Housing Department Tender
... More
The Housing Department has issued a formal invitation for competitive bids for Wbhousing/ae/kssd-ii/e-nit-03 Of 2025-26 in Kolkata, West Bengal, with an estimated contract value of Rs. 1,59,190. The bid opening date for this tender is 20-05-2025 and the last date for bid submission is 04-06-2025. Interested bidders for Housing Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Housing Department Tender
Civil And Construction
Eprocure
Opening Date20 May 2025
Closing Date4 Jun 2025
Tender Amount₹ 1,59,190
Costs
EMD
₹ 3,184Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Wbhousing/ae/kssd-ii/e-nit-03 Of 2025-26
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_HSD_849176_3Tender No
WBHOUSING/AE/KSSD-II/e-NIT-03 OF 2025-26Tender Authority
Housing Department ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
6.48
119
-
... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
4.5
361
-
... More
Supplying & laying Double Wall Corrugated (with external annular corrugation and smooth internal walls) High Density Polyethelene Pipes conforming to IS 16098 (Part II):2013 having Stiffness Class of SN 8 with Ring Stiffness not less than 8.00 KN/Sqm. and Impact Resistance TIR value not more than 10% including necessary jointing materials for nonpressure underground Drainage, Sewerage & Cross drainage application.
(i) 150 mm internal dia.
16
420
-
... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work).
(a) With earth obtained from excavation of foundation.
6.48
77
-
... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground flooras per relevant IS codes.
(a) Pakur Variety.
1.407
5261
-
... More
Construction of septic tank of different capacities as per approved drawing with 1st class brick work in cement mortar(1:4) including 560 mm dia. R.C.C. manhole cover (heavy type)of approved make supplied, fitted and fixed in the 100 mm. thick R.C.C. (1:1.5:3) top slab with necessary fittings, 20 mm thick cement plaster (4:1) with neat cement finish to the internal surfaces and 15 mm thick cement plaster (4:1) to outside wall upto 200 mm below G.L., floor finished with 25 mm thick grey artificial stone over 100 mm. thick R.C.C. (1:1.5:3) bottom slab including supplying,fitting and fixing all necessary specials, fittings, S.W. tees, C.I. foot rest etc. including excavating earth in all sorts of soil, shoring, bailing out and pumping out water as necessary,ramming,dressing the bed and refilling the sides of the tank with earth,removing spoils, filling up the chamber with clear water, removing foreign materials from the chamber and including constructing attached inspection pit as per approved drawing and connecting all necessary pipes,joints etc. with internal plaster work and artificial stone flooring is to be done with admixture of water proofing compound @ 0.5% by weight of cement with all costs of labour and materials. Note:- (i) Finished level of Septic Tank should be 400 mm. from Ground Level. (ii) Height of 50 mm. Ventilation pipe &Mosquito proof mesh, should be follwed as per IS:2470,Part- I.Payment will be made separetly on the basis of actual height based on relevant I.S.Code.
(iv) For 50 users.
A) With Pakur variety. (SAIL/TATA/RINL)
1
97053
-
... More
Constructing Inspection pit of inside measurement 600mm X 600mm X upto 600mm (depth) with 250 mm thick 1st. class brick work in cement mortar(1:4) on all sides, bottom of the pit consisting of 100 mm thick cement concrete (1:3:6) with stone chips over a layer of jhama brick flat soling, 15 mm thick (1:4) cement plaster to inside walls and out-side walls upto G.L. and 20 mm.thick (1:4) plaster to bottom of the pit, providing necessary invert with cement concrete (1:3:6) with stone chips as per direction, neat cement finishing to entire internal surfaces, top of the pit covered with 100 mm thick R.C.C. slab (1:1.5:3) with stone chips and necessary reinforcements upto 1% and shuttering including 6 mm thick cement plaster (1:4) in all external surfaces of the slab and one 560 mm dia. R.C.C. manhole cover of approved make supplied, fitted and fixed in the slab with necessary fittings, necessary earthwork in excavation in all sorts of soil, filling sides of the pit with earth and removing spoils after work complete in all respect with all costs of labour and materials.
i) With Pakur variety. (SAIL/TATA/RINL)
2
7124
-
... More
Sub Total
-
-
-
... More
GST 18%
1
-
-
... More
CESS 1%
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements