Municipal Affairs Department Tender

... More
The MAD has issued a formal invitation for competitive bids for the Municipal Affairs Department project, for Construction Of Road From Patani Mondal House To Probash Saha House At Ward No 07 Under Dhuliyan Municipality ( H.f.a I.d 2016-2017) in Murshidabad, West Bengal, with an estimated contract value of Rs. 8,94,145. The bid opening date for this tender is 12-03-2025 and the last date for bid submission is 02-04-2025. Interested bidders for Municipal Affairs Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Municipal Affairs Department - MAD Tender

Opening Date12 Mar 2025
Closing Date2 Apr 2025
Tender Amount₹ 8,94,145 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free

GEM & Bid Advisory Services

Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in excavation of foundation trenches odrains, in all sorts of soil (including mixed soil butexcluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimmingthe sides of trenches, levelling, dressing andramming the bottom, bailing out water as requiredcomplete. (a) Depth of excavation not exceeding 1,500 mm.

46.97

11927

5601.99

... More
Cement concrete with graded stoneballast(40mm size excludingshuttering)In ground floor(A) [Pakur Variety](a) 1:3:6 proportion

9.39

5061

47547.17

... More
Hire and labour charges for shuttering with centering andnecessary staging upto 4 m using approved stout props andthick hard wood planks of approved thickness with requiredbracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out aftercompletion of works (upto roof of ground floor)(When the height of a particular floor is more than 4 m theequivalent floor height shall be taken as 4 m and extra forworks beyond the initial 4 m ht. shall be allowed under 12 (e)for every 4 m or part thereof) (f) 25 mm to 30 mm shuttering without staging in foundation

33.4

205

6847

... More
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or infoundation or in foundation trenches.

167

24

4008

... More
Supplying Spreading and Consolidating Stone duist to a depth of 100 mm and above at desired density and C.B.R .as per specificatiuon with power roller to proper gradient and cambert including waterring as necessary and lighting guardi9ng barricading and making adequate earthen bundh where necessary to protect the edges and curing with water 2 to 3 days , mending cracks and depressions by rolling where necessary including all incidental charges of roller cost of fule & lubricants complete as per Specification P- 242, IT -14.06

91.85

888

81566.47

... More
Cess @ 1%

1

8852

8852.91

... More
Earth work in filling in foundation trenches or plinthwith good earth, in layers not exceeding 150 mm.including watering and ramming etc. layer by layercomplete. (Payment to be made on the basis ofmeasurement of finished quantity of work) (a) With earth obtained from excavation of foundation.

46.97

7754

3641.98



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.