Visva Bharati Santiniketan Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Visva Bharati Santiniketan Tender
Agriculture or Forestry Works
Eprocure
Opening Date3 Jan 2025
Closing Date29 Jan 2025
Tender Amount₹ 13,86,951
Costs
EMD
₹ 30,000Document Cost
₹ 2,000Tender Fee
Refer Documents
Summary
Tender For Major Improvement Of Bhubandanga Bundh
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_VB_842687_1Tender No
Estate/224/428/24-25Tender Authority
Visva Bharati Santiniketan ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Dismantling of masonary works excluding concrete
4.05
447
1810.35
... More
Dismantling of of all types of plain cement concrete
1.89
939
1774.71
... More
Dismantling of all types of Reinforced Cement Concrete
1.36
1956
2667.98
... More
Brick work with 1st class bricks in cement mortar (1:6) in foundation
12.74
4198
53479.09
... More
Cement Concrete ( 4:2:1 )/ with approved 20 mm down graded stone chips cxcluding shuttering & reinforcement ( If any ) up to heigh 3.5 metre with Chandil stone chips.
7.54
4590
34615.31
... More
Hire and labour charges for shuttering for building works, foundation concrete, side shuttering of concrete beams, slabs etc. where no vertical props are required, fitting &
19.13
328
6273
... More
M.S. reinforcement ( for reinforcement concrete works ) including distribution bars strrups, binders etc. including supp-ly of rods, initially straightening and removal of loose
888.54
60
53694.47
... More
Plaster ( to wall, flooring, pathways etc.) with cement sand morter including rounding off chamfering corners as directed & taking out joints or roughening of coccrete surface, 20 mm th. Plaster.
71.36
175
12497.46
... More
Neat cement punning about 1.5 mm thick in wall dado, windows sills, floor, drain etc..
18.36
32
601.38
... More
Outlet, dewatering work etc
-
-
-
... More
M.S or W.I. Ornametal grill of approved design joits continiously welded wih M.S. W.I flats and bars of windows. Railling etc fitted and fixed with necessary screws and lugs in ground floor.
120
98
11865.6
... More
Pumping out water from ponds ( payment to be made on quality of water calculated on, no consideration being made for any water that may have been added through perculation or other wise.)
500
10
5220
... More
Cleaning and uprooting of weeds bushes in the bank,pond by cutting , removing as per direction-in-charge.
17040
11
187440
... More
SL NO 1.26 as per USoR 2018. IWR- Cleaning and removal of debris( including floating debris) including sludge & slush mixed with all sorts of industrial waste , solid / semi-solid compact mass formed due to water hyacinth in combination with industrial wastes, carcases, municipal garbage sludge, polypacks, thick and thornly jungles and long grass etc and depositing , spreading the same on the canal bank and later burnt to ashes when dry including all leads and lifts complete
24733
30
741990
... More
SL NO 1.27as per USoR 2018. IWR- Cleaning and removing, solid / semi-solid compact mass formed due to water hyacinth in combination with industrial wastes, carcases, municipal garbage sludge, thick and thornly jungles and long grass etc and deposal of lifed water hyacinth / semi-liquid compact mass by truck or by any other conveyance over kuncha/ pucca road including making access for plying the truck or any other conveyance beyong 240m from the lifting point including cost of loading , unloading, transporting , arrangement of land, if required by the agency all complete including all leads and lifts. Mode of measurements; Payment willbe made on the basis on the stack measurement after deducting voids @40.
2682
100
268200
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%