Irrigation And Waterways Department Tender
... More
The Irrigation And Waterways Department has issued a formal invitation for competitive bids for Strengthening Of Sherpur Exzamindary Embankment For A Length Of 2 Km Along With Protection Of 150 M On The Upstream Of Lakshmijal In Block Ps Kushmandi District Dakshin Dinajpur in South Dinajpur, West Bengal, with an estimated contract value of Rs. 1,37,04,952. The bid opening date for this tender is 05-07-2019 and the last date for bid submission is 29-07-2019. Interested bidders for Irrigation And Waterways Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Irrigation And Waterways Department Tender
Opening Date5 Jul 2019
Closing Date29 Jul 2019
Tender Amount₹ 1,37,04,952
Costs
EMD
₹ 2,74,099Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_IWD_231113_1Bid Award Id
ViewTender No
WBIW/SE/NIC-I/NIT-06e/2019-20Tender Authority
Irrigation And Waterways Department ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
d)For forth lead
93.33
-
113.12
... More
Making rectangular/Circular sausage cage with 10 SWG galvanized iron wire of 150mm. x 150 mm mesh wire netting with proper lapping of minimum 150 mm. including sewing the joints with 12 SWG G I wire and supply of all materials and equipments including placing the sausage cage in position, filling the same with boulder or lump agreegates complete as per direction of the Engineer-in-charge but excluding the cost of boulder / lump aggregates and its carriage upto site.(Cost is excluding the cost of end pieces )
-
-
-
... More
Supplying at site and laying in position UV stabilized polypropylene woven geotextile of 430 gsm as filter, as per specification, including cost of preparing the bed, placing the geotextile as per profile with at least 15cm lapping, wherever required and anchorage at top, sewing / welding the overlapped portion, storage and transportation by all means, complete as per direction of the Engineer-in-charge.
Note: 1. Payment to be made on measurement of finished surface without lapping, but including anchoring length at top.2.Payment will be made subject to the result of 3rd Party Testing, to be done by the Engineer-in-charge department- -ally. Paragraphs 2.7.7, 2.7.9 and 2.7.10 under the Chapter of“Specif- -ication for Works” in the USoR shall be reproduced and included in the tender document as “Specif- -ication & Special Terms & Condi- -tions for Geotextile” in case of use of this item in the estimate.3. This particular item is to beusedin special cases, either incontinuatio--n of previous usage or after offer --ing adequate justification from techno -economical angles.
2334
-
265.83
... More
Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete
(capacity 50 kg).
52454
-
6.79
... More
Supply of Pakur variety stone boulders at site including cost of material, loading, carriage,unloading and including all incidental charges like Royalty,complete each weighing 25 Kg and above from Contractor selected quarry site to working site. (Royalty certificate in original from concerned authority are to be submitted along with the bill)
b) Pakur source (Each weighing 25 kg & above)
666.64
-
2454.42
... More
Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand
40
-
364.25
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary(ground floor). [Excluding cost of chipping over concrete surface] For gr. floor upto roof. a) 20 mm thick ii) With 1:4 Cement mortar
59
-
210.4
... More
Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge.
NB:- Volume of each earth/ sand filled bags should not be less than 0.028 m3. Size of Nylon crate is 1metre X 1metre X 1metre.
(a) Where boats are not necessary.
2672
-
436.64
... More
Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts.
52454
-
3.39
... More
a)For one lead
466.65
-
28.28
... More
ii) 0.90 metre x 0.60 metre nominal section
147
-
443.43
... More
Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags , (tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).
NB:- Volume of earth/ sand filled bags should not be less than 0.028 Cum/bag.
52454
-
6.79
... More
B) Beyond 2.00 km and upto 3.00 km
4610
-
297.51
... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant IS codes.
18.08
-
6269.2
... More
Labour charges for bouIder pitching on top and slope by placing required boulders (each weighing 20 Kg. and above within lead of 100 metres and all lifts) including filling the interstices with fragments as required, preparing sub-grade by cutting or filling the earth on slope upto 7.5 cm. depth, watering and ramming where necessary complete as per direction of the Engineer-in-charge.
a) Over Jhama Khoa / metal filter/ Geo-textile filter.
514
-
514.7
... More
Labour charges for stacking unloaded boulder / shingles to make them convenient for measurement as per direction of the Engineer-in-charge.
a) Boulder of size above 20 kg
666.64
-
72.4
... More
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc.
NOTE:Cement 0.152 cu.m per100 sq.m.
59
-
38.46
... More
iii) 0.60 metre x 0.45 metre nominal section
180
-
290.72
... More
Supplying Nylon cage netting 1 metre x 1 metre x 1 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete.
2672
-
132.35
... More
c)For third lead
163.33
-
84.84
... More
A) Beyond 500 metre and upto 1.00 km
10373
-
279.41
... More
Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. to be measured at mid length).
30253
-
32.8
... More
Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.)
3200
-
24.89
... More
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of,
NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. Note: The rate is inclusive of Royalty Charges @ Rs. 18.00/m³ and Compensation for earth for land owned/ arranged by the contractor@ Rs.25.00/m³. Royalty payment certificate in original from competent authority are to be produced along with the bill, otherwise amount due towards royalty charges @ Rs. 18.00/m³ will be deducted from the bill of work
-
-
-
... More
i) 3.00 M x 0.46 M nominal section
75
-
1045.23
... More
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(a) Depth of excavation not exceeding 1,500 mm.
8
-
13491.82
... More
B) Beyond 1.00 km and upto 2.00 km
8068
-
288.46
... More
b)For second lead
209.99
-
56.56
... More
Driving bamboo pins in standing or flowing water including scaffolding and driving appliances.
(a) Where boats are not necessary.
20168
-
11.31
... More
Supplying, fitting, fixing end pieces for rectangular / square / circular sausages at the ends, with 10 SWG / 8 SWG G I wire net of different mesh sizes tying & sewing the same maintaning a lap langth of 150 mm all around with 12 SWG G I wire complete, including the cost of supply of wire netting,fitting etc, complete as per direction of the Engineer - in -
charge.
b) Mesh size 125 mm x 125 mm with 10 SWG wire
432
-
121.04
... More
Extra rate for stacking unloadedboulder on private land (where Govt. land is not available) to make them convenient for measurement as per direction of the Engineer-in-charge (land to be arranged by the contractor at his own cost. Note :- This item is payable only when the Engineer-in-charge in his discretion is salisfied about the necessity.
666.64
-
9.05
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements