 600 mm and fitted and fixed on 50 mm GI Pipe of IS 1239/90 (part-1) including cutting, welding LS and writting of both sides of Sign board. Base - Yellow, and words - Red. Both bottom end of the stands pipe will be grouted in 1:2:4 CC on a single brick flat soling. This will include one materials and labour complete as per drawing and direction of E.I.C.

24

3677

88260.24

... More
b) Supply fitting and fixing of Hot dip Galvanised ( min 80 micron) / Powder Coat painted / Galvanised M.S Kiosk Box of 800(L) X 500(W) X 650(H) and total height with legs is 950mm (above ground) including foundation(as per drawing) for mounting of motor-pump set including transportation, - For 5 HP surface pump.

12

14157

169884

... More
Remote monitoring for 5 years: Provision for remote monitoring for the pumps must be made in the pump controller through an integral arrangement having following basic functions: a. Controller must be assigned with a unique serial number and its live status must be observed remotely on online portal through login credentials. b. Live status must indicate whether controller is ON/ OFF. The parameters i.e. the water output, water flow rate, in fault condition, array input voltage/ current, power and motor frequency should at logged at an interval of 10 minutes c. Controller must have a back up to store the data locally ( at least for 1 year) supply & installation of GSM/GPRS based Data Transmitter or Modem and to provide remote monitoring service to transmit the parameters to central server from the solar pumping system with time stamp at user-defined interval and report generation at the buyer end. (Refer Technical Spec.)

12

21850

262200

... More
PART-4 INSTALLATION OF SOLAR SYSTEM 5HP SOLAR MONOPERC Pumping System with 5HP Submersible Pump:, CPWD SCHEDULE

-

-

-

... More
Foundation of Module Mounting Structure: Suitable and stable Reinforced Cement Concrete foundation for dual axis manual tracking SPV Module structure as per approved drawing.1 no 6 Module MS

12

21931

263174.64

... More
Foundation of Module Mounting Structure: Suitable and stable Reinforced Cement Concrete foundation for dual axis manual tracking SPV Module structure as per approved drawing.1 no 4 Module MS

12

25862

310346.16

... More
PART-5 Institutional development & Capacity building of Water Users Association:

-

-

-

... More
Campaining in the command area of clustered STW Sub-projects by community workers for mass awareness, capacity building to achieve sustainability of sub-projects. Cost include wage payment to community workers, transportation, leaflet etc.

4

2600

10400

... More
Demarcation of command area, selection of beneficiaries and preparation of land schedule within one cluster having CCA 36 Ha.

2

5000

10000

... More
Meeting Cost for WUA formation, cost including Refreshment, training materials, transport local conveyance, wage payment to community worker, remuneration to resource person and incidental charges

2

3000

6000

... More
Registration Cost for WUA under suitable act ( Society ) deed writing including registration charge, conveyance cost and opening of bank account etc.

2

1200

2400

... More
Livelyhood plan / Micro plan formulation cost for minor irrigation scheme, cost including refreshment, training materials, transport local conveyance, wage payment to community worker, remuneration to resource person and incidental charge ( rate on meeting )

8

3000

24000

... More
Meeting and onsite demonstration for operation & maintenance of tubewells, water management and mode of collection of water tax, building of corpus fund etc.

4

3000

12000

... More
IEC Materials ( Leaflet, poster, notebook )= 8 meetings, for SL - 2 and SL - 4

200

35

7000

... More
Documentation Cost for activities of WUA Scheme - by still photography, report booklet etc in both hard and soft copy.

2

1500

3000

... More
Impact study & monitoring of scheme by site visit of 2 Community workers during 3 years' period

18

1200

21600

... More
Add GST @ 18 % on PART-2, PART-3 AND PART-5 (EXCEPT PROCUREMENT OF MATERIALS)

1

1200883

1200883.25

... More
Add Labour Welfare Cess @ 1% on PART-2, PART-3 AND PART-5 (EXCEPT PROCUREMENT OF MATERIALS)

1

78724

78724.57



Evaluation Notes How It Works ?

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.