Sriniketan Santiniketan Development Authority Tender
... More
The SSDA has issued a formal invitation for competitive bids for the Sriniketan Santiniketan Development Authority project, for Construction Of Mastic Asphalt And Repairing Of Road With Drain Over Old Pcc Road At Ward No-02 Under Bolpur Municipality. Ps- Bolpur, Dist- Birbhum in Birbhum, West Bengal, with an estimated contract value of Rs. 43,68,830. The bid opening date for this tender is 12-02-2025 and the last date for bid submission is 07-03-2025. Interested bidders for Sriniketan Santiniketan Development Authority tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Sriniketan Santiniketan Development Authority - SSDA Tender
Civil And Construction
Road Construction
Eprocure
Opening Date12 Feb 2025
Closing Date7 Mar 2025
Tender Amount₹ 43,68,830
Costs
EMD
₹ 87,377Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_SSDA_815111_1Bid Award Id
ViewTender No
NIT-12 OF 2024-2025Tender Authority
Sriniketan Santiniketan Development Authority ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Add GST 18 %
1
659833
659833.3
... More
Supplying and laying Polythene Sheet (150gm / sq.m.) overdamp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
723.88
24
17373.12
... More
Mastic Asphalt:-Providing and laying Mastic asphalt wearing course with paving grade bitumen meeting the requirements given in table 500-29 using approved coarse aggregate, fine aggregate, filler material and bitumen, prepared by using Mastic cooker including cost and carriage of all ingredients, cost of heating aggregates and binder, mixing in specified proportions conforming to approved Job Mix Formula and laid to required level and slope after cleaning the surface, compacting, sealing the construction joints and surface finishing conforming to specifications including providing antiskid surface with bitumen pre-coated fine-grained hard stone chipping of 13.2 mm nominal size at the rate of 0.005 cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed into surface when the temperature of surfaces not less than 100°C, protruding 1 mm to 4 mm over mastic surface, including the hire charges of all tools and plants and machinery, pay of operators, cost of fuel and lubricants and all other incidental charges and quality control all complete as per Clause 516 of Specifications for Road & Bridge Works of MoRT&H(5th Revision). 25 mm Thickness
2345
505
1184576.75
... More
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm. upto 3 m depth (iv)Without pumping out water and shoring
28
114
3192
... More
Supplying, fitting and placing HYSD bar reinforcement in Bridge Super-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications.
0.45
55758
25091.11
... More
Sand filling in foundation or plinth by silver sand in layers not exceeding 15cm as directed and consolidating same by thorough saturation with water and ramming complete including the cost of supply of sand. (Payment to be made on measurement of finished quantity).
72
621
44765.28
... More
Plain / Reinforced Cement Concrete in Substructure with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality, cement and water reducing admixtures, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete as per drawing and technical specification including the cost of necessary form work and staging complete as per drawing and technical specifications. B RCC Grade M20
I. Using Concrete Mixer (i) For solid slab super-structure,a) Height upto 5m
364.95
5666
2067949.03
... More
SSDA
-
-
-
... More
Plain / Reinforced Cement Concrete in Substructure with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality, cement and water reducing admixtures, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete as per drawing and technical specification including the cost of necessary form work and staging complete as per drawing and technical specifications. B RCC Grade M20
I. Using Concrete Mixer (i) For solid slab super-structure,a) Height upto 5m
49.58
5666
280939.62
... More
Supplying and laying Polythene Sheet (150gm / sq.m.) overdamp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
18
24
432
... More
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm. upto 3 m depth (iv)Without pumping out water and shoring
144
114
16416