The CMERI has issued a formal invitation for competitive bids for the Central Mechanical Engineering Research Institute project, for Annual Contract For The Supply And Installation Of Major Replacement Components For Air-conditioning Maintenance, Servicing Of Air Conditioner Indoor Units, And Installation/relocation Of Split-type Air Conditioners At The Institute Campus in Paschim Bardhaman, West Bengal, with an estimated contract value of Rs. 24,23,098. The bid opening date for this tender is 05-11-2026 and the last date for bid submission is 16-11-2026. Interested bidders for Central Mechanical Engineering Research Institute tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Central Mechanical Engineering Research Institute - CMERI Tender - WB Tender

Opening Date5 Nov 2026
Closing Date16 Nov 2026
Tender Amount₹ 24,23,098 
Notes
Download

Costs

Description

Annual Contract For The Supply And Installation Of Major Replacement Components For Air-conditioning Maintenance, Servicing Of Air Conditioner Indoor Units, And Installation/relocation Of Split-type Air Conditioners At The Institute Campus

Contact

Unlock the Tender details

GEM & Bid Advisory Services

Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

Unlock the Tender details
... More
Supply and refill R-32 refrigerant gas in Split Air Conditioner (A.C.) units, including all necessary servicing works such as leak detection, brazing and rectification of refrigerant leakage. The work shall also include replacement of defective components, wherever required, such as strainers, capillary tubes, valves, flare nuts (dead nuts), and other associated fittings. After completion of repairs and refrigerant charging, the system shall be thoroughly leak-tested and commissioned to ensure satisfactory operation. Complete in all respect and make it functional.The work shall carry a 3 (three) months warranty from the date of successful completion and the work as to be carried out as per Annexure –1.

70

-

-

... More
Supply and refill R-410 A refrigerant gas in Split Air Conditioner (A.C.) units, including all necessary servicing works such as leak detection, brazing and rectification of refrigerant leakage. The work shall also include replacement of defective components, wherever required, such as strainers, capillary tubes, valves, flare nuts (dead nuts), and other associated fittings. After completion of repairs and refrigerant charging, the system shall be thoroughly leak-tested and commissioned to ensure satisfactory operation. Complete in all respect and make it functional.The work shall carry a 3 (three) months warranty from the date of successful completion and the work as to be carried out as per Annexure –1.

30

-

-

... More
Supply, installation, testing, and commissioning of Split Air Conditioner Outdoor Unit Copper Condenser Coil of matching specifications as per the existing unit, including the required coil size, number of rows, and technical parameters based on the existing coil or approved sample. The work shall include removal of the damaged coil, supply and fixing of the new copper condenser coil, brazing, pressure testing, leak testing, commissioning, and all associated accessories, consumables. Complete in all respect and make it functional.The work shall carry a 3 (three) months warranty from the date of successful completion and the work as to be carried out as per Annexure –1.

6

-

-

... More
Supply, installation, testing, and commissioning of Split Air Conditioner Outdoor fan motor conforming to the existing technical specifications, approved model, or sample, as applicable.The fan motor supplied shall be compatible with the existing unit and shall meet the required technical standards. The work shall include dismantling and removal of the burnt-out/defective outdoor fan motor, supply and installation of a new outdoor fan motor, and provision of all necessary materials, accessories, fittings, consumables. Complete in all respect and make it functional. The work shall carry a 6 (six) months warranty from the date of successful completion and the work as to be carried out as per Annexure –1.

25

-

-

... More
Supply, installation, testing, and commissioning of Split Air Conditioner Indoor fan motor conforming to the existing technical specifications, approved model, or sample, as applicable.The fan motor supplied shall be compatible with the existing unit and shall meet the required technical standards. The work shall include dismantling and removal of the burnt-out/defective outdoor fan motor, supply and installation of a new outdoor fan motor, and provision of all necessary materials, accessories, fittings, consumables. Complete in all respect and make it functional. The work shall carry a 6 (six) months warranty from the date of successful completion and the work as to be carried out as per Annexure –1.

6

-

-

... More
Supply, installation, testing, and commissioning of a universal PCB with compatible remote control for Split Air Conditioner units, matching the technical requirements and or existing model / sample. The work shall include removal of the defective PCB, supply and fixing of the new universal PCB and commissioning to ensure satisfactory operation of the AC unit.Complete in all respect and make it functional. The work shall carry a 6 (six) months warranty from the date of successful completion and the work as to be carried out as per Annexure –1.

25

-

-

... More
"Repair, Installation, Testing and Commissioning of Existing Non-Inverter Split Air Conditioner Control PCB" The work including fault diagnosis, troubleshooting, repairing and replacing damaged electronic components, relays, capacitors, ICs, transformers, connectors, and other necessary spare parts.The work also includes reinstallation of the repaired PCB, reconnection of all electrical wiring and terminals. complete with testing and commissioning to ensure satisfactory operation of the air conditioning unit." Complete in all respect and make it functional. The work shall carry a 3 (three) months warranty from the date of successful completion and the work as to be carried out as per Annexure –1.

10

-

-

... More
"Repair, Installation, Testing and Commissioning of Existing Inverter Split Air Conditioner Control PCB (both indoor and outdoor unit)" The work including fault diagnosis, troubleshooting, repair, and replacement of defective electronic components such as relays, capacitors, ICs, transformers, connectors, sensors, and other necessary spare parts.The work also includes reinstallation of the repaired PCB, reconnection of all electrical wiring and terminals. complete with testing, commissioning, and restoration of the air conditioning system to satisfactory working condition."Complete in all respect and make it functional. the work as to be carried out as per Annexure –1.

10

-

-

... More
Supply and fixing of Split Air Conditioner (AC) outdoor unit fan blade, conforming to the existing technical specifications, size, model, and approved sample, as required. The work shall include removal of the damaged fan blade, supply of a new compatible fan blade, installation, testing, commissioning and provision of all necessary materials, accessories, fittings, consumables. Complete in all respect and make it functional. The work shall carry a 6 (six) months warranty from the date of successful completion and the work as to be carried out as per Annexure –1.

10

-

-

... More
Supply, laying, testing, and commissioning of branded refrigerant-grade copper piping for Split Air Conditioning Units, including both suction and liquid/discharge lines of required sizes (1/4"and 1/2") , complete with nitrile rubber insulation, flare nuts of matching sizes, fittings, supports/clamps, brazing, pressure testing, vacuuming, and wrapping with UV-resistant PVC/RAP tape.The work shall include all accessories, consumables, and necessary connections between indoor and outdoor units to make the system fully operational and the work as to be carried out as per Annexure –1.

400

-

-

... More
Supply, laying, testing, and commissioning of branded refrigerant-grade copper piping for Split Air Conditioning Units, including both suction and liquid/discharge lines of required sizes ( 3/8"and 5/8") , complete with nitrile rubber insulation, flare nuts of matching sizes, fittings, supports/clamps, brazing, pressure testing, vacuuming, and wrapping with UV-resistant PVC/RAP tape.The work shall include all accessories, consumables, and necessary connections between indoor and outdoor units to make the system fully operational and the work as to be carried out as per Annexure –1.

100

-

-

... More
Supply, laying, testing and commissioning of 3-core × 2.5 sq. mm PVC insulated, copper conductor electrical cable (Havells, Finolex or approved equivalent) for Split Air Conditioner units, including all accessories required for installation, complete in all respects and the work as to be carried out as per Annexure –1.

100

-

-

... More
"Supplying and fixing heavy-duty brackets for mounting all types of split AC outdoor units (capacity up to 4.0 ton) as per requirement , including all necessary fasteners, anchor bolts, supports, and accessories required for proper installation, complete in all respects and the work as to be carried out as per Annexure –1.

30

-

-

... More
Dismantling, Shifting, and Reinstallation of Split AC Indoor Unit. The work shall consist of dismantling of the existing Split Air Conditioner indoor unit and shifting the same from its current location to a new location as directed by the Engineer-in-Charge. The scope shall include all screws, accessories and careful dismantling, handling, transportation within the premises, lifting and shifting at all floors/heights as required, necessary civil works for fixing and installation, reconnection of all associated components, testing, commissioning, and making the unit fully functional.complete in all respects and the work as to be carried out as per Annexure –1.

20

-

-

... More
Dismantling, Shifting, and Reinstallation of Split AC Outdoor Unit. The work shall consist of dismantling of the existing Split Air Conditioner Outdoor unit and shifting the same from its current location to a new location as directed by the Engineer-in-Charge. The scope shall include all screws, accessories , fastenting bolts and careful dismantling, handling, transportation within the premises, lifting and shifting at all floors/heights as required, necessary civil works for fixing and installation, reconnection of all associated components, testing, commissioning, and making the unit fully functional.complete in all respects and the work as to be carried out as per Annexure –1.

20

-

-

... More
Dismantling, Shifting, and Reinstallation of Split AC Unit (both indoor and Outdoor). The work shall consist of dismantling of the existing Split Air Conditioner both indoor and outdoor unit and shifting the same from its current location to a new location as directed by the Engineer-in-Charge.The scope shall include all screws, accessories , fastenting bolts and careful dismantling, handling, transportation within the premises, lifting and shifting at all floors/heights as required, necessary civil works for fixing and installation, reconnection of all associated components, testing, commissioning, and making the unit fully functional.complete in all respects and the work as to be carried out as per Annexure –1.

30

-

-

... More
Fault diagnosis The work includes finding faults, repairing, and replacing damaged spare parts of split AC units that are installed on the building’s chajja, as directed by the concerned engineer.Complete in all respect and make it functional and the work as to be carried out as per Annexure –1.

50

-

-

... More
Supply nitrogen gas and carry out nitrogen flushing/purging of the Split AC system to remove non-condensable gases and contaminants from the refrigerant circuit. Perform all associated servicing, testing, and commissioning activities required to restore optimum cooling performance. Complete in all respect and make it functional and the work as to be carried out as per Annexure –1.

5

-

-

... More
Servicing and Cleaning of Honeybee Nest from AC Indoor Unit. The work shall include safe dismantling of the air-conditioner indoor unit from the outdoor unit after carrying out proper pump-down procedures. The contractor shall carefully remove and dispose of the honeybee nest formed inside the indoor unit without causing damage to any AC components.The scope shall include thorough cleaning of all affected parts of the indoor unit, including coils, blower, drain tray, casing, and other associated components, using approved cleaning agents, chemicals, and/or kerosene as required. The contractor shall inspect all electrical and mechanical components for any damage or obstruction caused by the bee nest and undertake necessary servicing to restore the unit to proper working condition. After completion of cleaning and servicing, the indoor unit shall be reinstalled and reconnected to the outdoor unit, ensuring proper refrigerant circuit integrity and leak-free operation. The contractor shall test and commission the air-conditioner and verify satisfactory performance, cooling efficiency, and normal operation. Complete in all respect and make it functional and the work as to be carried out as per Annexure –1.

10

-

-

... More
Servicing and Cleaning of the Evaporator Coil (Cooling Coil) of an Old Split AC Indoor Unit .The work shall include the complete servicing and cleaning of the indoor unit of a split air conditioner using a jet water pump. The contractor shall carefully remove the outer cover of the indoor unit and make all necessary arrangements for jet water servicing. The scope of work shall include thorough cleaning of the evaporator coil and blower (indoor unit runner) using a jet water pump. During the cleaning process, all electrical and electronic components, including the PCB, indoor fan motor, and outdoor fan motor, shall be adequately protected against water damage. After completion of the cleaning, the contractor shall refit the outer cover of the indoor unit, ensure proper assembly of all components.Complete in all respect and make it functional and the work as to be carried out as per Annexure – 1.

350

-

-



Evaluation Notes How It Works ?

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.