Kolkata Metropolitan Development Authority Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Kolkata Metropolitan Development Authority - KMDA Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date11 Apr 2025
Closing Date18 Apr 2025
Tender Amount₹ 3,21,379
Costs
EMD
₹ 6,430Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
01/ee/div-iv/housing (bsup)/kmda Of 2025-2026
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_KMDA_834132_1Bid Award Id
ViewTender No
01/EE/DIV-IV/Housing (BSUP)/KMDA of 2025-2026Tender Authority
Kolkata Metropolitan Development Authority ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Cutting chase upto 125 x 150 mm. and subsequent mending of damages. (a) in brick wall [Cement-3.6 Kg/Mtr]
112
93
10416
... More
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge.
28
166
4648
... More
Colour washing with any shade with Stainers, as required including cleaning and smoothening surface thoroughly : (ii) External surface (Ground floor) (b) Two coats (on new works only). i) Other than yellow, pink.
362
21
7728.7
... More
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.
16.5
736
12144.66
... More
Add Labour Welfare Cess @ 1% on Total amount over item No. 1 to 14
318197
-
3181.97
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] ii) With 1:4 cement mortar (a) 20 mm thick plaster (i)At Ground Floor.
80
194
15520
... More
Preparation of drainage spout on roof for bituminous waterproofing treatment after required grading and shaping of the under bed with Cement Concrete (1:2:4) or Cement Mortar (1:4) as directed, Chamfering and moulding the parapet wall to form a bell mouth entry, if required and providing full course treatment with bituminous felt to facilitate quick and smooth drainage of watwr into the down pipes complete including cost of all materials and labour according to satisfaction of the Engineer - in - Charge.
(This item shall be done for reparing works only and shall not be used when original//renewal of tarfelting work is proposed to be undertaken) All floor
16
110
1760
... More
Add GST @ 18% on Total amount over item No. 1 to13
269658
-
48538.44
... More
Supplying & laying 3mm thick pre-fabricated plastomeric water proofing membrane conforming to EN 12311-1 & ASTMD 5147, manufactured with atactic poly propylene (APP) modified premium grade asphalt , specially reinforced with non-woven polyester core with polyester reinforcement @160 gms per sqm & both faces covered with thermo-usible polyethylene film /MineraL on top face over a coat of primer @ 0.40 lit/sqm of manufacturer's specification on smooth,clean dry surface prepared wherever required. Lap joint shall be provided of 75 mm in longitudinal & 100 mm in transverse direction and fused using LPG/ Propane torch employing extra care ensuring full bondage, complete removal of entrapped air and sealing edges into grooves in appropriate manner as per direction of Engineer -in-charge all complete including materials,labour and applicable taxes. (Payment shall be made on the basis of finished surface area.). Membrane Property: Softening Point 150 deg C, Cold Flexibility -6 deg C, Tensile Strength, N/cm : 600 (longitudinal), 450 (transverse), Tearing Strength, N: 300 (longitudinal), 200 (transverse)
430
407
175010
... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (6mm nominal size) excluding shuttering and reinforcement,if any, in roof as per relevant IS codes.
1
6416
6416.91
... More
Application of priming coat for standard bituminous waterproofing treatment over flat roof with Bitumen primer of approved brand fufilling the provision of I.S. 1346 - 1991 & 3384 - 1986 applied @ 0.27 Liters /Sq.m. over clean and prepared roof surface complete as per satisfaction of the Engineer - in - Charge.
All Floor
430
24
10320
... More
c) 10 mm thick plaster (internal) iv) In 3rd floor
8
145
1160
... More
Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. a) At 3rd floor.
2
597
1194
... More
Taking out old damaged tarfelt from the roof, parapet etc. preparing the roof surfaces by removing all spoils, blisters, moss etc. from the working site and disposal of the same beyond the compound and cleaning the site in all respect as per direction of Engineer-in-Charge. All floor
430
12
5160
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements