Kolkata Metropolitan Development Authority Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Kolkata Metropolitan Development Authority - KMDA Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date2 May 2025
Closing Date13 May 2025
Tender Amount₹ 4,78,547
Costs
EMD
₹ 9,580Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Kmda/housing /ee/ Div-ii/circle I /nit-01/2025-2026
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_KMDA_841067_1Bid Award Id
ViewTender No
KMDA/HOUSING /EE/ DIV-II/Circle I /NIT-01/2025-2026Tender Authority
Kolkata Metropolitan Development Authority ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Dismantling R.C. floor, roof, beams etc. Including cutting rods and removing rubbish as directedwithina lead of 75m. includingstacking of steel bars. a) At 4th floor.
3
2156
6468
... More
Brick work with 1st class bricks in cement mortar (1:4)
(a) In superstructure, at 4th floor
3
6349
19047
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
(a) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work (i) At 4th floor
20
441
8820
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
(a) For works in foundation, basement and upto roof of ground floor/upto 4 m
(i) Tor steel/Mild Steel
I) other Manufacter not spcified
a) At 4th floor.
0.6
55145
33087.36
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety
a) At 4th floor.
3
5957
17873.34
... More
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.
a) At 4th floor.
12
784
9408
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]
(i) With 1:4 cement mortar
(a) 20 mm thick plaster
At 4th floor
35
210
7350
... More
Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application
of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor.
3 mm. thick topping (High polishing grinding on this not permitted with ordinary cement).
Using grey cement (i) 35 mm thick
a) At 4th floor.
15
357
5358.15
... More
Extra rate for using water proofing and plasticising admixture @ 0.2% by weight of cement (or at manufacturer's specified rate) for concrete of various grades.
8
119
952
... More
Applying 2 coats of bonding agent with synthetic multi functional rubber emulsion having adhesive and water proofing properties by mixing with water in proportion (1 bonding agent : 4 water : 6 cement) as per Manufacturer's specification.
220
88
19360
... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (6mm nominal size) excluding shuttering and reinforcement,if any, in 5th floor as per relevant IS codes.
Pakur variety
12
6416
77002.92
... More
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge.
15
166
2490
... More
Supplying and laying true to line and level 20 mm / 25 mm.thick precast roof tiles made of cement conc. with stone chipsas per approved strength and density set in 25mm avg. thickcement morter(1:3) and filling up joint (3 mm wide) with cement sand mortar (1:1) applying cement slurry @ 1.75 kgper Sq.m back of tiles and then settting close the precast tiles, finishing up the joints with slurry already laid and finally finishing the top surface including providing 150 mm. high skirting with the same tiles flushed with the inside surface of parapet wall,finishing the mouth of rain water pipes, curving etc. as necessary complete as per direction of the Engineer-in-charge. (Levelling if necessary may be paid separately
(a) For 20 mm. thick precast tiles (cement 14.6 kg/ Sq.m for underlayer)
(a) At 4th floor
220
560
123288
... More
Supplying P.V.C. water storage tank of approved quality with closed top with lid (Black) - Multilayer
(a) 1500 litre capacity
2
7840
15680
... More
Labour for hoisting plastic water storage tank.
(i) Upto 1500 litre capacity.
(a) Upto 4th story from G.L.
2
225
450
... More
Labour for punching hole in plastic water storage tank upto 50 mm dia.
6
19
114
... More
Supplying, fitting and fixing PVC pipes of approved make of Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads,fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. Payment for painting will be made seperately)
(a) For Exposed Work
PVC Pipes
(Dia)
(i) 15 mm
15
101
1515
... More
(ii) 20 mm
9
129
1161
... More
(iii) 25 mm
12
177
2124
... More
(iv) 32 mm
9
236
2124
... More
(v) 50 mm
15
384
5760
... More
Supplying, fitting and fixing Peet's valve fullway gunmetal standard pattern best quality of approved brand bearing I.S.I. marking with fittings (tested to 21 kg per sq. cm.).
(i) 15 mm dia
2
521
1042
... More
(i) 25 mm dia
3
912
2736
... More
(ii) 50 mm dia
2
2362
4724
... More
Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992
(A) (i) Single Socketed 3 Meter Length
(a) 110 mm
24
292
7008
... More
B) Fittings
i) Door Tee
(a) 110 mm
6
195
1170
... More
ii) Double Y with Door
(a) 110 mm
2
345
690
... More
iii) Cross Tee with Door
(a) 110 mm
6
239
1434
... More
iv) Vent Cowl
(a) 110 mm
3
33
99
... More
v) Pipe Clip
(a) 110 mm
10
21
210
... More
vi) Bend 87.5º
(a) 110 mm
4
120
480
... More
vii) Solvent Cement 250 ML
2
103
206
... More
Labour for fitting and fixing U.P.V.C. pipes for above ground work including cost of jointing materials etc. fitting and fixing all necessary specials, cutting pipes, cutting holes in walls or R.C. floor where necessary and mending good all damages excluding the cost of masonry or concrete work, if necessary, but including the cost and fitting and fixing holder bat clamps (any floor) or for underground work including cutting trenches upto 1.5 metre and refilling the same complete as per direction of the Engineer-in-charge. (Payment will be made on centre line measurement of
the total pipeline including specials.
A)Above ground
i) 110 mm dia.
24
58
1392
... More
Cleaning silt of inspection pit.
5
154
770
... More
Removing chokage of H.C.I. or S.W. pipe with split bamboo.
(a) Underground
75
11
825
... More
20 MT load bearing capacity round manhole cover provided with two lifter hooks fitted with matching frame of size Cover: 600 mm X 75 mm
Frame: 750 mm X 150 mm
opening: 525mm
Weight: 170 kg (approx)
3
3250
9750
... More
Cleaning rubbish, sludge, weeds scum, liquid earth, mud etc.etc.from road side masonary drain/ hume pipe drain/ culvert etc. by mathor labour after removing concrete.Slab/manhole cover etc.without damaging the same and refixing the same properly after cleaning as necessary and removing the sludge etc.etc.by using iron pans,buckets including all labour, tools & plants including removing the spoils in dry condition and disposing the same by truck beyond the road side in conformity with municipal/corporation rules for such disposal including loading into truck and cleaning the road side in all respects as per direction of the Engineer
in-Charge.
18
289
5202
... More
Add GST @ 18% on Total amount over item No. 1 to 26
401533
-
72275.94
... More
Add Labour Welfare Cess @ 1% on Total amount over item No. 1 to 27
473809
-
4738.09