Public Health Engineering Department Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Public Health Engineering Department - PHED Tender
Eprocure
Opening Date14 Mar 2024
Closing Date28 Jun 2024
Tender Amount₹ 11,48,396 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 25,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PHED_685405_1Bid Award Id
ViewTender No
WBPHED/EE/2023-24/CDD/ NIeT 18Tender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://https://wbphed.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
f) Main Pinion shaft (Jack Shaft) As per sample Size: 90 mm x 1625mm length (EN-19 steel).
1
-
-
... More
i) Mertel oil seal (As per sample)
2
-
-
... More
Supply and Delivery of Compressor Hose with both end fitting with extra joining socket (Make : J.K. Pioneer) 1½" (38mm) I.D.x 7.5 outer long x 4 nos
30
-
-
... More
a) Drive spoket Duplex (as per sample) SIZE: 8"x 4'x 2½" Bore EN-19 materials
1
-
-
... More
d. Air filter primery
1
-
-
... More
d) Bearing 32316 NTN or Approved
2
-
-
... More
f. Engine oil (15-W-40) CH4 TURBO FLEET (Volvoline/ Approved)
34
-
-
... More
Add: 1% LW CESS
1
-
-
... More
Hiring and Engaging service engineer along with specialized mechanics for dismantling auxiliary unit of compressor oil, filter units, pressure regulating etc. with Cummins Engine like all filter unit, Engine oil coolant etc for detecting faulty elements as per direction of EIC.
1
-
-
... More
j) Block shinker
4
-
-
... More
b. Pressure Regulating valve kit (2911011100)
1
-
-
... More
c. Screw Lab (Compressor oil –9095142520) (20 ltrs.)
3
-
-
... More
b) Phospharus Branze Bush for C.R. (Small end) Size : 100mm x 60 mm x 80 mm (As per sample).
2
-
-
... More
Repairing of connecting Rod, Bush, body (Both portion) damaged part both side rematilizing machining with grinding finish as per new P.B, Bush outer dimension all complete as per direction of EIC .
2
-
-
... More
b) Clutch presasure plate set (Ley parts)
2
-
-
... More
d) Clutch finger kit set (Ley parts)
2
-
-
... More
h) Rectifire assembly (200V x 320W D.C.)
6
-
-
... More
c) Febrication 2.5'' dia bend semlees tube with both end Flench for mudpump delivery line, Size: (3" OD x ½" thick x 48" long).
1
-
-
... More
Repairing of Piston (Cross Head C.I) boring machining as per diamention of new Piston Pin Bush etc as per direction of EIC.
2
-
-
... More
h) Valve, Valve sheet, Plate Bolt
8
-
-
... More
Supply & Delivery of the following materials at site for Cummins Engine – 6CTA 8.3 :
-
-
-
... More
g) Bearing 3311 NTN/ Approved
2
-
-
... More
b) Bearing 7219B
4
-
-
... More
Supply & Delivery of following materials at site:
-
-
-
... More
Supply & Delivery of following materials at site for Mud Mixture (Kirloskar TAF-I Aircool):
-
-
-
... More
j) Pinion Gear (Halical Gear L+R) materials EN-24 OD 140mm length 190mm
1
-
-
... More
m) Foot valve 3"
3
-
-
... More
b) Rod Bush (Main Shaft) (As per sample)
2
-
-
... More
o) Gear Box packing
1
-
-
... More
Dismounting and Dismentling mud pump oil chamber, Ecentic gear assembly, pinion shaft (Jack shaft), clutch unit etc. from the Rig units by help of chain pulley block etc. for repairing with part by part opening for detecting faulty elements as per direction of EIC.
1
-
-
... More
Supply & Delivery of the following materials for rotary table hydralic cylinder assembly:
-
-
-
... More
k) Top Penion set
1
-
-
... More
h) Wiper blade
2
-
-
... More
Supply & Delivery of the following materials for XAVS-600-200 compressor at site :
-
-
-
... More
c) Glassy Filter
1
-
-
... More
Repairing of mud pump clutch pressure plate mchining, grinding, pollishing, with supply of Clutch strip set, Washer, Nut A& Bolt etc as per direction of EIC.
1
-
-
... More
Making and supply & Delivery of following materials at site:
-
-
-
... More
Nozzle complete set (MICO)
1
-
-
... More
Complete assembly of the Hydrolic Ram (Rotary Table) with help of supplied materials sl no 13 (a to e) with other repaired materials along with old serviceable materials in propper allignment all complete as per direction of EIC.
1
-
-
... More
l) Sliding sleave (1st & 2nd) + 2 ZF
1
-
-
... More
e) Clutch spring kit set (Ley parts)
2
-
-
... More
c) Piston Pin (Cross head pin) (As per sample) Size: 80mm x 190mm EN 19-Steel.
2
-
-
... More
f) 1" Pitch connecting link (Rolon/ Approved)
1
-
-
... More
e) Rubber Gasket for oil chamber ( 4' x 4')
1
-
-
... More
e) 1" Pitch half link (Rolon/ Approved)
1
-
-
... More
f) PVC Water Tank (60 Ltrs.)
2
-
-
... More
i) Clutch Release Bearing Hob
2
-
-
... More
Dismounting and Dismentling the the water swivel from kelly assembly of rig carrier then part by part segrgation the serviceable spares to unserviceable spares as per direction of EIC.
1
-
-
... More
d) Fuel Pump (MICO)
1
-
-
... More
Supply & Delivery of following materials at site:
-
-
-
... More
Assembly of the water swevel with help of supplied materials sl no 18 (a to d) with other repaired materials along with old serviceable materials then fitting fixing with kelly assembly of the rig carrier as per direction of EIC.
1
-
-
... More
Supply & Delivery of followings at site for compressor Truck WB-11D-4533(TATA 709).
-
-
-
... More
a) Diesel Filter element
1
-
-
... More
k) Duplex Spocket (As per sample)(EN-19 materials
1
-
-
... More
c) Grease
2
-
-
... More
d) Pneumatic exhaust air valve (Make: Airmax/ Approved)
4
-
-
... More
p) End Flange
2
-
-
... More
Repairing of main body part both end of eccentric big gear (Helical) assembly then mechining , grinding as per new P.B. Bush Inner diamention on both end part etc all complete as per direction of EIC.
1
-
-
... More
b) Wiper blade (Long type)
2
-
-
... More
a) Head Light with Bulb complete set with Halogen Bulb
2
-
-
... More
g) Mud pump pressure Meter with adopter (As per sample) Make : H.Guru
1
-
-
... More
Making and supply & Delivery of following materials at site :
-
-
-
... More
a) Phospharus Branze Bush for C.R. (Big end) (Two in a set) Size : 200mm OD x 130 mm ID x 115 mm long (As per sample).
2
-
-
... More
a. Fuel water separator
1
-
-
... More
h)Bearing 6312 NTN/ Approved
2
-
-
... More
n) Sliding sleave (2nd + 3rd) ZF
1
-
-
... More
h) Clutch withdrawl plate
2
-
-
... More
m) Sliding sleave (5th + 6th) ZF
1
-
-
... More
n) Engine Oil Volvo line (20W-40)
10
-
-
... More
Reassemble of service charges of Atlas Copco compressor and Cummins Engine by replacing the old spares with newly supplied spares Sl No- 26 (a to c), and 27(a to g) and fitting fixing its original position with other repairing materials with testing load and unload (approx 2 hrs)HSD will supplied by the agency as per direction of EIC.
1
-
-
... More
Dismentling & Defixing the mud pump drive assembly & fluide chamber units then through cleaning washing and segregation of serviceable to unserviceable materials for repairing purpose as per direction of EIC.
1
-
-
... More
q) Gear oil EP-90
10
-
-
... More
g) Coolent readymix fleetguard
10
-
-
... More
k) tank bracket with clamp
2
-
-
... More
i) Liner (Bore: 155mm x O.D. 195mm x 15" long)
2
-
-
... More
k) 1" Pitch triplex half link
1
-
-
... More
i) Gear Cover (AVI)
1
-
-
... More
Assembly of the engine with help of supplied materials of SL no-32 (a + o) along with serviceable spares then fitting fixing with testing at site all completet as per direction of EIC.
1
-
-
... More
m) Gear oil EP-140 H.P
80
-
-
... More
h) Fuel pipe
2
-
-
... More
a) Metal oil seal (As per sample)
4
-
-
... More
b) Head & Other Gasket
1
-
-
... More
j) Piston Rod with Lovk Nut (38mm O.D x 50" long)
2
-
-
... More
l) Metal flow pipe
2
-
-
... More
f) Fuel Filter assembly (S.S)
1
-
-
... More
Repairing of main drive shaft (jack shaft) rematilising, turning, grinding to original dimention of sporket, Bearing, with new key etc all complete as per direction of EIC.
1
-
-
... More
g) Clutch Pilot Bearing
2
-
-
... More
a) Liner, Piston, Rig, complete set
1
-
-
... More
f) Clutch Release Bearing (Ley parts)
2
-
-
... More
Supply & Delivery of the following materials at site for water swivel :
-
-
-
... More
a) Clutch plate set (Ley parts)
2
-
-
... More
b. Lub oil filter
1
-
-
... More
l) Clutch sigment (Clutch plate) (As mper sample)
9
-
-
... More
d) 1" Pith Duplex Roller chain (Rolon/Approved)
12
-
-
... More
Dismenling the fully dammed silencer unit with supply of a) silencer pipe, b) 5" SilencerBracket-4nos, c) Manifold packing-2nos, d) 8mm x 2" Bolt & Nut-4nos, with repairing of Silencer Box welding etc fitting fixing in propper allignment all complete as per direction of EIC.
1
-
-
... More
l) Grease
3
-
-
... More
Fitting fixing the above materials sl no. 37 (a to d) along with old serviceable materials as per direction of EIC.
1
-
-
... More
Dismentiling the Mud Mixtue pump Engine then through cleaning washing and segregation of serviceable to unserviceable materials for overhauling as per direction of EIC.
1
-
-
... More
g) Regulator Assermbly (As per sample)
1
-
-
... More
c. Coolant filter
1
-
-
... More
Assembly of 2 nos of Gear Box clutch unit complete set with help of supplied materials sl no.22 (a + r) and old serviceable materials with adjustment ofClutch unit fitting fixing the Gear box assembly with transmission line (Cutting shaft) both on road & Drilling part with testing etc all complete as per direction of EIC.
2
-
-
... More
Dismentling the entire Stearing system with Kin pin complete set and clutch assembly part by part opening with repairing and servicing the same with supply of a) Kin pin complete set-2 nos, b) Clutch cilynder kit set -2 set, c) Bush-2nos, by clutch Cylinder Bolt-4 nos, etc including welding machining turning with fitting fixing all complete as per direction of EIC.
1
-
-
... More
e. Air filter secondary
1
-
-
... More
Complete assembly of the mud pump oil chamber, Jack shaft clutch unit etc with help of supplied materials sl no 2 (a to m) with other repaired materials sl no 3,4,5,6 along with old serviceable materials in propper allignment all complete as per direction of EIC.
1
-
-
... More
d) Rod Wiper (As per sample)
2
-
-
... More
Full servicing & cleaning with opening sump, oil filter coolant etc replacement with fitting fixing and supplied materials SL No-30 (a to h) in proper alignment with engine tapping adjusting all complete as per direction of the EIC.
1
-
-
... More
Reapiring of Hydrolic main shaft damaged thread part welding machining with rethreading as per the original diamention as per direction of EIC.
2
-
-
... More
j) Clutch Housing set
1
-
-
... More
f) Gear oil (EP 140)
10
-
-
... More
c) Push Rubber
1
-
-
... More
Supply & Delivery of the following materials at site for gear boxes (Rig on road & drilling gear box).
-
-
-
... More
c) Lock with Lock Nut (As per sample)
2
-
-
... More
d) Alen Key Bolt (H.T)
4
-
-
... More
i) Welding Copper Cable (70mm dia) ISI Make
15
-
-
... More
a) Hydrolic Cylinder Kit complete set (As per sample)
2
-
-
... More
c) Battery terminal
2
-
-
... More
b) Mobil Filter element
1
-
-
... More
d) Taflon Tape
2
-
-
... More
Repairing of wash pipe withnwater swivel inner thread cutting with rethreading etc all completet as per direction of EIC
1
-
-
... More
g) Silencer Box with Mani fold
1
-
-
... More
r) Silencer complete set (Mainifold to silencer)
1
-
-
... More
e) Main shaft Nut (Size: OD 50mm x 100mm with inner thread (EN-19)
2
-
-
... More
Dismantling and dismounting the Rotary table Hydrolic Cylinder assembly from the Rig carrier then through cleaning washing & segregation of serviceable to unserviceable materials for repairing purpose as per direction of the EIC.
1
-
-
... More
Repairing of Hydrolic Cylinder repairing lower damaged paret rethreading as per new nipple diamention as per direction of EIC.
2
-
-
... More
Defixing & dismentling the Leyland Gear Box (Both Truck on road and Drilling Gear Box) clutch assembly from the rig carrier by arrangement of Hydrolic troly etc with washing cleaning servicing for detecting faulty elements as per direction of EIC.
2
-
-
... More
c) Clutch Disc plate set (Ley parts)
2
-
-
... More
Dismentling the entire Stearing system with Kin pin complete set and clutch assembly part by part opening with repairing and servicing the same with supply of a) Kin pin complete set-2 nos, b) Clutch cilynder kit set -2 set, c) Bush-2nos, by clutch Cylinder Bolt-4 nos, etc including welding machining turning with fitting fixing all complete as per direction of EIC.
1
-
-
... More
b) Febrication 6'' M.S. section Band tube with both end Flanch, size:(6'' OD x 1/4'' thick. x 10 feet long).
1
-
-
... More
g. Coolant (Redymix fleet guard/Approved)
45
-
-
... More
Repairing and servicing of self starter & Dynamo (12volt) after dismentling the same with replacement and supply of Carbon set, Bush.Bearing, , field coil, retaping etc with full servicing and fitting fixing with testing all complete as per direction of EIC.
1
-
-
... More
Complete assembly of the mud pump drive assembly with fluide end with help of supplied materials sl no 9 (a to m) with other repaired materials along with old serviceable materials in propper allignment all complete as per direction of EIC.
1
-
-
... More
e) Electric wire 205mm copper cable (Make: HAVELS/ Approved)
2
-
-
... More
d) Air filter (Outer + Inner)
1
-
-
... More
Add: 18% GST
1
-
-
... More
a) Febrication of Base plate M.S. frame Bush with tappered bore shoud be machining ( As per circular tapper Jaws set) and top support running welding, size (44"OD x ¾" thikness x 11" height)
1
-
-
... More
Repairing the four wheel and servicing the wheel with supply of necessary spares a) oil seal (rear + fron)2nos, Axcell Joint -2nos,Naked pin-6nos, Wheelgreasing 4, Wheel Nut-1no, with washing cleaning servicing of bearing etc, with opening fitting the same at site Front wheel-2nos, Rear wheel-4nos, as per direction of EIC.
1
-
-
... More
c) Bearing UCP213-208- NTN/ Approved
2
-
-
... More
a. 750 HRS Service pack (9095049970) i) Air filter counter liner -(Outer + inner) 1 set ii) Oil filter -2 nos.
1
-
-
... More
k) Hallied packong set (Water proof) (various size)
6
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements