Irrigation And Waterways Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Irrigation And Waterways Department Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date16 Dec 2024
Closing DateCancelled
Tender Amount₹ 81,55,428
Costs
EMD
₹ 1,63,109Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_IWD_784623_1Tender No
WBIW/EE-II/CD/eNIT-30e/2024-25Tender Authority
Irrigation And Waterways Department ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Supplying, fitting and placing un-coated HYSD bar reinforcement in Sub- Structure including including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications and direction of Engineer-in-charge. ii) b. Tor Steel rods / HYSD bars I TMT bars.(SAIL/ TATA / RINL)(Fe 415/Fe 500/Fe 500D Conform to IS:1786).
6.98
72136
503296
... More
Furnishing and Placing Reinforced / Pre-stressed Cement concrete in Super-structure with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement and admixtures, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete as per drawing and technical specification including the cost of necessary form work and staging complete. as per drawing and technical specifications. a) Pakur Variety. B) RCC Grade M25 Height up to 5 m With Batching Plant, Transit Mixer and Concrete Pump For solid slab super - structure Cement used PPC /PSC/OPC 33
-
-
-
... More
Bridge Super structure ( deck , wheel guard ,Railing, approach slab , approach road )
60.93
7937
483626
... More
Wearing Course (Deck slab , approach slab)
11.27
7826
88200
... More
Supplying, fitting and placing un-coated HYSD bar reinforcement in Super- Structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications and direction of Engineer-in-charge. ii) b. Tor Steel rods / HYSD bars I TMT bars.(SAIL/ TATA / RINL)(Fe 415/Fe 500/Fe 500D Conform to IS:1786).
7.44
73230
544469
... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis ofmeasurement of finished quantity of work). (a) With earth obtained from excavation of foundation
68.64
9241
6343
... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.
a) Pakur Variety. Cement used PPC /PSC/OPC 33
32.76
6532
214020
... More
Precast cement concrete blocks or lining units as per designed section and specification, in nominal mix proportion 1:1.5:3 (Corresponding to M-20 Grade) with well graded 20 mm down stone metal aggregate, including dressing, ramming, shuttering, finishing the surface by trowel without adding any additional cement and sand mortar, curing, transporting and laying the blocks or lining units at worksite in position, over sand cushion/filter layer, with cold (paper) joints between the adjacent units, having gap varying from 0 to 5mm as tolerance, with all leads and lifts, including supply and carriage of all materials complete. Stone Aggregate of Pakur or Rajmahal or broken stone of North Bengal varieties. Note: Provisions of the latest departmental manual for lining in Irrigation Canals are to be followed With Pakur variety stone chips
61.6
7696
474109
... More
Making filter with well graded 40 mm down ballasts and laying uniformly behind weep holes, below pitching on bed, side slopes including supply and carriage of all materials to site including preparing bed with earthwork up to 30 cm depth, where necessary and compacting with wooden malllet after laying to achieve designed section as per direction of the Engineer- in - Charge (measurements will be on finished work / in stack after deducting necessary void.)
(a) Jhama ballast
33.88
2590
87782
... More
Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.
Note: Diameter of pile to be measured at a distance of 1.5m from the thicker end.
(iii) 15 cm av. Diameter.
6780.6
258
1753599
... More
Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. 1) Payment to be made on the length driven into the ground. Diameter to be measured at 1.5m. from the thicker end.
2) For string staging under specific instruction of Engineer-in-charge or for driving from pontoon or boats, the rate will be enhanced by ` 4.00 per meter.
(iii) 15 cm av. Diameter
6733.68
129
874772
... More
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
775.08
28
22167
... More
Drainage Spouts in Superstructure including providing drip mouldings and also including supplying, fitting and fixing approved type of materials complete as per drawing and Technical specification vide clause no. 2705 of MoRT & H’s Specification for Road & Bridge Works.
12
933
11198
... More
Supplying and spreading granular base in foundation trenches using Bricks bats and fine sand ( Grading Zone III as per IS: 383-1970) in 3:2 protection complete as per drawing and Technical specification.
50.69
2162
109639
... More
Epoxy bonding of new concrete to old concrete.
107.07
616
65972
... More
R.C. Guard post Supplying fitting and fixing R.C. guard post 1.37m long with C.C. 1:2:4 with graded stone chips of 13.2mm down casting , curing complete including cost of providing 4nos.of 12mm dia. rod of length 1.54m as main reinforcement and 6 nos. of round shaped 8mm dia rods used as binders; the placing of the first binder should be at 75mm below the top finished surface and the other 5 nos of binders should be placed at 245mm c/c ; the guard post is of octagonal section with inscribed circle of dia 24cm at the base tapering to corresponding dimensions of 16cm at the top including two coats of painting with best quality synthetic enamel paint of approved make and grade to form 6 nos. horizontal alternate bands in white/tannery yellow and black to 90 cm length standing up above ground after mending good damages if any during striking off shuttering, making hole in ground of 47cm depth and 30cm. minimum dia, fixing the guard posts in the same holes and repacking the earth properly so as to keep the guard posts standing properly erect in correct position true to line and length including carriage of R. C. Guard Post with due care to the site including loading into the truck and unloading at site complete in all respect
42
831
34939
... More
Bailing or Pumping out of water from foundation trenches. This item should be executed on the specific direction of the Engineer-in-charges when he is satisfied in his absolute discretion, that this has not been necessitated due to any fault on the part of the contractor. (Payment, if permitted, will be made on the quantity of water calculated on the basis of initial and final water calculated on the basis of initial and final water level measured before starting and completion of each days work which necessitates a bailing / pumping of water from the trench. The final level of water to be measured, will depend on the level at which the day's work will be taken up. The rate includes any seepage water that may percolate in thetrench during pumping.)
4752
2488
118253
... More
Supply of PVC pipes & fittings Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I).
(A) PVC Pipes.
(Dia).150 mm
48.2
1692
81572
... More
Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC.
In Ground Floor:-
(b) Two Coats
105.6
5375
5676
... More
Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer.
In Ground floor (Two Coat).
c) Super Protective 100% Acrylic Emulsion.
105.6
115
12207
... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specifications Clause 202 for Rural Roads of MORD. (I) By Manual Mean
c) Reinforced Cement Concrete
159.67
1204
192388
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a) upto 3 m depth (i) With pumping out water including shoring as required.
297.54
147
43970
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.
80
399
31940
... More
Strip Seal Expansion Joint Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 80mm, complete as per approved drawings and standard specifications to be installed by the manufacturer / supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.
9.1
11918
108454
... More
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of E) Beyond 4.00 km and upto 5.00 km, NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. Note: For compensation of earth for land owned and arranged by contractor add 25.00 per Cum extra over rate of E/W for land woned /arranaged by the Department. Royalty charge on earth @ 29.00 Per Cum and cesses charges @ 5.30/ cum (ie Rs 15 per 100 cft ) as per Govt. notification, which will be paid on production of necessary document in support of payment made towards royalties & cesses.
412.83
371
153160
... More
Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete
(capacity 50 kg).
14744
7
105420
... More
Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engineer-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/bag
14744
8
122965
... More
Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site. (a) Width of thinner end above 10 cm. and less than 15 cm.
(i) Jhaw / Eucalyptus.
880
123
109076
... More
Taking out Jhaw / Eucalyptus piles from river bed or from elsewhere including carrying, stacking materials in the nearest stack yard. (b) Above 17.5 cm. and up to 25 cm. diameter
3896.2
16
65495
... More
Dumping in position earth / sand filled gunny / poly bags (capacity 50kg) within a lead of 30 metre inclusive of all lifts.
14744
3
52784
... More
Removing earth/sand filled poly bags/gunny bags from the channel bed/slope and initially depositing the same near channel bank at a place as directed by the Engineer-in Charge for measurement of Bag & then disposing off the same at a distance not less than 150 metre from the channel site.
14007
7
100150