Municipal Affairs Department Tender
... More
The MAD has issued a formal invitation for competitive bids for the Municipal Affairs Department project, for Construction Of Road From Paschim Momin Para To Mojibur Sk House And Alim House Via Dactor Rejaul House At Ward No 03 Under Dhuliyan Municipality( H.f.a I.d 2016-2017) in Murshidabad, West Bengal, with an estimated contract value of Rs. 16,14,715. The bid opening date for this tender is 12-03-2025 and the last date for bid submission is 02-04-2025. Interested bidders for Municipal Affairs Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Municipal Affairs Department - MAD Tender
Opening Date12 Mar 2025
Closing Date2 Apr 2025
Tender Amount₹ 16,14,715
Costs
EMD
₹ 32,294Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Construction Of Road From Paschim Momin Para To Mojibur Sk House And Alim House Via Dactor Rejaul House At Ward No 03 Under Dhuliyan Municipality( H.f.a I.d 2016-2017)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_MAD_825314_10Bid Award Id
ViewTender No
DHLYN/HFA/16/2024-2025Tender Authority
Municipal Affairs Department ViewPurchaser Address
-Website
http://http://www.wburbanservices.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earth work in excavation of foundation trenches odrains, in all sorts of soil (including mixed soil butexcluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimmingthe sides of trenches, levelling, dressing andramming the bottom, bailing out water as requiredcomplete.
(a) Depth of excavation not exceeding 1,500 mm.
98.44
11927
11740.7
... More
Earth work in filling in foundation trenches or plinthwith good earth, in layers not exceeding 150 mm.including watering and ramming etc. layer by layercomplete. (Payment to be made on the basis ofmeasurement of finished quantity of work)
(a) With earth obtained from excavation of
foundation.
98.44
7754
7632.88
... More
Cement concrete with graded stoneballast(40mm size excludingshuttering)In ground floor(A) [Pakur Variety](a) 1:3:6 proportion
19.69
5061
99649.63
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stonechips (20 mm nominal size) excluding shuttering andreinforcement if any, in ground floor as per relevant IS codes.(i) Pakur Variety
52.5
5275
276987.9
... More
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or infoundation or in foundation trenches.
350
24
8400
... More
Cess @ 1%
1
15987
15987.27
... More
Hire and labour charges for shuttering with centering andnecessary staging upto 4 m using approved stout props andthick hard wood planks of approved thickness with requiredbracing for concrete slabs, beams and columns, lintels curved
or straight including fitting, fixing and striking out aftercompletion of works (upto roof of ground floor)(When the height of a particular floor is more than 4 m theequivalent floor height shall be taken as 4 m and extra forworks beyond the initial 4 m ht. shall be allowed under 12 (e)for every 4 m or part thereof)
(f) 25 mm to 30 mm shuttering without staging in foundation
70
205
14350