Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
The Durgapur Projects Limited - DPL Tender
Civil Works Others
Machinery and Tools
Eprocure
Opening Date4 Dec 2019
Closing Date18 Dec 2019
Tender AmountRefer Documents
Costs
EMD
₹ 60,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_DPL_257507_1Bid Award Id
ViewTender No
40/DGM(C)/PS/DPPS/DPL OF 2019-20Tender Authority
The Durgapur Projects Limited ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Galvanised corrugated iron sheet work at 72 mtr. height (excluding the supporting frame work) fitted and fixed with 10 mm. dia J or L hook-bolts, limpet and bitumen washers and putty complete with 150 mm. end lap and one corrugation minimum side lap. (Payment to be made on area of finished work)(GCI sheet to be supplied by contractor)
(i) In Roof:- (With 0.80 mm thick sheet)
.
1800
-
-
(ii) In wall :- With 0.80 mm thick sheet)
893
-
-
Galvanised plain sheet works at 72 mtr. height (excluding supporting framework) fitted and fixed with 6 mm. dia J or L hook-bolts and nuts, sheet-bolts, limpet and bitumen washers and putty with 150 mm. end lap & 50 mm minimum side lap complete. In roof with 0.63 mm thick sheet
138
-
-
Galvanised iron sheets valley gutter with perimeter not less than 750 mm with 225 mm lap each way fitted and fixed with necessary bolts, nuts, screws, etc.complete. at top of pent house (72 mtr. height) Valley gutter made of 0.63 mm. thick sheets. (300mm End lapping)
90
-
-
Galvanised iron sheet ridging fitted with necessary bolts,
screws, washers etc complete at 72 mtr. height.(225mm end lapping)
a) 300 mm lapping each with 0.80 mm sheet
45
-
-
Taking out wind-tie from roof of pent house (72 mtr. height) including cutting out rusted bolts, nuts etc. and removing materials to any distance within the compound and stacking.
1130
-
-
Galvanised or painted wind-tie made of M.S. flats, fitted and fixed complete at roof of pent house(72 mtr. height) including cost of necessary fittings.
Made with 50 mm. X 6 mm. flats
1490
-
-
Making one set of scaffolding only for replacing glass panels, painting, uprooting plant and another repairing works of building and S&P works for external works only at 72 m height with 10 cm. dia bamboo as main posts at the rate of 1 metre centre to centre and 7.5 cm. dia bamboo ties @ 0.75 metre apart fitting and fixing with necessary coir, nails etc. as per direction of the Engineer-incharge.
(This item should be executed only after prior approval of the Engineer-incharge). Firstly, one number to be paid and then labour rate for shifting up to further nineteenth (19) times @ 10% each time to be considered. If necessary further after twenty times of total use, another one number new and labour rate for shifting to be considered accordingly.