Hooghly River Bridge Commissioners Tender
... More
The HRBC has issued a formal invitation for competitive bids for the Hooghly River Bridge Commissioners project, for Repair, Replacement And Maintenance Of Gap Slab Of Up Carriageway Of Joint No Kv4, Kv5, Kv8 And Kv9 Of Kolkata Viaduct Of Vidyasagar Setu in Kolkata, West Bengal, with an estimated contract value of Rs. 17,21,114. The bid opening date for this tender is 10-01-2025 and the last date for bid submission is 24-01-2025. Interested bidders for Hooghly River Bridge Commissioners tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Hooghly River Bridge Commissioners - HRBC Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date10 Jan 2025
Closing Date24 Jan 2025
Tender Amount₹ 17,21,114
Costs
EMD
₹ 34,500Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_HRBC_797872_1Bid Award Id
ViewTender No
HRBC/JPM(W)/SR/10/24-25Tender Authority
Hooghly River Bridge Commissioners ViewPurchaser Address
-Website
http://https://hrbc.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Loading, unloading & transporting precast fabricated slab and placing them in proper position etc. complete as per direction of EIC.
48
1940
93135.84
... More
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. III) For built up sections / srtuctural members of specified sections weighing not less than 22.5 Kg./m
3.49
75266
262678.34
... More
(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (b) On steel or other metal surface : With super gloss (hi-gloss) - (iv) Two coats (with any shade except white)
268.6
79
21219.4
... More
Portable Barricade in Construction Zone: Installation of a steel portable barricade with horizontal rail 300mm wide, 2.5 m in length fitted on a 'A' frame made with 45 x 45 x 5 mm angle iron section, 1.5 m in height, horizontal rail painted (2 coats) with yellow and white stripes, 150 mm in width at an angle of 450, 'A' frame painted with 2 coats of yellow paint, complete as per IRC:SP:55-2001.
16
2547
40755.2
... More
Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed
within a lead of 75 m. including stacking of steel bars.
(a) In ground floor including roof.
14.4
1956
28166.4
... More
Positioning of a smart flagman with a yellow vest and a yellow cap and a red flag 600 x 600 mm securely fastened to a staff 1 m in length for guiding the traffic .
32
437
14003.2
... More
Repairing of damaged portion of Pedestal by high early strength solvant free epoxy grout etc. complete as per direction of EIC.
1584
286
454227.84
... More
Painting with ready mixed red lead paint of approved make and brand : (a) One coat
268.6
31
8326.6
... More
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the
compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into
truck and cleaning the site in all respect as per direction of Engineer in charge
14.4
166
2390.4
... More
Mastic Asphalt:
Providing and laying Mastic asphalt wearing course with paving grade bitumen meeting the requirements given in table 500-29 using approved coarse aggregate, fine aggregate, filler material and bitumen, prepared by using Mastic cooker including cost and carriage of all ingredients, cost of heating aggregates and binder, mixing in specified proportions conforming to approved Job Mix Formula and laid to required level and slope after cleaning the surface, compacting, sealing the construction joints and surface finishing conforming to specifications including providing antiskid surface with bitumen pre-coated fine-grained hard stone chipping of 13.2 mm nominal size at the rate of 0.005cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed into surface when the temperature of surfaces not less than 100°C, protruding 1 mm to 4 mm over mastic surface, including the hire charges of all tools and plants and machinery, pay of operators, cost of fuel and lubricants and all other incidental charges and quality control all complete as per Clause 516 of Specifications for Road & Bridge Works of MoRT&H(5th Revision). - (i) 50mm thickness
57.6
516
29757.89
... More
Supplying and filling the gaps by PolySulphide sealant etc. all complete asper direction of E.I.C.
96
2375
228058.56
... More
Picking up and removing old bituminous layer or sand sealing coat from old black topped surface and cleaning the exposed surface by scraping and stacking the material as directed.
76.8
22
1735.68
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) - (c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work
24
369
8856
... More
Supplying, fitting and fixing in position true to line and level Elastomeric bearing conforming to IRC: 83(Part-II) Section IX and Clause 2005 of MoRT&H specifications complete including all accessories as per drawing and Technical Specifications.
192000
1
192000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements