Public Health Engineering Department Tender
... More
The PHED has issued a formal invitation for competitive bids for the Public Health Engineering Department project, for Construction Of Arsenic-cum-iron Removal Plant (airp) Of 174 Cum/hour Capacity For Augmentation Of Ground Based Water Supply Scheme At Baruipara To Accommodate Fhtc Within Karimpur-i Block Under Tehatta Sub-division Under Nadia Division, P.h.e. Dte. in Nadia, West Bengal. The bid opening date for this tender is 31-01-2024 and the last date for bid submission is 28-02-2024. Interested bidders for Public Health Engineering Department tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.
Public Health Engineering Department - PHED Tender
Opening Date31 Jan 2024
Closing Date28 Feb 2024
Tender AmountRefer Documents
Costs
EMD
₹ 7,70,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PHED_657704_8Bid Award Id
ViewTender No
WBPHED/SE/EC/NIEQ-75/2023-24Tender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://https://wbphed.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
NOTICE INVITING ELECTRONIC QUOTATION No. 75/SEEC OF 2023 -2024
BOQ Items
... More
Operation and Maintenance @5% per annum excluding cost of electricity but including the cost of all manpower, disinfectant and day to day maintenance [For 03 (three) years]
3
-
-
... More
Labour Welfare Cess @1% on all the above items.
1
-
-
... More
Construction of Arsenic-cum-Iron Removal Plant (AIRP) to reduce Arsenic concentration to 10 ppb (0.01 mg/l) and Iron to 100 ppb (0.1 mg/l) from influent concentration upto 500 ppb (0.5 mg/l) and 3000 ppb (3 mg/1) respectively (single / multi-stage) based on oxidation followed by chemical co-precipitation, filtration etc. and departmental process/hydraulic design consisting of inlet arrangement, oxidation chamber (30 minute detention time), flash mixer, flocculation and sedimentation unit, filtration unit with Back washing arrangement (including the cost of 2 years polishing media where applicable) with air and water, back wash water tank of suitable capacity, and staging height, air compressors, blower etc, with or without activated alumina chamber all with pneumatic valve and control arrangements, clear water reservoir (30 minute detention time), Solid-liquid sludge separation bed with 100% recirculation facility, including the cost of all mechanical and electrical items (but excluding the cost of Raw water inlet pumps and clear water pumps), all accessories & RCC sludge storage tank etc, chemical house-cum-store, administrative building (with minimum 100 m2 plinth area), allied pipeline, integration of total plant etc. all complete showing all necessary arrangements, structural & hydraulic detail based on departmental drawing and specification with trial run for a period of 3 (three) months after completion of the works and 3 months maintenance after successful trial run including the cost of chemicals but excluding the cost of electricity charges.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements