Kolkata Metropolitan Development Authority Tender

... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Kolkata Metropolitan Development Authority - KMDA Tender

Works
Eprocure
Opening Date4 Feb 2025
Closing Date27 Feb 2025
Tender Amount₹ 1,13,97,730 
Notes
Download

Costs

Summary

08/se(prog)/sd/kmda Of 2024-2025

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof. a) up to 150 mm. thick

13.72

939

12879.32

... More
Supply of silver sand and stacking at site.

246.6

571

140808.6

... More
Supplying, fitting and fixing in position reinforced cement polymer concrete manhole /gully pit cover with matching frame.As per I.S- 12592(M.D) (ii) 25 MT load bearing capacity round manhole cover provided with two lifter hooks fitted with matching frame of size Cover: 680 mm X 90 mm Frame: 800 mm X 165 mm opening: 500mm Weight: 196 kg (approx)

254

3382

859028

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and up to roof of ground floor/up to 4 m . (i) Tor steel/Mild Steel (JSW/JSPL/SHYAM/SEMB/BMASL/ELECTROSTEEL/SSL)

10.55

54413

573957.5

... More
Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars. (a) In ground floor including roof.

209.94

1956

410642.64

... More
Cleaning rubbish, sludge, weeds scum, liquid earth, mud etc. from box drain/ covered nikashi etc. by mathor labour after removing concrete slab / manhole cover etc. without damaging the same and refixing the same properly after cleaning as necessary and removing the sludge etc. by using iron pans, buckets including all labour, tools & plants including expulsion of impure / inflammable / asphyxiating gases from the drains etc. and removing the spoils in dry condition and disposing the same by truck beyond the area of Municipal Corporation / Municipality / Notified Area Authority / Industrial Township Authority etc. for such disposal including the cost of loading, unloading, transportation and making arrangement of necessary land for disposal, spreading and leveling as necessary etc. and cleaning the road side in all respects, complete as per direction of the Engineer- in-Charge. (Land for disposal to be arranged by the contractor). (Payment will be made on the basis of actual stack measurment of spoils in dry condition at roadside) For Day :

7344

806

5919264

... More
Removal of rubbish, earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge

237.37

166

39403.75

... More
GST @ 18 % on Sl No 1 TO 17

1

1721422

1721422.55

... More
Hire and labour charges for shuttering with centering and necessary staging up to 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (up to roof of ground floor). for panel room slab (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.

629.76

334

210339.84

... More
Dismantling all types of masonary excepting cement concrete, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof.

13.72

447

6131.05

... More
Bailing out water including all leads and lifts and including making arrangement for disposal.

1936

23

44528

... More
Hire and labour charges for shuttering with centering and necessary staging up to 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (up to roof of ground floor). (f) 25 mm to 30 mm shuttering without staging in foundation.

556.4

209

116287.6

... More
Labour for Filling empty cement gunny bags/polythene bag( capacity 50 kg) with all kinds of earth (wet or dry) including sewing (as done in case of cement bags, tying with knob after filling will not be accepted) and stacking in position within 150 m. with all lifts excluding the cost of earth (volume of earth filled Polybags should be considered as 0.028 cum)

8220

7

57540

... More
Dumping of earth/sand filled polybags inclusive of all leads and lift.

8220

3

24660

... More
Brick work with 1st class bricks in cement mortar (1:4). (a) In foundation and plinth

55.26

5491

303468.03

... More
Cess @ 1 % On Sl No 1 to 18

1

112848

112848.81



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.