Eastern Railway Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Eastern Railway - ER Tender

Works
Civil And Construction
Excavation
Ireps
Opening Date14 Jan 2025
Closing Soon5 Feb 2025
Tender Amount₹ 6,19,31,217.67 
Notes
Download

Costs

Summary

Howrah Division: Tsr(p) - 27.449 Tkm In Location Bly - Skg Dn-1 18.984 - 21 = 2.016 Km, Dn-1 22 - 23 = 1 Km, Dn-1 24.250 - 27 = 2.750 Km, Dn-1 29 - 33 = 4 Km, Dn-1 34.500 - 37 = 2.500 Km, Up-1 22 - 27 = 5 Km, Up-1 31.145 - 32 = 0.855 Km, Up-1 32.582 - 33.165 = 0.583 Km, Up-1 33.305 - 37 = 3.695 Km , Kan - Snt Dn 58 - 62.050 = 4.050 Km, Up 52 - 53 = 1 Km , Tsr(p)-17 Km By Contractor's Own Pqrs Portals (2 Nos.) And Gantry & 10.449 Km By Pqrs/manual.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Boxing and profiling of ballast as per procedure prescribed in latest edition of IRPWM 4 including cess dressing on both sides of track. The work will include removing excess ballast from track and putting the same in crib and shoulder by leading to a maximum of 50m including crossing of track, deweeding on ballast section etc and as directed by Engineer-In charge.

27450

31

858361.5

... More
Unloading of ballast from Railway's Hopper Wagons, quantity distribution as per pre- 5 defined site requirement, clearing infringements/jammed ballast, distributing the unloaded ballast uniformly over the track, profiling and boxing following all prescribed safety norms. Under Traffic Block Conditions:

36000

62

2247120

... More
25mm gap 'in-situ' welding during traffic block using Railway's welding portion and finishing of weld to meet the prescribed tolerances and pass all stipulated tests with all required labour, materials, consumables, tools, equipments etc. to complete the work in all respect as per IR's "Manual for Fusion Welding of Rails by Alumino - Thermic Process" with latest correction slips, including marking of welded joint, painting weld collar with anticorrosive paint, restoration of track 6 near weld joint to original position and fixing of joggled fish plate at new weld, to be removed after passing of weld in USFD test as directed by Engineer in charge. Note: 1. Welding portion and related accessories as per Annexure - I shall be supplied by Railways. All other items required shall be supplied by the Contractor. 2. Welding shall be carried out only by trained welder having valid competency certificate. 3. Hydraulic Weld trimmer shall be used for chipping and profile Grinder for finishing. 4. Required nos. of Joggled fish plates shall be supplied by Railway at nearest P. Way Stores and the same shall be returned at nearest P. Way Store or at other location as per direction of Engineer-in-Charge after release from track.

-

-

636921

... More
First or Second Through Packing of track of all sleeper density including giving a 7 general lift, as desired to eliminate sag after Deep Screening work, lifting of track, lowering of track and major realignment of curves and formation rehabilitation as per procedure prescribed in latest edition of IRPWM. Note: General lift is normally 25 mm and isolated lift may be up to 50 mm. For PSC Sleeper Track with Sleeper Density of 1660

5500

163

900350

... More
Pulling of welded rail panels to create a specified gap under traffic block, including opening of fittings & fastenings and re-fixing them on track after pulling of rail and creating standard gap for welding. For Rail panel more than 40m length

54900

29

1636020

... More
De-stressing of LWR/CWR track of any density under traffic line block with contractor's labours, tools, equipments and consumables inclusive of all lead & lift. Activities include cutting of LWR/CWR into convenient panels of specified length, removal of ERCs, liners, greasing of ERCs and liner contact area, lifting rails and keeping them on rollers provided at every 15 sleepers, working out 9 elongation of rail ends depending on prevailing site conditions, pulling rails with the help of Hydraulic Tensor to achieve the desired elongation, cutting rails, as required, removing rollers and placing rail in position, re-fixing ERCs & liners and adjustment of gap at SEJs : Note: (1) Welding of rail joints will be paid separately. (2) Rail cutting and Hole drilling shall be paid separately. (3) Opening and closing of LC if required will be paid separately. (4) As per procedure prescribed in latest edition of IRPWM & CE's Circulars for destressing of LWR/CWR, if any

-

-

1180377.5

... More
PQRS: Pre Block activity: Removing of the existing ballast from crib portion of the full 10 length of existing PSC sleeper and further up to the bottom of sleepers to accommodate new sleeper and dumping the ballast so removed on the shoulders/cess with contractor own labour, tools and plants etc, complete with all lead and lift and as directed by the Engineer-in-charge at site including crossing of track wherever necessary.

27450

38

1057099.5

... More
PQRS: Post Block activity, Pulling back the left over ballast from shoulders/cess in to 11 track and dumping in cribs and shoulders, regulating and boxing with available ballast to facilitate surfacing of track during lifting with contractors own labour, tools etc, complete and lead & lift as directed by the Engineer-in-charge at site including crossing of track wherever necessary.

27450

25

709582.5

... More
"CSM, Duomatic and 3X Sleeper Tamping Machines - Carrying out pre-tamping, during tamping and post-tamping work for tamping track with all types of rails, sleepers & sleeper density by various Track Tamping machines, like CSM,DUO/3X Machines whichinclude :(1) Re-adjustment of ballast, heaping-up of ballast, filling-up of cavities in tamping zone by picking ballast from stacks / shoulders / crib of adjoining track up to lead of 50 m to ensure effectivepacking;(2) Clearing of ballast on sleepers to make them visible to operator,(3) Clearing of ballast over rail foot to facilitate holding of rail by rollers of TTRM;(4) Digging, screening and replenishment of ballastat mud pumping / rounded 12 ballast in sleeper crib location;(5) Tightening of loose fittings immediately before & after tamping;(6) Replacement of broken / missing fittings supplied by Railway;(7) Correcting displaced sleepers to position along with squaring;(8) Resetting of worked-out / fallen fittings; (9) Removing and re-fixing joggled fish plates & wooden blocks, wherever necessary;(10) Manual consolidation of ballast in crib /shoulders;(11) Removing and refixing of traction bonds during the block in electrified sections(12) Dressing of ballastNote:1. Tamping blocks are not identical & it may be given at any time either during day or night.2. Stages of payment a) 30% of the rate will be paid on completion of pre tamping attention, b) Balance 70% of the rate will be paid on completion of post tamping.3. Recovery at the rate of twice the above applicable rate will be effected in case contractor fails to carry out pre/during/post operation.4.Payment shall be made only once in irrespective of numbers of TTRM packing round and after restoration of normal speed and restoration of complete ballast profile. "

-

-

645848.5

... More
Quick cutting with abrasive rail cutter of all types of rail sections including wear 15 resistant, head hardened rails up to 110 UTS, with contractors tools & plants, equipment, consumable with all lead & lift etc. complete as directed by Engineer in-charge. Abrasive Rail Cutter will be as per RDSO Specification No. TM/SM/1 (Rev. 01 of 2012) with latest status of RDSO; Rail Cutting Wheel Abrasive Disc will be as per RDSO Specification No.TM/SM/2 (Rev. 01 of 2020)

-

-

308333.5

... More
Drilling holes of 16 mm to 32 mm dia. with Rail Drilling machine including chamfering 16 with appropriate chamfering tools in all types of rail section with contractor's tools & plants, equipment, consumable with all lead & lift etc. complete, as directed by Engineer in-charge. Rail Drilling Machine will be as per RDSO Specification No. TM/SM/3, dated 24.04.1991

-

-

225141

... More
Loading, leading and unloading of 52Kg / 60Kg rail up to 13 metre length by Railway's Rail Dolly / Dip Lorry to the nominated location under traffic with line protection in case road carriage is not possible with different lead with a lift up to 5 metre during block period.

-

-

1132693.5

... More
Unloading of all type of rails of length 130 metre and beyond from end unloading rake 18 and keep the panels in head-up position at specified distance from centre of track clear from any infringement.. Note: Contractor has to keep Oxygen and Acetylene gas with cutter as standby during the period of work. During period of traffic block

100

34

3463

... More
Loading, leading and unloading of all types of P.Way fittings and all other 19 miscellaneous material except Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: Lead shall be the shortest motorable road length between the points of loading and unloading.

-

-

226548

... More
Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: 1. Lead shall be the shortest motorable road length between the points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items

-

-

389746

... More
Unloading of 52kg / 60kg PSC line and special sleepers up to 2.75 metre length in Depot / Station / Mid-section between stations in neat manner for Railway usage from departmental 21 material train (DMT) or contractor's / Railway's Truck/Trailer with crane or any other means including crossing of one track and lead up to 250 metre & lift up to 5 metre with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied

-

-

2455950

... More
Collection, segregation and stacking of various scattered P.Way materials at 22 nominated stacking location with serviceable and un-serviceable ones separately within a lead up to 500 metre and lift up to 5 metre including crossing of track(s) wherever necessary as directed by Engineer-in-Charge

-

-

1098655

... More
Opening of level crossing up to required width from centre line of track for replacement of sleepers by digging of pucca road surface up to bottom of sleeper, removing of ballast, muck etc., 23 screening of ballast & stacking the same near level crossing and disposing of all debris, replacing the required sleeper duly packing the sleeper to make fit for normal traffic and closing of LC surface with screened ballast to original level by proper ramming and consolidation to smooth motarable surface as directed by engineer in-charge.

140

436

61164.6

... More
Fabrication including cutting, bending/machining and fixing of check rails of all rail sections over PSC Sleepers as per Railway's approved drawings & specifications for level crossings / trolley paths/inspection lines in yards duly cutting rail flanges, wherever required to correct alignment 24 and level, drilling of holes with machine in check rails and fixing to Running rail and sleepers with all Railway's fittings, e.g. rail screws / grip expansion bolts, brackets, packing pieces, bolts, washers etc including grinding of brackets if required, fixing of Railway's wooden blocks at flare ends duly cutting and plaining, crossing of tracks and as directed by the engineer in-charge Note: 1. Drilling of holes in PSC Sleeper and fixing of dowels shall be paid under relevant item. 2. Required P.Way materials will be supplied at SSE/P.Way stores.

140

1219

170713.2

... More
Painting of running rails and check rails of any rail section of level crossing with anti- corrosive paint on both sides of web, foot etc. including liner contact area (excluding bottom of foot) 25 and fishing plane with two coats of thickness of 100 microns each by bituminous black paint confirms to IS-9862 of reputed make including painting of liners, ERC surface preparation, i.e. cleaning with wire brush / sand paper as a complete job as per Para No 613 (2)(b)(iii) of Indian Railways Permanent Way Manual, as directed by Engineer in-Charge.

1500

55

83925

... More
Manufacturing, supplying and laying factory made CC block pavers for road surface of 26 level crossings to RDSO Drg. No. M.00003, manufactured using 20mm size graded hard stone aggregates of approved quality over a well compacted sand bedding 50 thick with all contractor's cement, labour, tools/plant and curing with all lead & lift as per specifications and as directed by Engineer in-charge. 120mm thick blocks of M-40 grade for heavy traffic.

500

1497

748545

... More
Manufacturing, fabricating and supplying retro-reflective Engineering Indicator boards, made of 2mm thick aluminium sheet or 3mm thick aluminium composite sheet, face to be fully covered with high intensity encapsulated type heat activated retro-reflective sheeting conforming to type-IV of ASTM-D4956-01 in yellow & black or other colour combination including subject matter, 27 message, symbols, borders etc. as approved by Engineer In-charge or as per IRPWM guidelines, pasted on substrate by an adhesive backing which shall be activated by applying heat and pressure conforming to class-2 of ASTM-D-4956-01 and fixing the same with suitable sized aluminium alloy rivets @ 20 cm c/c to back-support frame of M.S. angle iron of size 25mm x25mm x 3mmprovided all along the edges of board with theft resistant measures back side of board shall be with non-peelable weatherproof paint, consisting of one coat of zinc chromate primer and two coats of epoxy paint. Vertical post shall have black & white anti-corrosive paint or powder coating complete, as directed.

-

-

1172611.3

... More
"Manufacture and supply of Drill Twist, made of High Speed Steel (HSS) of various sizes of Addison / I.T. make or equivalent, as directed by the Engineer in-charge."

-

-

159284.6

... More
Supplying and spraying in specified proportion Weedicide Chemical, capable to kill entire weed on track / cess / embankment with all labour, material, tools & plants etc. complete job in 29 all respect. Scientific name of the chemical is Isopropylamine Salt of Glyphosate, in which active ingredient is Glyphosate (41%), colour is light amber to brownish, very low in toxicity and has favourable environmental characteristics. It will be ensured that no weed growth occurs up to six months period, otherwise re-spraying shall be done by the contractor free of cost.

100000

-

81000

... More
"Hiring of machinery for minor miscellaneous works for short duration including 30 operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site."

-

-

186477.5

... More
Manufacture and supply of Precast gradient Posts of size 1.65 x 0.60 x 0.075 m in RCC 1:2:4 mix, engraving letters and leading to work spot, fixing in position with CC 1:3:6 concrete duly 31 making pits of size as required, painting the post, writing the letters on both sides of posts in 2 coats with enamel paint of approved quality to the Railways drawings/IRPWM with contractor's materials, cement, steel, labour, tools, plant, with all lead and lifts etc., complete as per specifications and as directed by the Engineer-in-charge. Note: Excavation, Concrete and steel work will be paid under relevant items.

50

540

27046.5

... More
Gas cutting of rail of various sections with contractor's tools & plants, as directed by engineer in-charge : Rail section of 52Kg and above

3000

163

491070

... More
PQRS: During line block activity: Dismantling existing track, levelling disturbed anduneven surface of bed up to bottom of sleeper, Loading the released panels in to BFR with Railway's portal cranes, Placing new panels from BFRs on to track with Railway's portal crane, Linking of Track with all fittings, placing ballast as required in crib and shoulders, aligning and surfacing of track, attending track parameters and initial packing to track to allow traffic at restricted speed of 20 kmph with contractor's labour, tools etc, complete and lead & lift as directed by the Engineer-in-charge at site including crossing of track wherever necessary. Note: The PQRS cranes with fuel and operators will be provided by Railway.

1000

48

48990

... More
Laying of auxiliary track with all types of rails, already available on cess, fixing rails on wooden blocks / CST-9 pots at 2m interval, true to square, to required alignment & level, fixing with spikes / screws / keys, linking rails with fish plates, bolts & nuts to a gauge of 3400mm (with reference 40 to centre line of existing BG track), levelling both the rails to same plane as that of BG track over stone ballast by way of removing ballast from shoulders of existing track, providing one round of packing. Subsequently, dismantling auxiliary track after completion of PQRS work at site by way of removing wooden blocks / CST-9 pots and carrying same to next stretch / location, if required, where auxiliary track has to be laid and spreading the same at required locations and leaving rails there itself for carrying out TRR work later.

8500

52

444125

... More
"In PQRS work, through rail renewal of BG track on PSC sleepers of any density with all 41 types of rails / rail panels lying in auxiliary track or on cess for replacement of service rails including handling of rails by way of dragging, pairing etc. and leading released service rails to load into BFR / Lorry or to shift to next location including crossing of track with lead & lift and any other incidental works as required."

-

-

1107685

... More
Through Sleeper Renewal (TSR) with PSC sleepers involving removal existing sleepers of any type along with fittings from track, insertion of PSC sleepers lying along the cess / formation / 42 slope / toe within 5 metres height with all fittings to specified spacing, gauge and squareness, one round of through packing to make track fit for 20 kmph speed, dressing of ballast to standard profile, all in accordance with the latest provisions of IRPWM and stacking of all released material neatly at specified places within an average lead of 100 m as directed by Engineer in-charge.

-

-

987832

... More
Lubrication of ERCs and its liner contact area by removal of ERCs and Metal / GFN liners in rail panel, cleaning of rust / scale of ERC, Metal / GFN liners & SGCI insert by using wire brush, 43 scrapper / sand emery paper etc supply and application of graphite grease, as prescribed by Railway for under side of liners & corresponding area of rail foot & SGCI insert with ERCs and re-fixing the same as per procedure prescribed in latest edition of IRPWM with contractors grease and all other tools & plants complete and as directed. Note: Each ERC in this item shall constitute 1 ERC and its Liner Contact area.

15000

4

74550

... More
Pre, during & post tamping operations, for tamping of track on level crossing portion on all types of track structure and density, during traffic block, duly opening the road surface by digging up to the required width and up to 50mm below bottom of sleeper to facilitate tamping, 45 removing and refilling ballast, adjustment of deficient ballast if necessary by picking from adjoining track/shoulder/cribs, removing and refixing all inter locking gears interfering, removing and re-fixing of check rails and painting of running rail & check rail with coal tar emulsion, completing road surface to smooth motorable condition after tamping is over, including tightening of loose fittings, replacement of broken/missing fittings, correction of displaced sleepers to correct position and as directed by Engineer in charge.

-

-

83797

... More
Providing lighting arrangements with halogen lamps on and around machine during machine working in night time blocks, with contractor's generator, consumables, all necessary electrical fittings, operators etc. Note: 1. Lighting arrangement is to be provided as per advance 46 planning of Night Blocks and written communication. 2. In case lighting arrangement is made available but not used due to non-availability of block, payment @ 60% of the item rate shall be made. 3. In place of Halogen, LED lamps of equal lumen capacity may be used with the approval of Engineer -in-Charge. 4. If lighting arrangement fails during block, recovery shall be made twice the rate per day.

-

-

1618192

... More
Loading, leading and unloading of PSC Sleepers of 52Kg / 60Kg by Railway's Rail Dolly/ Dip Lorry to the nominated location under traffic in case road carriage is not possible for different leads and lift up to 5 metres.

-

-

1073273

... More
Dismantling and removing rail of all section & length from track, laid on any type & density of sleeper by removing fish plates, fastenings & fish bolts and other materials including stacking all released materials within an average distance of 500 metres as directed by Engineer in- charge. Note: 1.Cutting of rails shall be paid separately. 2.Work to be done under traffic block. For Through Rail Renewal work

-

-

48

... More
Insertion of rails of all types & length in track, laid on any type & density of sleeper to 49 the specified gauge under traffic block. Rates include fastening of rail with sleepers with standard set of fastenings and fixing of fish plates and bolts or, if required, providing gap for welding and stacking of released material without infringement within 250m as directed by Engineer-in-Charge. Note: Rail drilling and cutting to be paid separately. For Through Rail Renewal work

2000

55

110120

... More
Carrying out preparatory works for operation of Ballast Cleaning Machine (BCM) which 50 includes making trench in track for inserting cutter bar, supporting track on wooden block supplied by Railway, removal of ballast along with muck from shoulder which is out of reach of cutter chain and putting the same in cutting width or between rails. Rate includes all miscellaneous works, e.g. opening and re-fixing of joggled fish plates, OHE Bonds, dismantling & removing obstructions etc.

2000

18

37340

... More
Carrying out various works during operation of BCM, like filling up of ballast at deficient 51 location from locations where ballast is excess or from adjoining tracks, required initial packing, adjustment of PSC Sleepers, provision wooden blocks supplied by department and attending track parameters etc. complete so as to make track fit for 20 kmph speed.

2000

46

93240

... More
Removal of screened muck discharged by BCM, where muck disposal on side slope is 52 restricted due to platform, cutting, OHE mast etc. and disposing it beyond 5m from edge of cutting up to 3m deep or alternatively carting it up to 50m for disposing off beyond the end of cutting / platform and making up cess wherever low.

2000

35

70840

... More
Extra to item nos. from 154030 and 154040 for disposal of muck at a distance beyond 50m for every additional lead of 50 metres or part thereof up to 500 metres.

1000

3

3300

... More
Extra to item nos. from 154030 and 154040 for disposal of muck for additional lift of 1 metre or part thereof beyond 3 metre lift in case of disposal of muck from track in cutting.

1000

6

6880

... More
Removing the ballast from shoulders, left over after BCM working, screening the same 55 removing the muck and putting back the screened ballast into track, boxing the ballast to profile and using released muck for cess making or throwing away within 50m lead and 3m lift when not required for cess repairs and as directed by the Engineer-in-charge. Note: This item shall be used only when BRM is not available.

2000

24

49020

... More
Ballast equalisation & ballast profiling after completion of deep screening work by BCM and/or after unloading of ballast by DMT (Ballast Train), as directed by Site Engineer as per IRPWM 56 including heaping of ballast in tamping zone keeping rails & sleeper top free from ballast, spacing and squaring of sleeper, gauging, cleaning of muck, proper fixing of fastening, attention during each round of sleeper tamping in relation to pre & post working Note: Payment shall be made only once in irrespective of numbers of TTRM packing round and after restoration of normal speed and restoration of complete ballast profile and cess profile.

2000

43

87960

... More
Making cess in deep screened track by using screened muck discharged by BCM where 57 cess is low or cutting cess to required depth up to 4m from centre of track, where cess is high and disposing off extra muck beyond 5m from edge of cutting which are up to 3m deep or alternatively carting it up to 50m for disposing it off beyond cutting or platforms, so as to make cess as per standard profile including providing proper slope.

2000

39

78340

... More
Carrying out Through packing of sleepers to make track fit for 30 KM speed as per procedure stipulated in latest version of IRPWM, behind BCM including filling ballast when only lifting is carried out by BCM.

2000

101

202380

... More
Pulling the left over ballast to the shoulders and dumping excess ballast in the cribs 59 and shoulders including boxing/profiling as per IRPWM of track together with left over stretches at fixed structures/masts immediately after FRM work, leveling the muck for making up cess and side slopes including removing and re-fixing of traction bonds during line block with all contractors labour, tools, plant, all lead, lift, crossing of track etc. complete and as directed by the Engineer-in-charge.

2000

36

73620

... More
Pre, during, and post BCM works for deep screening of ballast in Points and crossings with all contractor's labour, tools and plants as required to carry out the work to the standards in specific time including crossing of tracks etc. complete and as directed by the Engineer - in - charge. I. Pre-BCM Operation : a) making trenches for insertion of cutter bars at various locations as per the directions of engineer in charge. i.e.., one trench ahead of one rail length from SRJ and second trench near sleeper No 62 ( 1in 12) etc., b) Filling up ballast up to sleeper level. c) Tightening of fittings/ plate screws, ERCs, Stud bolts, check rail bolts. II. During BCM Operation : a) Assistance to S&T Department : Opening of cables at approach of Points & Crossings, TLD Boxes/ removing of Point motor and refixing the same and covering cables after passing of BCM in block period with S&T Staff. b) Engineering : c) Removing of two long sleepers i.e.., sleeper No 3 & 4 and refixing the same in position during block after passage of BCM. d) Removing obstruction i.e.., S&T CC block duly digging with crow 60 bars and breaking with chisel/ hammer, cutting of rail pegs with gas. e) To remove, excess ballast on rail table for free movement of BCM and for packing purpose. f) Extension of cutter bar wherever required in assisting machine staff. g) Removing of cutter bar/ Chain links from the trenches after screening work by BCM. III . Post BCM Operation : a) Packing switch portion including Motor long sleeper i.e.., SRJ to heel joint to reset Point for train movement & initial packing of lead portion to allow train at 20KMPH and lifting the track in two stages (50mm to 75mm in each lift) wherever required for correcting the longitudinal surfacing b) Dumping of ballast in the deficient portion in crib, on main line turnout side for initial packing purpose. c) Boxing / Levelling of muck duly ensuring levelling of muck on cess side and lowering of cess to the deep screened depth and removing of muck in between the lines and leading up to 250mts. Note: 1. For technical reasons, some of the points and crossings cannot be deep screened either fully or partially by BCM, in which case, the left over length will be deep screening manually. 2. The length of points and crossings assembly for payment of this item should be taken from SRJ to longest concrete sleeper available just beyond heel of crossing along main line.

650

498

323817

... More
Drilling holes of specified size for bond holes with 7.2mm dia drill twist to correct spacing and location on 60kg/52kg rails on cess or under traffic block with contractor's tools and plant, equipment, consumable, labour etc complete as directed by the Engineer in charge at site.

1300

42

55393

... More
Overhauling of level crossing by digging out up to 50mm below sleeper, screening of shoulder & crib ballast, replacing unserviceable sleepers & fastenings as necessary, removal of check rails for examination of running rails and check rails, scrapping of rails and painting running rails and 62 check rails and all fixtures with two coats of coal tar emulsion, greasing of ERCs, MCI inserts and liners oiling all the bolts, correcting cross level, gauge, alignment, surfacing and packing etc., re-fixing check rails duly ensuring standard clearances, re-inserting screened ballast, making good deficient ballast with Railway's ballast from stacks / heaps/borrowing from adjacent length of adjoining track within 50m lead, ramming & levelling road surface and refixing concrete slabs/making motarable road surface as required excluding re surfacing with bitumen as directed by Engineer in-charge.

-

-

161402.5

... More
Replacement of any type of sleepers in track with PSC sleepers lying on cess or at 63 Bridge Approaches for casual renewal at isolated locations with all fittings complete to specified gauge & cross level with contractor's tools including packing and dressing of ballast, as directed by Engineer in-charge. Released materials shall be neatly stacked and handed over at specified location within an average lead of 250 m or near either side of Bridge approaches as directed.

-

-

89676.5

... More
Lubrication of fish plated rail joints under traffic, by using Grease Graphite Grade 'O' 64 (IS:408) and Black oil supplied by contractor, for all types of rail sections as per procedure laid down in latest version of IRPWM and as directed by Engineer In charge. Note: Release U/S bolt & nuts is to be deposited back. If any fish bolts is jammed it should be cut with chisel and hammer and replaced with fresh fish bolt supplied.

-

-

16771.5

... More
Opening and refixing of Joggled fish plates provided to weld joints/rail of any rail section under traffic to enable examination of weld/rail by departmental official nominated by Engineer In charge and lubrication of fishplates by applying departmental Grease graphite grade 'O' 65 (IS:408) to fishing planes and bolts by departmental black oil as per procedure laid down in latest version of IRPWM, including all tools required and as directed by Engineer-in-charge. Note: 1. Grease Graphite, black oil, fish bolts, K.Oil, wire brush, required for work shall be given by department and issued at concerned SSE/PW Stores. 2.Jammed fish bolts shall be cut using chisel and hammer and replaced with new bolt.

300

62

18723

... More
Removing seized ERC from SGCI inserts of existing track by using suitable approved chemicals and re-fixing after greasing of insert eye and ERC with Contractor's grease of specified 66 quality as per provisions of IRPWM, as directed by Engineer in-charge. Note: 1.List of Seized ERC alongwith location shall be prepared after inspection of SSE/P.Way and marked prior to execution of this item. 2. Due care shall be taken to avoid any damage to the sleeper 3.A penalty of 50% of the basic cost of new sleeper in nearest sleeper factory shall be levied on each, if SGCI insert is broken or sleeper gets cracked in the process.

650

56

36920

... More
Renewal of existing SEJ with improved SEJ with PSC sleepers under traffic block conditions as per approved drawing including fixing of special size bearing plate, rubber pad and other 67 sleeper / rail fittings, greasing to the fittings, leading rails, sleepers & fittings to site, leading and stacking of released materials within a lead of 250m, cutting of Rails, drilling of holes, fixing of related fittings, providing temporary connection with fishplates till welding of SEJ is done and sleepers shall be given initial packing to make track fit for 20KMPH speed. Note: (1) Rail cutting and hole drilling shall be paid separately. (2) One set comprise complete SEJ on both rails at SEJ.

3

10042

30127.8

... More
Replacing existing glued joint rail with cut rails or with glued joint rail or insertion of glued joint by cutting existing track under traffic condition by cutting rails, refixing with all rail sleeper 68 fastenings and providing required gaps for carrying out welding as an alternative to drilling holes or joining rails with fish plates duly drilling holes as required including stacking of released material and as directed by engineer in-charge. Note: (1) Drilling holes & rail cutting will be paid separately. (2) Transportation of materials to the site of work from supply points, if more than 250m, shall be paid separately.

100

2141

214174

... More
Anti-corrosive painting of rail outside track on rail bottom, web, foot and fishing plane 69 with two coats of thickness of 100 microns each by bituminous black paint confirms to IS-9862 of reputed make including surface preparation, as a complete job as per procedure prescribed in latest edition of IRPWM. For 60 Kg Rails

15000

65

978300

... More
Anti-corrosive painting of rail on running track of any sleeper density on web, foot etc. including liner contact area (excluding bottom of foot) and fishing plane as per requirement with two 70 coats of thickness of 100 microns each by bituminous black paint confirms to IS-9862 of reputed make including painting of liners, ERCs and including surface preparation, as a complete job as per procedure prescribed in latest edition of IRPWM Note: 60% of payment shall be made if painting on only gauge face side is done. For 60 Kg Rails

20000

89

1793800

... More
Third or subsequent Through Packing of track for all sleeper density including picking 71 of slacks, as required after second through packing, subsequent to Deep Screening work as per procedure prescribed in latest edition of IRPWM. This item can also be used after lifting/regrading/realignment works also. Note: General lift is normally 25 mm and isolated lift may be up to 50 mm. For PSC Sleeper Track with Sleeper Density of 1660

5500

125

692560

... More
Fixing check rails to running rails on level crossings with MS brackets, MS packing 72 plates, bolts & nuts, spring washers etc. including lubrication as per approved drawing & specifications, as directed. Rails, MS brackets, packing plates, bolts & nuts, spring washers will be supplied by Railways. Note: One set consists two check Rails.

7

5962

41736.1

... More
ROAD WORK // ROADS // Supplying and stacking at site. // 63 mm to 45 mm size stone aggregate

400

1624

604314

... More
ROAD WORK // ROADS // Laying, spreading and compacting stone aggregate of 2 specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road/vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density .

400

865

322077.6

... More
ROAD WORK // Providing and applying tack coat using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom. // With rapid setting bitumen emulsion // On bituminous surface @ 0.25kg/sqm

7000

7

51429

... More
ROAD WORK // Providing and applying tack coat using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom. // 4 cm thick bitumastic sheet with hot bitumen of approved quality, using stone chippings (60% with 12.5 mm nominal size and 40% with 10 mm nominal size) @ 2.60 cum per 100 sqm and coarse sand @ 2.60 cum per 100 sqm of road surface and with bitumen @ 56 kg/cum of stone chippings and @ 128 kg/cum of sand over a tack coat with hot straight run bitumen, including consolidation with road roller of 8 to 10 tonne etc. complete. (tack coat to be paid separately) : // With paving Asphalt grade VG - 10 heated and then mixed with solvent at the rate of 70 grams per kg of 4 asphalt

3000

427

1193422.5

... More
ROAD WORK // SEAL COAT // Providing and laying seal coat of premixed fine 5 aggregate ( passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG - 10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface, including rolling and finishing with road roller all complete.

3000

79

222781.5

... More
Unloading and loading of PSC sleeper from DMT with Contractor's own gantry, machinery, tools and plants with all lead lift etc at Base.

14110

17

241986.5

... More
Fabrication of Panels (With Contractor's Portal). This includes :- (a) Spreading of PSC sleeper at a spacing of 65 cm. centre to centre or instruction given by the site in charge. (b) Linking of 2 above spreaded PSC sleepers with 90R / 52Kg. service rails by providing elastic fastenings including fixing of GR Pads with concrete sleeper with adhesive like glue (glue well be supplied by contractors), Liners, Greasing of elastic rail clips, inserts by grease supplied by the Contractor conforming IS-408 grade. (NB: Here TRM denotes per TRM)

8500

25

220150

... More
Loading of fabricated panels into Railway wagons with Contractor's gantry machine, tools & plants. (NB: Here TRM denotes per TRM)

8500

50

433415

... More
Unloading released panels from BFR/BRH by Contractor's own gantry machine, labour, tools and plants. The Contractor shall provide any labour reqd. to remove any obstruction during unloading. (Note Here TRM denotes per TRM)

8500

48

410210

... More
a) Running track site:- Replacement of old sleepers and rails ( CTR/TSR) by dismantling existing track of all types of sleepers by making 13m loose rail panel (or any suitable length panel) with old sleepers & SH rail (for removing existing track) with wider base sleepers / revised wider base sleepers at density of 1660 sleepers per Km assembled with loose rail panel (or any suitable rail length panel of SH rail)in PQRS Depot and placing over ballast properly during traffic block after removing panels of old sleeper and SH rail of 13 m loose rail panel (or any suitable length panel) with the use of contractor's PQRS Machine by providing auxiliary track with gauge of 3400mm (either with the use of existing rail from existing track or with new rail over metal/ wooden sleepers, to be provided by Railway, 500 Nos./rail km on both rails) and providing fish plates for joining loose SH rail over wider base sleepers / revised wider base sleepers for continuity of track and maintaining track parameters as per Para 522 of IRPWM 2020 to keep the track fit for 30kmph. SH rail over new wider base sleepers / revised wider base sleepers to be replaced with new/earlier existing rail on running track (with replacement of rubber pad, liner & greased ERC and greasing of liner contract area. Grease to be used should be of servogem RR3 from Indian oil) as soon as loose rail length of track reaches 500m/750m (as per decision of Railway site engineer i.e. SSE/JE/ P Way). Loading of track panel( SH rail over old normal sleeper and tied with ERC) of approximately 13 m length over Railway wagons and unloading of track panels of the length of 13 m ( or any suitable length) and wider base sleeper / revised wider base sleeper will be done during traffic block. TRR with the rail of the length of 250 m to 500m which was removed initially for AT, will have to be done as soon as track of loose rail exceeds 500m length. The whole process will continue till completion of work. Auxiliary Track (AT) will have to be removed with advancement of TSR work as per direction of Railway (SSE/JE/P Way). b) PQRS Depot: - Track panel with SH rail of 13 m or any suitable length over wider base sleepers / revised wider base sleepers will be made with necessary fittings in PQRS Depot. Loading of these panels over Railway Wagons and unloading of released track panels( released from running track) consisting of all types of rails & sleepers from Railway wagon at PQRS depot using Contractor's own portal crane including dismantling and stacking each component of track properly at designated locations. Note: This item of Through sleeper renewal with wider base sleeper / revised wider base sleeper is a composite item and all activities as required will have to be done by the Contractor with his/her own PQRS Machine & other machines, tools and plants including all other resources as per requirement of the work ( in PQRS Depot and during traffic block in running track). Railway will provide wagons and locomotive free of cost for loading/unloading and transportation to/from PQRS Depot/ work site (running track) for loose rail panels with normal old sleepers and with wider base sleepers / revised wider base sleepers. Nothing extra will be paid except the rate as mentioned against the item. Railway will also provide metal/wooden sleepers required for AT, free of cost. Various activities which are involved in CTR work are elaborated in """"sequence of activities provided with tender schedule"""". (For Final product and Notes refer Annexure-A)"""

-

-

5

... More
Linking and laying new BG track for PQRS working in base depot with second hand 6 material on ST/wooden/CST-0/PRC sleepers with M+4 densities. It will include leading of material to 500 meter, spreading of rails and sleepers, fixing of fittings and fastenings to the entire satisfaction of Engineer in- charge.

500

316

158495

... More
Dismantling of old released short Panels consisting of all types of sleeper. Contractor's 7 labour will unfasten all types of sleepers from the rail and will stack the same with free lead of 100m as per direction of site in charge at BASE. The rate also includes (a) Extracting of seized Pandrol clips from released PSC sleepers by heating if any (b) digging up ballast mixed with any type of soil from CST-9 plats / steel sleeper. (Note: Here TRM denotes per TRM)

8500

51

440895

... More
Supplying men to assist PQRS portal & other works at PQRS base as directed by MIC & PWI/PQRS base. The rate should be included work of machine during day/night.

200

302

60440

... More
Post attention of newly laid PSC track. This includes squaring, spacing, gauging packing, aligning, boxing & dressing of ballast, complete in all respects. Per

-

-

9

... More
Supply of abrasive rail cutting (RDSO) specification no. TM/SM/1 of 2008

3

178708

536126.79

... More
Supply of Rail drilling machine(RDSO) specification no. TM/SM/3 of 1991

-

-

2

... More
Abrasive rail cutting Disc (wheel) 400x4X22.23 mm as per RDSO specification No. TM/SM/02 (Rev.01 of 2007).

330

785

259373.4

... More
GST @ 18 % on SCH-D items.

-

-

173146.15

... More
Add above 86.28%

-

-

220307.35

... More
GST @ 18%

-

-

85616.52



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.