Public Works Department Tender

... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Public Works Department - PWD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date7 May 2025
Closing Date14 May 2025
Tender Amount₹ 2,10,904 
Notes
Download

Costs

Summary

Balance Work For The Work Bhagwanpur-paschimbar Road At 1.15 Km And 2.50 Km, Bhabanipur-thekuabazar Road At 1.50 Km, 4.20 Km, 5.00 Km And 6.70 Km, Narghat - Gopinathpur Road Via Chowkhali Bazar At 7.75 Km, Minor Repair Of Bridges And Culverts Under

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing anti-corrosive protective coating to inhibit the corrosion to HYSD reinforcements including two coats of anti-corrosive coatings of consumption as per manufacturer's specification, cleaning etc. complete as per the direction of the Engineer-in- Charge.

17.23

506

8718.380000000001

... More
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.(a) Where staging is required.

30.72

354

10874.88

... More
Providing and laying Design Mix concrete for plain / reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works. (c) M-25 Grade: Using concrete mixer

1.67

5603

9357.6947

... More
Supplying, fitting and placing HYSD bar reinforcement in Bridge Super-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications and direction of Engineering-in-Charge. The rate provided is exclusive of cost of steel materials. Construction wing should add cost & carraige of 1.05 MT(Considering 5% wastage) of steel materials to arrive at the consolidated item rate.

0.187

50887

9515.95502

... More
Brick work with 1st class bricks in cement mortar (1:4) In superstructure, ground floor

1.55

5621

8712.8135

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (ii) With 1:4 cement mortar. (a) 20 mm thick plaster

179.91

174

31320.5319

... More
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. Using Cement 0.152 cu.m per100 sq.m.

16.13

32

528.2574999999999

... More
Painting the vertical end faces of posts, wheel guards or railing or parapet with alternate bands of different colours as directed by the Engineer-in-charge with approved synthetic enamel paint. b) Two Coats

206.38

99

20431.62

... More
Drum Sheet Walling 1.40m (av.) high on Sal-bullah / Eucalyptus bullah piling 10 cm dia. and 3.25m long driven 1.75m (av.) below G.L. and 75cm centre to centre including fitting fixing 3 nos. of half bullah pieces (from 10 cm dia) and drum(empty bitumen) sheet (approved condition) of height 1.5m , cutting and straightening drum sheet (each joint must have lap length of min.50mm) including cost of necessary nails, bolts, nuts etc. and providing 2 to 3m long half bullah ties of 10cm dia. @ 2.25 m centre to centre fixed with 10 cm dia. bullah posts driven 1.5m below G.L. including cost of all materials and one coat of coal tarring to all bullah etc. complete as per direction. (i) Using Eucalyptus bullah

12

1244

14928

... More
Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete including cost of sand and gunny bags.

260

18

4680

... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceding 150 mm. including watering and ramming etc. layer by layer complete.(Payment to be made on the basis of measurment of finished quantity of work) (a) With earth obtained from excavation of foundation.

36

77

2791.44

... More
Add GST @ 18% on total amount over item No. 1 to 14 (i.e. Rs. 176963.36)

176963.36

18

3185340.4799999995

... More
Add Labour Welfare Cess @ 1% on total amount over Item No. 1 to 15(i.e. Rs.208816.76)

208816.76

1

208816.76



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.