The MAD has issued a formal invitation for competitive bids for the Municipal Affairs Department project, for Construction Of Boundary Wall For Pump House At Chandmani, W/no-47 (15th Fin) in Darjeeling, West Bengal, with an estimated contract value of Rs. 6,56,880. The bid opening date for this tender is 24-05-2025 and the last date for bid submission is 14-06-2025. Interested bidders for Municipal Affairs Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Municipal Affairs Department - MAD Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date24 May 2025
Closing Date14 Jun 2025
Tender Amount₹ 6,56,880
Costs
EMD
₹ 13,138Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_MAD_851201_4Tender No
06/WBMAD/SMC/PW/2025-2026Tender Authority
Municipal Affairs Department ViewPurchaser Address
-Website
http://http://www.wburbanservices.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
(a) 1:3:6 proportion.
6.4
3393
-
... More
Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant codes.
-
-
-
... More
(ii) River bazree.
13.88
4745
-
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction.
-
-
-
... More
(a) For works in foundation, basement and up to roof of ground floor/up to 4m. Tor steel/Mild steel.
-
-
-
... More
SAIL/ TATA/RINL
1.307
73743
-
... More
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor).
-
-
-
... More
(f) 25mm. To 30mm. Shuttering with out staging in foundation etc.
277.5
205
-
... More
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.
127.5
674
-
... More
M.S structural work in colums, beams etc. with simple roled structural members (e.g. joints angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineering -in- charge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc weldingconforming to IS: 816 - 1956 & IS :1995 using electrodes of approved make and brand conforming to IS: 814 - 1957, haulage, hoisting and erections all complete. the rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidential charges such as electricity charges, labour incurance charges etc.(Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for Gusset, bracket, cleat, rivets, bolts and nuts may be make by adding
-
-
-
... More
(I) For structural members/built up sections of specified sections weighing less than 22.5kg./m.
0.32
74571
-
... More
(a) Supplying, fitting galvanised 3 ply 12 gauge/ 4 points line of barbed wire in fencing (holes already made in the body of the post) or fixed by staples tightening and fixing the wires in taut condition with straining bolts including the cost of cutting and of lapping joints in the wire as necessary but excluding the cost of glvanised staples, straining bolt and binding wire where necessary. (Payment to be made on the lenght of individual lines of wire.).
1530
27
-
... More
Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface].
-
-
-
... More
(ii) With 1:4 cement mortar .
-
-
-
... More
(b) 15 mm. thick plaster.
255
157
-
... More
Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface].
-
-
-
... More
(ii) With 1:4 cement mortar .
-
-
-
... More
(c)10 mm. thick plaster.
191.125
126
-
... More
Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m.
51
34
-
... More
(a) M.S. or W.I. ornamental grill of approved design joints continuously welded with M.S., W.I. flats and bars for windows ,railing etc. fitted and fixed with necessary screws and lugs in ground floor. (Add extra @1% for each addl. floor up to 4th floor and @1.25% for each addl. floor above 4th floor).
-
-
-
... More
(ii) Grill weighing above 16 kg./sq.m.and above .
-
-
-