Gorkhaland Territorial Administration Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Gorkhaland Territorial Administration - GTA Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date18 Jan 2025
Closing Date25 Jan 2025
Tender Amount₹ 2,49,806
Costs
EMD
₹ 4,996Document Cost
₹ 1,250Tender Fee
Refer Documents
Summary
Construction Of Drinking Water Supply At Ramitey Dhotrey
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_GTA_784362_8Bid Award Id
ViewTender No
Niet02/LGP-II/2024-25Tender Authority
Gorkhaland Territorial Administration ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface]. (ii) With 1:4 cement mortar.(a) 20 mm.thick plaster.
33.94
247
8389.97
... More
1% Labour Cess
1
2473
2473.32
... More
Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m.
33.94
40
1384.75
... More
(II) Cement concrete with 30 mm. down graded shingles excluding shuttering.N.B. VarietyIn ground floor . (a) 1:3:6 proportion.
0.67
5529
3704.83
... More
(Z) Compact Compact Ball Valve with SS Handle ForCPVC/ UPVC Fittings.(As per ASTM D 2467, Schedule 80)
15
351
5274
... More
Supplying, fitting and fixing gunmetal wheel valve of approved brand and make tested to 21 kg sq.cm. (for water lines only). 25mm
1
933
933.6
... More
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor). (a) 25 mm. to 30 mm. thick wooden shuttering as per decision & direction of the Engineer-in-charge.
33.94
400
13603.15
... More
Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1.500 mm.
3.49
119
416.25
... More
Supply of High Density Poly-ethylene Pipe conforming to IS-4984-1985 (Dia)[PE-63]. 10 Kg/Sq/Cm.(Dia) Working Presssure). 25 mm.
1678
52
88598.4
... More
Labour for fitting and fixing high density poly-ethylene pipes or P.V.C. pipes for above ground work including costs of jointing materials, paints etc.fitting and fixing all necessary specials, cutting pipes, making threads, cutting holes in walls of R.C. floor where necessary and mending goods all damages excluding the cost of masonry or concrete work, if necessary ,but including the cost and fitting and fixing holder bat clamps(any floor) or for underground work including cutting trenches upto 1.5 metre and refilling the same complete as per direction of the Engineer-in-charge.(Payment will be made on center line measurment of the total pipeline including specials.)25mm
1678
33
56380.8
... More
18% GST
1
37728
37728.65
... More
Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming.
6.71
50
335.5
... More
Cost of stone boulder 150 mm size delivered ans stacked at site.
1.01
1526
1541.66
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements