The GTA has issued a formal invitation for competitive bids for the Gorkhaland Territorial Administration project, for Construction Of Crematorium At Sansad No Iv Chongtong Gram Panchayat 101475068 in Darjeeling, West Bengal, with an estimated contract value of Rs. 2,99,985. The bid opening date for this tender is 26-12-2024 and the last date for bid submission is 02-01-2025. Interested bidders for Gorkhaland Territorial Administration tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Gorkhaland Territorial Administration - GTA Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date26 Dec 2024
Closing Date2 Jan 2025
Tender Amount₹ 2,99,985
Costs
EMD
₹ 6,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_GTA_790632_6Bid Award Id
ViewTender No
NIetNo.02/CGP /15FC/2024-25Tender Authority
Gorkhaland Territorial Administration ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel II. Other than SAIL/ TATA/RINL @ 0.8% (155.596x0.8%x7.85)
0.65
77113
50123.58
... More
Cost of stone boulder 150 mm size delivered ans stacked at site.
6.26
1526
9555.26
... More
GST 18%
1
45281
45281.95
... More
LABOUR CESS 1%
1
2968
2968.48
... More
Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth.
41.76
50
2088
... More
Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floorWith N.B. Variety stone metal.(a) 1:3:6
2.98
5971
17794.18
... More
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length,fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section,consumables such as electrodes, gas and hire charge of all tools andplants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc
0.12
89485
10738.22
... More
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm
37.37
119
4457.12
... More
Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any(i) (1:3:6) proportion
13
3877
50403.08