Department Of Paschimanchal Unnayan Affairs Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Department Of Paschimanchal Unnayan Affairs - DPUA Tender

Works
Eprocure
Opening Date24 Jul 2018
Closing Date9 Aug 2018
Tender Amount₹ 71,61,476 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Construction of PCC road from Manikpara

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Extra for carriage of all kinds of earth by Mechanical Transport: (a) Carriage up to total lead of 1.0 km. 50 % of excavated earth

542.48

-

95

... More
Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base by consolidating laterite metal (63 mm to 45 mm) 100 mm thick

723.31

-

649.44

... More
Supplying and Laying Polythene sheet(150 gm/sqm) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.

4822.05

-

24

... More
Plain / Reinforced Cement Concrete in Open foundation with or without reinforcements, in any part of foundation of bridges / culverts with graded stone chips of appropriate nominal sizes, including screening and cleaning of coarse aggregates, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, cost of curing with water, including cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge, cost for quality control, sampling, testing etc. including cost of formwork but excluding reinforcement complete as per drawing and technical specifications. A. PCC Grade M25 with pakur variety stone chips

964.409

-

5510.77

... More
Supplying, spreading and consolidating Moorum to a depth of 75 mm at desired density and C.B.R. as per specification with power roller to proper gradient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants etc. For: Hard Shoulder Moorum toping

69.75

-

757.61

... More
Filler joint iv) Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6% bitumen by weight

787.92

-

20

... More
Retro -Reflectrorised traffic signs providing and fixing retro- reflectrories cautionary, mandatory and informtaory signs as per IRC-67 made of high intensity grade sheeting vide clause no.- 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel single iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade concrete 45 x 45 x 60 cm below the ground level as per approved drawing( ref. to MORT & H specification 801) iv) 80 mm x 60 mm rectangular for citizeninformation bord

2

-

5208

... More
0.500 MTR SPAN CROSS DRAIN= 02 NO

-

-

-

... More
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge a) upto 3 m depth (i) With pumping out water including shoring as required.

33.75

-

124

... More
Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand. Quality of sand is to be approved by the Engineer-in-charge.

3.75

-

649.44

... More
Supplying and Laying Polythene sheet(150 gm/sqm) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.

25

-

24

... More
Plain / Reinforced Cement Concrete in Open foundation with or without reinforcements, in any part of foundation of bridges / culverts with graded stone chips of appropriate nominal sizes, including screening and cleaning of coarse aggregates, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, cost of curing with water, including cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge, cost for quality control, sampling, testing etc. including cost of formwork but excluding reinforcement complete as per drawing and technical specifications. A. PCC Grade M20 I) Using concrete mixer with pakur variety stone chips

13.75

-

6083.77

... More
Supplying, fitting and placing HYSD bar reinforcement in Sub-structure including initialm straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications and direction of Engineer-in-charge.Use other than (SAIL/TATA/RINL)

0.294

-

57279.3

... More
Plain / Reinforced Cement Concrete in Substructure with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality, cement and water reducing admixtures, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete as per drawing and technical specification including the cost of necessary form work and staging complete as per drawing and technical specifications. D. RCC Grade M25 I) Using concrete mixer with pakur variety stone chips

3.75

-

6083.77

... More
Earthwork in filling in foundation trenches with goodearth in layers not exceeding 15cm. includingwatering and ramming layer by layer complete withearth obtained from excavation of foundation orfrom fresh excavation of land arranged byDepartment within a lead of 150 m.

6.75

-

92

... More
500 MTR SIDE DRAIN

-

-

-

... More
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge a) upto 3 m depth (i) With pumping out water including shoring as required.

425

-

124

... More
Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand. Quality of sand is to be approved by the Engineer-in-charge.

67.5

-

649.44

... More
Supplying and Laying Polythene sheet(150 gm/sqm) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.

450

-

24

... More
Plain / Reinforced Cement Concrete in Open foundation with or without reinforcements, in any part of foundation of bridges / culverts with graded stone chips of appropriate nominal sizes, including screening and cleaning of coarse aggregates, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, cost of curing with water, including cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge, cost for quality control, sampling, testing etc. including cost of formwork but excluding reinforcement complete as per drawing and technical specifications. A. PCC Grade M20 I) Using concrete mixer with pakur variety stone chips

135

-

6083.77

... More
Earthwork in filling in foundation trenches with goodearth in layers not exceeding 15cm. includingwatering and ramming layer by layer complete withearth obtained from excavation of foundation orfrom fresh excavation of land arranged by Department within a lead of 150 m.

85

-

92

... More
GST @12% (Twelve Percent)

0.12

-

7259335.24

... More
Labour Welfare Cess @ 1% (One Percent )

0.01

-

8130455.47



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.