Kolkata Port Trust Tender

... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Kolkata Port Trust - KOPT Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date24 Jan 2025
Closing Date20 Feb 2025
Tender Amount₹ 3,02,76,299 
Notes
Download

Costs

Summary

Construction Of Dedicated Jetty With Other Ancillary Works Near Indenture Memorial

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Paint on M.S. works (M.S. sheet pile, M.S. shutter, M.S. Tube etc.) with inter tuff of equivalent anticorrosive bituminous paint of approved make and brand over a coat of red lead primer including removing old scales and rust and cleaning the surface properly with emery paper be for application of paint on all steel work (exterior ) – Two coats.

130

76

9977.5

... More
Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.(This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.)

900

29

26100

... More
Provide and paint with best quality synthetic enamale paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface if necessary. Two coats (with any shade except white) on steel surface.With hi-gloss of approved quality

200

79

15800

... More
Painting with superior quality aluminium paint of approved make and brand including smoothening surface by sand papering etc. on steel surface : (a) Two coat

700

57

39900

... More
Supply, fit and fix G.I. pipes of TATA make with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads, fitting, fixing etc. complete in all respect including cost of all necessary fittings as required, jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accessories, specials.) For Exposed Work i) 32 mm dia. medium quality

150

355

53250

... More
ii) 50 mm dia. medium quality

150

540

81000

... More
Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. in ground floor including roof.Upto 150 mm. thick

5

939

4695

... More
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. i) Depth of excavation not exceeding 1.5 m.

10

119

1192.7

... More
ii) Depth of excavation for additional depth beyond 1.5 m and up to 3 mt but requiring shoring.

5

192

961.9

... More
Fill in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (Payment to be made on measurement of finish quantity)

10

936

9362.1

... More
Dismantle all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof.

20

447

8940

... More
Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars in ground floor including roof.

5

1956

9780

... More
Dismantle all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75m. In ground floor including roof. Above 150 mm. thick.

5

1417

7085

... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in gound floor as per relevant IS codes. Pakur Variety

10

7611

76110

... More
Supply, fabricate and provide M.S. Liner 8mm. thick for RCC Bored piles, Steeling well etc.

4

117831

471327.72

... More
Provide Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. For works in foundation and upto roof of ground floor/upto 4 m Tor steel/Mild steel. SAIL/TATA/RINL

8

60580

484640

... More
Hire and labour charges for the shuttering with centering and necessary staging up to 4Mtr using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs beams, columns, lintels curved or straight including fittings, fixing and striking out after completion of the works (up to roof of ground floor) as per the direction of Engineer – In – Charge. 25 mm to 30 mm shuttering without staging in foundation

20

209

4180

... More
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-in- charge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1956 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 1957, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof. I) For structural members of specified sections weighing less than 22.5 Kg./m

5

72603

363015

... More
Holding down bolt with nut including 100 x 100 x 6 mm plate washer at bottom fitted complete and packing the hole with cement concrete or cement grout as directed. 32mm. dia x 500mm. long.

15

508

7620

... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and fillingjoints with powdered earth or local sand.

10

358

3580

... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)Steel shuttering or 9 to12mm thick approved quality ply board shuttering in any concrete work.

50

369

18450

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints or roughening of concrete surface including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]. With 1:4 cement mortar 15 mm thick plaster.

50

167

8350

... More
Neat cement punning about 1.5mm. thick in wall, dado, window, sills, floor, drain etc. (Note : Cement 0.152 Cum. Per 100 Sqm.)

50

34

1700

... More
Labour for driving Sal-bullah / Eucalyptus bullah piles by monkey in sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. (i) 100mm diameter [Payment to be made on the length driven into the ground, diameter of the measured at 1.5m. from the thicker end.]

350

83

29050

... More
Supplying Sal-bullah piles at work site, including dressing and making one end pointed (i) 100mm diameter.[Diameter of pile to be measured at a distance of 1.5m from the thicker end.]

500

142

71000

... More
Labour for fitting and fixing 10 cm. to 13cm. diameter sal bullah as ties and runners including necessary nails, bolts and nuts.

50

20

1030

... More
Supplying empty Cement bags in good condition.

2000

3

6600

... More
Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of sand and gunny bags.

2000

3

7000

... More
Provide and fixing 40mm. internal dia PVC Pipes with the pile reinforcement cage (Oriplast PVC 1120 conforming to ASTMD 1785 or equivalent), for conducting Cross Hole Ultrasonic Monitor (CHUM), test in two diametrically opposite directions inside the driven piles before concreting. (all as per specification and sketch attached with the tender).

150

372

55896

... More
M.S. or W.I.Ornamental grill of approved design joints continuously welded with M.S,W.I. Flats and bars of window, railing etc.fitted with necessary screws and lugs in ground floor. i)Grill weighing above 10 kg,/mtr and upto 16 kg./mtr.

5

9888

49440

... More
Supplying, fitting & fixing single skin colour coated trapezoidal profile for wall cladding,roof shall be made of 0.45 mm BMT(Base Metal Thickness)(0.50 mmTCT(Toal Coating Thickness excluding paint),G550(min 550 yield strength)of Zincalume metalic coating(IS:15965)with high Solar Reflection Index(SRI)value for better colling as per thermatech technology,1000 -1015 mm efective cover width with five major corrugation,28 mm high rib spaced at 203 mm c/c with subtle square fluting in the pan and the end rib shall have anti-capillary groove and return leg.The steel sheet shall be fastened with 40 micron zinc coated or 25 micron zinc-tin alloy coated,hex head,self drilling screw as per IS: 3566-2002 Class 3 fastener.The base steel shall be coated with zinc-aluminium alloy Zincalume(AZ150)(i.e 55% Al,43.4% Zinc,1.6% Si)minimum of 150 g/m2 Coating toal on both sides,pre-painted with colorbond XRW(Xterior roofing,walling)paint system of 35 micron Super Durable Polyester paint(SDP)with stable inorganic pigment with no lead contents confirming IS15965.The sheet shall be free from defects have brand making of the manufacturer giving product details on the back of the sheet at regular interval confirming genuinity of the material. In roof(a) With 0.50mm thick sheet.

150

787

118050

... More
Galvanised iron sheet ridging fitted with necessary bolts, screws,washers etc complete. (225mm end lapping) (B) 450 mm lapping each way with 0.60 mm sheet.

35

469

16415

... More
Design, supply, fabricate, test and deliver at approved location ( near Indenture Memorial Jetty) , 30.00m x 9.25m x 1.60m (average depth) one main steel pontoon (1.70m deep at centre and reduced to 1.50m deep at the ends) including fitting and fixing rubber fender (D-type- 200mm x 200mm) conforming to B.S./A.S.T.M./DIN or J.I.S. specifications together with deck fittings and other fixtures as specified as per drawing No.9007 and also to the satisfaction of the Engineer all complete including supply of all materials, labour, transportation and all tools and equipments etc. for fabrication work. Also include for supply of a minimum 5m length of extra rubber fenders with fittings and fixtures in standard lengths for the pontoon as spare including necessary painting on all surface both inside & outside, all complete as per the direction of the Engineer-in-Charge.

2

7258184

14516368.44

... More
Supply,test and deliver of good condition used Stud link mooring anchor chain dia 56 mm and above at work site(near indenture memorial jetty). [Note:-1 Shackle = 27.50 Mtr]

14

212000

2968000

... More
Supply,test and deliver of good quality 'D' type end Joining Shackle dia 56 mm and above at work site(near Indenture memorial jetty).

10

3000

30000

... More
Supply,test and deliver of good condition used Stud less mooring chain dia 48 mm and above at work site(near Indenture memorial jetty). [Note:-1 Shackle =27.50 Mtr]

2

188000

376000

... More
Supply,test and deliver of good quality 'D' type end joining Shackle dia 48 mm and above at work site(near Indenture memorial jetty).

5

2200

11000

... More
Supply,test and deliver of good quality used Mooring steel anchor (weight 5.0 Tons and above) at work site(near indenture memorial jetty).

4

560000

2240000

... More
Supply,test and deliver of good quality used Single fluke steel anchor (weight 3.0 Tons and above) at work site(near indenture memorial jetty).

2

380000

760000

... More
Manufacture and Supply of Yoke assembly consisting of Yoke Arm(length 2920 mm) made of Carbon Steel Forgings(as per IS:1875),Pin(Dia 140 mm) with Nut,Yoke Base made of Grey Iron Castings (as per IS:210),Yoke Roller (Dia 150 mm) with 5 mm thick G.M Bush(Dia 150 mm) including all accessories.All Complete.

1

425000

425000

... More
Installation charges of a Steel Pontoon with placing of Mooring anchor and stud link anchor chain in suitable position into river bed and also connection to Dead man with stud link chain for securing the positioning of pontoon as directed by SMPK including provision of all labours, tools and tackles, plants equipment, Crane Burge, vessels, boats etc. so as to make the pontoon ready for operational condition.In all complete(Mooring anchor,stud link anchor chain & Dead man will be paid seperately)

2

965000

1930000

... More
Construction of Dead man for anchoring of MS Pontoon at shore side as drawing including driving of second hand rail,earth cutting,concreting,reinfotcement and shuttering etc.(second hand rail supplied by KoPT)all complete as per the direction of the Engineer in Charge.

4

100000

400000

... More
Providing Bored Cast-in-situ R.C.C. pile in position as per specifications in all kinds of soil including cost of boring using drilling mud to stabilize the bore and flushing the bore of excess mud with freshly prepared drilling fluid by using pumps prior to placing concrete by tremie pipe in one continuous operation and including the cost of all materials and labour for placing of concrete and also including the cost of mobilization and hire charges of all equipment necessary for boring, welding of reinforcement cage as necessary and lowering of reinforcement cage, preparation and placing of concrete, including the cost of including the cost of concrete but excluding the cost of reinforcement and labour for bending binding etc. complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Work to be executed as per IS: 2911 (Part II Sec 2).(b) Using hydraulic piling Rig i) Pile diameter - 1000 mm.

60

4278

256680

... More
Performing Lateral load test on two piles or two groups of piles by introducing a hydraulic jack with gauge between two piles or pile groups under test by applying horizontal loads in increments of about 20% of the estimated safe load at each stage and applying the next increment after the rate of displacement is nearer to 0.1 mm. per 30 minutes till the total displacement becomes, 12 mm at the cut off level including the cost of arranging the entire set-up, hire charges of all implements including at least two dial gauges, preparing the pile head if necessary, and removal of all arrangement after completion etc. complete in all respect including cost of carriage of all materials and as per IS specification and direction of Engineer-in-charge.

1

27400

27400

... More
Cutting/cleaning/removing jungles,including uprooting/removing of rank vegetation,cutting gran,bush wood cutting gran,bush wood cutting/removing small tree saplings or branches of trees falling under the cutting area at different area of dock and removing spoil upto a distance of 50 m. outside the periphery of the area cleared as per direction including all lead,lifts,cutting,instrument,labour etc.complete in all respect.

5000

4

20000

... More
Supplying ready mixed concrete of M 30 Grade with well graded stone chips of 20 mm nominal size containing designed quality of cement per cum of wet concrete produced in computerised batching plant under controlled condition using approved super plastisizer,designing concrete mix following I.S 10262 and i.s 456,transporting the mix with agitation in transit mixer to work site depositing the mix on a platform erected for the purpose at required levels of concreting and then placing the mix in its final location of formwork,compacting and curing the same complete as per specification & direction of the Engineer-in-charge including computerised batching plant transit mixer with all accessories vibrators etc.inclusive of all other incidental charges in this connection complete but excluding cost of hire charge of platform and its supporting staging which would be paid through seperate item.[cement to be supplied by the Manufacturer/supplier]in ground floor and foundation without approved concrete pump.

60

9258

555480

... More
Supply Air Compressor Machine including labour ,operator,fuel permit etc. for 8 hours at desired location all complete.

2

8855

17710

... More
Hire charges of Earth mover/Excavator cum loader for 8 hours including one no.operator,one no helper,fuel etc.The rate inclusive of all expenses etc.complete.

4

11057

44231.68

... More
Charges of Loading, unloading and stacking by Manual Means. Loading in to trucks at the lifting point, unloading at destination, stacking properly in go downs or yard etc. as directed including carriage by head load up to a lead of 50.00 m at each of the two point(i)Steel

3.5

96

336

... More
Carriage Cost of Steel materials over pucca road.(From SMPK Rail Yard near Kantapukur, to Proposed Jety near Indenture memorial)(i)Upto 5.00 KM Distance

3.5

82

287

... More
Transportation, Loading & unloading charges of a Heavy type 30.00 mtr.long (approx) steel gangway from fabrication Yard to the work site(near Indenture Memorial jetty) with adequate care including provision of all labours, tools and tackles, plants equipment, Crane barge, vessels, boats etc.In all complete.

1

200000

200000

... More
Unforseen miscellaneous items of work that are not covered in BOQ items but can arise due to change or modification of the work as per site conditions to be paid either through any schedule items in PWD SR of WB with contractor's quoted rate or SMPK spl rates on actual cost basis with contractor's profit as per conditions of contract upon specific prior approval of the Chief Engineer.

1

500000

500000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.