Bharat Sanchar Nigam Limited Tender

... More
The BSNL has issued a formal invitation for competitive bids for the Bharat Sanchar Nigam Limited project, for Pgm/nwp D/cfa/etender/tx/cr4/c-w/25-26 in Kolkata, West Bengal. The bid opening date for this tender is 28-05-2025 and the last date for bid submission is 18-06-2025. Interested bidders for Bharat Sanchar Nigam Limited tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.

Bharat Sanchar Nigam Limited - BSNL Tender

Services
Telecommunication Services
Eprocure
Opening Date28 May 2025
Closing Soon18 Jun 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Pgm/nwp D/cfa/etender/tx/cr4/c-w/25-26

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Optical Fiber Cable laying by trenchless technology i.e. micro tunneling, open trenching, etc along with associated works for restoration of critical routes
Optical Fiber Cable laying by trenchless technology i.e. micro tunneling, open trenching, etc along with associated works for restoration of critical routes
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Solid laying with cement concrete (1:2:4) as per instruction of the competent authority in case of low depth in plain,hard and rocky soil where depth is not possible including the cost of materials (ISI marked cement to be used).

20

2365

-

... More
Laying,jointing and levelling PLB HDPE pipe (50mm dia) in the excavated trench including pulling of standard Nylon rope (4mm dia) into the pipe line with sealing of the section ends by end caps as per specification. (Excluding the cost PLB HDPE pipe and including the supply of Nylon rope & std. socket as per specification for connecting the PLB HDPE pipes).N.B.: The item includes collection of PLB HDPE pipes from departmental store and transportation to the work site.

24863

10

-

... More
Pulling/Blowing of optical fibre cable as per laying standard using appropriate means as per specification through PLB HDPE/GI/ TEFLON/ DWC pipes.The rate should include digging / reinstatement of manholes / pits (required for pulling the OFC),replacement of Nylon ropes, cleaning PLB HDPE/GI/DWC pipelines if necessary and covering the cable by split PLB HDPE/GI/DWC pipes in the manhole / pits.This items will be applicable for leading in the optical fibre cable in the Telephone Exchange also.The items includes collection of optical fibre cable drums from Departmental store and tansportation to the work site.

28938

10

-

... More
Laying of optical fibre cable using appropriate means through existing DUCT (including pumping out of any accumulated water and cleaning of DUCT pipes if necessary).

400

10

-

... More
Providing and fixing precast RCC (1:2:4) (with 4 no. 4mm dia iron rods placed vertically) joint/route indicators per specification embedded 800 mm in earth at an interval of 200 mtr. Throughout the route as per direction of the executive officer of the site.The route indicator should be painted in "Yellow" and the joint indicator in "Red". The indicator should have "OFC/CTD" engraved on the top.

109

535

-

... More
Construction of brick wall type OFC joint chamber / hand hole of internal size 1.2MX1.2MX1M(depth)as per latest Engineering Instructions and construction practise available in tender document

23

23500

-

... More
Construction of brick wall type OFC joint chamber/hand hole of internal size lesser than above mentioned in sl.22 )as per latest Engineering Instructions and construction practise available in tender document(depth will be same as above)

14

16319

-

... More
Earthing of Joint Closer (For Armoured OFC): Supply and fixing of spike earth arrangement consist of one number of 25.0 mm or more dia. GI pipe of 275 cm or more length, Connecting the joint closer earthing point with Earth rod by soft copper wire, minimum 2.5 mm. diameters and fixing with nuts and bolts properly as per specification available in tender document. (Earth value should be <5 Ω)

9

3500

-

... More
Earthing of Termination Box (For Armoured OFC): Earthing with GI earth pipe 4.5 M long, 40 mm dia including accessories and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc (but without charcoal/coke and salt) as required as per specification available in tender document. . (Earth value should be <5Ω)

5

5368

-

... More
Cutting of brick wall for insertion of GI/PLP & restoration of the side of the hole including supply of necessary materials.

0.5

225

-

... More
Fixing of GI/PLB/DWC(store items) with iron clamp Horizontally through the wall at ground level. Clamp to be supplied by vendor(through outside wall of customer premises including scaffolding)

30

250

-

... More
GI/PLB/DWC (store spply)fixing with iron clamp including scaffolding charges - 1st to 5th floor. Clamp to be supplied by vendor

30

300

-

... More
Supply,fitting,fixing of PVC/ Teflon pipe on iron rack in side of eqpt.Room through which OFC is to be pulled for horizontal and vertical LI purposes.

10

60

-

... More
Raising of J/C by constructing brick wall and fixing existing angle frame and slab cover along with net cementing-1 to 8 inch(Considering the size of standard OFC chamber 1MX1M)

6

4070

-

... More
Raising of J/C by constructing brick wall and fixing existing angle frame and slab cover along with net cementing-9 to 12 inch(Considering the size of standard OFC chamber 1MX1M)

10

5000

-

... More
Cost of cleaning J/C, rearrangement of existing cable property,checking of each pipe, including lifting and disposing of materials from J/C by own transportation.

9

800

-

... More
Sloping down of J/C after brick working and fitting/fixing of angle frame and slab cover on brick wall of J/C-1 to 8 inch(Considering the size of standard OFC chamber 1MX1M)

3

3300

-

... More
Pit repairing- Pucca surface

6

2100

-

... More
ROUTE INDEX DIAGRAM-Supply of Route Index Diagram in Hard as well as Soft copy on CD for Capital work only upto 1 KM

7.61

150

-

... More
Videography of the Route for Capital work only

7.61

300

-

... More
Splicing of first 4F OFC including termination of pigtails in FDMS/ODF

3

800

-

... More
Additional splicing for each of the remaining 20F in 24F OFC including termination of pigtails in FDMS/ODF

60

60

-

... More
Splicing of first 4F OFC including termination of pigtails in FDMS/ODF

21

800

-

... More
Additional splicing for each of the remaining 44F in 48F OFC including termination of pigtails in FDMS/ODF

700

55

-

... More
splicing per ribbon including termination of pigtails in FDMS/ODF

8

500

-

... More
In case of single fibre splicing of 48F ribbon type/96F ribbon type including termination of pigtails in FDMS/ODF .

8

800

-

... More
Additional splicing for each of the remaining fibres in 48F ribbon type including termination of pigtails in FDMS/ODF .

352

55

-

... More
Supply & installation of 33 mm dia taflon pipe (thickness 4mm)

70

25

-

... More
Supply and installation/fixing of New Duct Manhole Slab (RCC)

41

725

-

... More
Dismantling/deloading of existing FDF rack,transportation, rack lifting,positioning at the specified location , reinstallation of the rack with fitiing materials and re-arrangement of pigtails in FDF after splicing. Fitting materials to be supplied by vendor.

1

3500

-

... More
Duct manhole cleaning - Lifting of mud/soil/garbage from duct

3

1000

-

... More
Duct manhole cleaning - mud/soil/garbage disposal from manhole

9

2000

-

... More
Project Management Cost (PMC) for Open Trench method of OFC laying upto 1000m length. Includes liaisoning works and getting permission from other departments like PWD, KMC, Municipality, Police Station, water supply, CESC, WBSEDCL, PHE etc and liaisoning to sort out objections from local people..

6348

30

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.