Bengal Gas Company Limited Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Bengal Gas Company Limited - BGCL Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date19 Jul 2024
Closing Date5 Sep 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Laying Testing And Commissioning Of Underground Steel Pipeline Along With Associated Works For Nadia North 24 Parganas Kolkata And South 24 Parganas Districts Part A And Hooghly And Howrah Districts Part B

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Surveying of route and detours required at the time of execution including marking the same in topographical sheet, preparation of construction drawings showing survey details, and submit same to Owner for review / approval.

-

-

-

... More
Staking and installation of construction markers, clearing, fencing, grubbing, full filling all the requirements of various statutory/ environment authorities to the entire satisfaction of concerned authorities. During construction, methodology of laying of steel pipeline (i.e. open cut/ HDD/ moling without casing) shall be decided as per requirement of various Government statutory/ environmental/ local authorities and the same methodology of steel laying shall be binding to the contractor for Authority's entire satisfaction. Grading / clearing of work area and shifting of all obstruction within the ROU/ Pipeline route alignment corridor viz. electrical lines/ poles, telephone line / poles, foreign pipeline, etc.

-

-

-

... More
Barricading the pipeline construction area prior to execution of the works as per drawings enclosed with tender document and to the entire satisfaction of Owner / Engineer-in-charge.

-

-

-

... More
Carrying out repairs of pipe defects/ replacement in case of irreparable defects and repairs of defects of pipe coating not attributable to Owner including defects/ damages occurring during transportation / handling.

-

-

-

... More
Stringing of line pipes along pipeline trench / ROU / Pipeline route alignment corridor provided on sand/soft soil bags including all supplies, manpower & machinary etc.

-

-

-

... More
Checking, cleaning, aligning, bending, cutting and bevelling (as required) of pipes for welding and field adjustments including pipe fittings, welding, carrying out non-destructive testing of welds as required including 100% radiography by X-ray either by internal source or external source based on site conditions/front availability and in this regard decision of EIC shall be final and binding to the contractor [In case placement/installation of X-ray equipment is not feasible, in that case Gamma ray may be permitted as per decision of Engineer In-Charge(EIC) based on site conditions] and providing all requisite equipment, labour, supervision, materials, films, consumables, all facilities and personnel to process, develop, examine and interpret radiographs and other tests as required, carrying out repairs of weld joints found defective by Engineer-in-Charge, carrying out re-radiography and other tests as required on repaired joints.

-

-

-

... More
Carrying out installation of carrier line pipe across all minor crossing viz. road, cart track, pathway, water bodies etc. in all type of underground strata (including soft/hard soil and all type of rock ) at designated depth by open cut / HDD / moling which falls under proposed pipeline route (except at major crossing by HDD method / Cased crossing as mentioned elsewhere in the SOR item).Type of crossing (Minor or major) shall be decided as per site requirement and decision of EIC/BGCL shall be final in this regard and binding to the contractor

-

-

-

... More
Carrying out installation of carrier line pipe in the casing pipe at cased crossing (excluding installation of casing pipes which is covered separately).

-

-

-

... More
Coating of field weld joints, long radius bends (R=3D), elbows, buried fittings and valves etc. including supply of coating materials etc. (i.e. heat shrinkable sleeves and high build epoxy etc.) as per PJS & Technical Specification compatible with 3 layer PE coating material of the line pipe.

-

-

-

... More
All tieing-in, including the tie-in(s) of the pipeline with the adjacent sections of pipeline including cutting of test header, rebevelling as required, radiography and other NDT examination, joint coating as per specification.

-

-

-

... More
Final clean-up & restoration of ROU/ Pipeline route alignment corridor or area disturbed by contractor including obtaining NOC from respective land owner and statutory authorities during their construction activities for laying of pipeline works and disposal of debris and returning all surplus material to designated disposal areas / storage yard as and backfilling of trench/ pits/ ditches and compaction of the same as per satisfaction of Owner and / Or as directed by Engineer–in–charge. However, restoration of top disturbed surface if required, i.e Asphalt / Bituminous / Concrete / Metal / Red stone roads / Pavement / Pavor block / Tiled / Brick lined including compaction of soil, to original condition as per requirement and to the entire satisfaction of EIC and / or concerned Owners having jurisdiction and shall be paid as seprate items mention else where in the SOR.

-

-

-

... More
Restoration of land, facilities and boundary wall etc. and associated facilities dismantled/ damaged by the Contractor during construction;

-

-

-

... More
Supply of LR Bend (R=3D) of material equivalent to pipe material grade (API 5L Grade X-42/46/52/56/60) and of all size, all thickness, all angle etc. suitable to connect / fit with intended steel pipeline to be laid, as per specification and their complete Installation with steel pipeline network of all size & thickness as per specification wherever required depending on site condition.

-

-

-

... More
Protective coating of 600 micron thick two component (applied with the help of minimum three coats or as per the supplier's guidelines) liquid epoxy including supply of materials duly approved by Owner for all piping valves, fittings, structural steels etc. for buried installation and inside the valve pit as approved by the Engineer-in-charge.

-

-

-

... More
Carrying out all temporary, ancillary, auxiliary works and all incidental works required to make the pipeline ready for pre-commissioning;

-

-

-

... More
Hook-up work with existing pipelines.

-

-

-

... More
Carrying out Cleaning, Gauging (if feasible as per site condition or as per pipeline alignment & geometry), Pigging, final hydrotesting alongwith mainline works, dewatering, swabbing, drying and tie-in with pipeline at either banks or other adjacent pipeline section maintaining minimum pipeline cover as per specifications/latest codes/permissions (whichever is more stringent) and all other associated works required as per specifications, codes, approved drawings, calculations, methods and as directed by Engineer-in-charge and provision of contract document, getting NOC from all concerned authority of the facillities. However payment for Gauging, swabbing and drying shall be made as seprate items mentioned elsewhere in the SOR.

-

-

-

... More
Obtaining work permits/ NOC from various statutory authorities having jurisdiction, before and after execution of the work, and complying with all stipulation/ conditions/ recommendation of the said authorities;

-

-

-

... More
Preparation of as-built drawings, pipe-book and other records as specified in the specifications. SOR shall be read in conjuction with job specific requirements, specifications, standards, drawings and other provision of contract document. All above works of line pipe laying and installation for buried pipeline as per following details:

-

-

-

... More
For Open cut method:

-

-

-

... More
Trenching to all depths and to a width to accomodate the carrier pipeline during lowering by excavation in all types of underground strata ( including soils, pebbels, cobbles, boulders, structures and all type of rockey strata) including raking up of built-up surface / Hard surface of any type including metal road/ surface, concrete road/ surface, bituminous road/ surface, asphalt road/ surface etc. which is breakable in pieces, shall be carried out either by breaking, chiselling or otherwise cutting etc manually or using pneumatic machine. Further raking up of built-up surface of any type includes tiled surface, paver block, brick lined etc.which is breakable/removable in pieces shall be carried out mannualy without using pneumatic machine. All tiles/ slabs/ paver block/ curb stones etc.removed during excavation shall be placed properly and storing excavated soil, reusable materials at designated area as directed by Engineer in charge and to a width to accommodate the pipeline as per the relevant standard/ specification etc. [The cover of pipeline shall be in between 1.0 meter to 1.5 meters depending upon site conditions and shall be measured from top of pipeline coating to the top of undisturbed surface of the soil or as per SCC/ relevant code, whichever is higher]. Dewatering of trenches if required as per site condition. Padding & Backfilling of the trench after lowering the pipeline. [However, restotaion of built-up surfaces shall be paid as separate items mentioned else where in the SOR].

-

-

-

... More
Installation / lowering the pipeline in restricted ROU and across all minor crossing viz. road, cart track, pathway, water bodies etc. (for which ROU width limit of the crossings are less than or equal to 15 meters) in all types of underground strata (including soils, pebbels, cobbles, boulders, structures and all type of rockey strata) which falls under proposed pipeline route are to be crossed by Open Cut Method, in trench to required depth as per PJS, Technical Specification & drawings and/or as per latest relevant Codes & Standards, Statutory Regulation, requirement of the local authority and providing required padding over and around the pipeline with sand/graded material approved by Engineer-In-Charge (in rocky areas / other area where pebbels, cobbles, boulders, structures, stone/metal chips available in soil strata ) including padding around pipeline with suitable soil duly approved by EIC including supply of padding material, backfilling and its compaction to the satisfaction of concerned authorities with excavated earth / borrowed select soil including supply of borrowed select local soil duly approved by EIC before backfilling and make ready for restoration to be done by Owner / concerned authorities. However, supply of borrowed select local soil shall be paid as separate items mentioned else where in the SOR. [Incase of any conflict in requirement among PJS, Technical Specification, tender documents, drawings, latest relevant Codes & Standards, Statutory Regulation, requirement of the local authority, etc., the most stringent requirement shall govern, however decision of EIC in this regard shall be final and binding to the contractor.]

-

-

-

... More
Supply of warning mat for all sizes of pipeline in multiple lot based on site condition/requirement and its installation over the entire length of the pipeline laid in open-cut trench as per specification. Warning mat for pipeline shall be supplied as per the technical specification enclosed in the bid document. The material of warning mat shall be of high density polyethylene and non-biodegradable type. It shall have non-toxic and anti-rodent properties.

-

-

-

... More
Supply and installation of slope breakers, wherever required or, as directed by Onwer / Engineer–in–charge.

-

-

-

... More
Crossing of all-foreign pipeline / HT line / cable / any other utilities etc. with necessary concrete / PVC protection including coordination with all agencies and obtaining NOC.

-

-

-

... More
Installation of bank protection & associated works along with supply of all types of backfill materials etc. duly approved by EIC for pipeline trench and banks falls under minor water body crossing as per technical specification & Std. Drg., wherever required or, as directed by Owner / EIC.

-

-

-

... More
Training and diversions of streams in steep slope area, wherever required.

-

-

-

... More
For HDD method

-

-

-

... More
Complete work of laying of pipeline in restricted ROU and across all minor crossing viz. road, cart track, pathway, water bodies etc. (for which ROU width limit of the crossings are less than or equal to 15 meters) in all types of underground strata ( including soils, pebbels, cobbles, boulders, structures and all type of rockey strata) which falls under proposed pipeline route are to be crossed by the HDD method including "Receiving and taking over" owner supplied 3LPE coated line pipes from owner's designated place to issue/dump site(s) and transportation to contractor's stock yard/work site including all handling, loading, uploading, aligning etc. supply of all contractor supplied material including consumables, manpower, equipment, other resources to work site(s) and aquiring the required land for storage. Execution of, but not limited to, following works in accordance with specifications and instruction of engineer-in-charge and as per all provision of Contract Document

-

-

-

... More
Pre-construction survey, necessary cover required over the carrier pipeline, based on site visit, collection of data (if required) from concerned Authority including design and detail engineering and making of drawings for getting their approval from concerned Authority/Engineer-in-charge, getting work permit/NOC for utlities crossings (if any) encounterd prior to start the execution of work.

-

-

-

... More
Drilling to required depth from top of ground (min 2.0 mtrs.) including maintenance of drill hole in all types of underground strata ( including soils, pebbels, cobbles, boulders, structures and all type of rockey strata , all depth to accommodate the pipeline at all conditions encountered by approved HDD methods for providing minimum cover specified in code/specification or the actual depth as decided by concerned authority, whichever is more.

-

-

-

... More
Carrying out cleaning, gauging (if applicable), water filling, pre-hydrotesting of complete pipeline string in one section/ test sections as approved by EIC/RCM to specified test pressures (i.e.1.5 times of Design pressure) for 4 hours hold period; providing all equipment, pumps, test headers, fittings, pressure & temperature instruments etc., and services, supervision, labour, consumables, water, air, etc. as required; detection of leaks, if any occurred during pre-hydrotesting, attributable to Contractor and rectification of defects, re-testing after rectification with due approval of Owner, successful completion of pre-hydrotesting including dewatering of pipeline to acceptance criteria defined in the specifications. Supply of required quantity of corrosion inhibitor, if required for pre-testing of designated sections complete as per specification and approved by Engineer–in–charge (EIC)/ RCM. However payment for the same shall be made as per the seprate item mentioned elsewhere in the SOR.

-

-

-

... More
Laying of the pipeline by the approved HDD method in all type of underground strata (including soft/hard soil and all type of rock ) including pipeline string preparation, welding, testing, 100% radiography by X-ray, welding repair and retest, coating of field joints with special type Dirax Heat Shrink Sleeve or equivalent (including supply of coating material) and repair of pipeline coating with special PERP-80 repair patch or equivalent material (including supply of repair patch) as per specification, pre-hydrotest of complete strings made for laying etc.

-

-

-

... More
Backfilling of the Pits/ Ditches/ Trench including restoration and clean-up of area, disposal of drilling fluid & waste etc. to the satisfaction of Engineer-in-charge and/or as directed by concerned Authority.

-

-

-

... More
For Manual/ Machine moling technique (without Casing) in all type of underground strata (including soft/hard soil and all type of rock )

-

-

-

... More
Survey of under ground utilities, execution of the work as per specification, including excavation of pits moling with the hole size not exceeding 20% of the pipe dia, jointing and insertion of carrier pipe, testing & commissioning and restoration of the pits to original condition, submission of As-Built Graph as per specifications and the instruction of Engineer-in-charge.

-

-

-

... More
Specified dia Thk (mm) Material Coating Type Length of each pipe (mm) NB

-

-

-

... More
For all types of underground strata ( including soils, pebbels, cobbles, boulders, structures and all type of rockey strata)

-

-

-

... More
For all types of soil including pebbels, cobbles, boulders, structures etc.

-

-

-

... More
406.4 7.1 API 5L Gr. X-56 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

6000

-

-

... More
323.9 6.4 API 5L Gr. X-56 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

18000

-

-

... More
273 6.4 API 5L Gr. X-56 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

10000

-

-

... More
219.1 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

11000

-

-

... More
168.3 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

3000

-

-

... More
114.3 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

22000

-

-

... More
For all types of Rocky Starta

-

-

-

... More
406.4 7.1 API 5L Gr. X-56 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

300

-

-

... More
323.9 6.4 API 5L Gr. X-56 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

900

-

-

... More
273 6.4 API 5L Gr. X-56 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

500

-

-

... More
219.1 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

550

-

-

... More
168.3 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

150

-

-

... More
114.3 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

1100

-

-

... More
This item shall include laying/ installation of complete underground steel grid main pipeline system including laying/ installation of underground steel branch pipeline, bends (R=3D) and associated works. The above item rates of complete laying/ installation of underground steel grid main & branch pipeline system shall include installation of underground/ aboveground tap-off for distribution pipelines, valves of all type/size/ratings, flow tees/barred tees, insulating joints, flanges & fittings, accessories etc. and including fabrication, NDT, Testing & Installation of SVs (all types), tie-in of valve assembly including radiography of tie-in joints as per Schematic Layout Drawings and technical Specification alongwith aboveground approach pipeline upto Insulating Joint (including installation of aboveground / underground insulating joint) for various stations as required to complete the pipeline system. However, payment for the fabrication, installation, NDT, other testing of Sectionliazing valve stations (Without Future Tap-off/With Future Tap-off) shall be made through separate items mentioned elsewhere in the SOR. Further, supply & installation of those items mentioned above, for which separate SOR item are not mentioned elsewhere in SOR, the same shall be deemed to be included in the above SOR items rates.

-

-

-

... More
Supply of all valves, flanges, fittings, assorted pipes, barred tees & insulating Joints, etc. shall be paid by separate item mentioned elsewhere in SOR.

-

-

-

... More
In above item, backfilling of pipeline trench by borrowed select soil duly approved by Owner / EIC shall be paid by separate item mentioned elsewhere in the SOR.

-

-

-

... More
Contractor shall not perform any pipeline related activities along the ROU/ Pipeline route alignment corridor without specified barricading/ permission of EIC/ RCM as per Std. Drg. and other safety measures.

-

-

-

... More
The quantities mentioned above are tentative and may increase or decrease depending upon the site conditions/requirements of Geographical Area (GA). The quantity indicated against each item is to be carried out at multiple and/or different locations within the GA and shall be decided by EIC as per requirement at site.

-

-

-

... More
A large part of the proposed pipeline route is along MDR/ Asphalt Road / concrete roads (RCC/ PCC) etc. However, in case of non-availability of said ROU, the pipeline route may change and this may also require a new tap-off point at suitable location on Pipeline. This may cause increase / decrease in SOR quantities.

-

-

-

... More
The above items rate shall be applicable for underground laying / installation of Coated Line Pipes either by open cut method or by HDD method or by moling (without casing) method or in any combination depending on site conditions and laying / installation methodology shall be proposed & submitted by the contractor for approval of EIC. Further upon approval of laying / installation methodology by EIC, Contractor shall start the execution of laying / installation works of burried pipeline at site.

-

-

-

... More
The above items rate shall be applicable for all locations / region/ charge area within & around the GA.

-

-

-

... More
The above rate is excluding of major crossings by HDD, Boring, moling Method mentioned under separate item.

-

-

-

... More
Contractor shall ensure that no tree/ plant cutting shall be carried out during Pipe Line Laying operations.Trenching shall be carried out manually if needed, so as to ensure no damage to plant/ tree/ OFC / water pipe line / telephone line/ sewage line/ electric cable and other under ground utilities.

-

-

-

... More
Contractor have to use rock cutting tool and all other accessries as required to make drill hole in case of rocky starta.

-

-

-

... More
Payment for carrying out liasioning & co-odrination works for utility/ foreign pipeline crossings (if any) and obtaining permission / NOC from these authorities including assistance in ROU opening & closing and their maintainence/ management both side of the crossings shall be made by separate SOR item mentioned elsewhere in this SOR.

-

-

-

... More
RAKING UP OF BUILT-UP SURFACE/ HARD SURFACE FOR LAYING / INSTALLATION OF PIPELINE

-

-

-

... More
Raking up of built-up surface / Hard surface of any type including metal road/ surface , concrete road/ surface, bituminous road/ surface, asphalt road/ surface etc. which is breakable in pieces shall be carried out either by breaking, chiselling or otherwise cutting etc manually or using pneumatic machine. Further, built-up surface of any type including tiled surface, paver block, brick lined etc.which is breakable/removable in pieces manually shall be carried out without using pneumatic machine. All tiles/ slabs/ paver block/ curb stones etc.removed during excavation shall be placed properly. All other activities and payment for pipeline laying/ installation shall be carried out as per mainline laying activities SOR Sl No-1 (including its notes).

-

-

-

... More
406.4 7.1 API 5L Gr. X-56 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

120

-

-

... More
323.9 6.4 API 5L Gr. X-56 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

360

-

-

... More
273 6.4 API 5L Gr. X-56 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

200

-

-

... More
219.1 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

220

-

-

... More
168.3 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

60

-

-

... More
114.3 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

440

-

-

... More
REMOVAL & RESTORATION OF CONTINEOUS CONCRETE ( RCC/PCC) FOR LAYING / INSTALLATION OF PIPELINE

-

-

-

... More
Removal of contrete (RCC/PCC etc) for prepration of pipeline trench (by using pneumatic machine or other approved method) including restoration of same as previous by providing the RCC/PCC...etc up to satisfaction of EIC and concern authority. Shifting & disposing of debrish material at suitable location as per direction of EIC. All other activities for pipeline laying/ installation and payment shall be carried out as per mainline laying activities SOR Sl No-1 (including its notes).

-

-

-

... More
406.4 7.1 API 5L Gr. X-56 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

60

-

-

... More
323.9 6.4 API 5L Gr. X-56 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

180

-

-

... More
273 6.4 API 5L Gr. X-56 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

100

-

-

... More
219.1 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

110

-

-

... More
168.3 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

30

-

-

... More
114.3 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

220

-

-

... More
RESTORATION OF ROADS

-

-

-

... More
Restoration of Asphalt / Bituminous / Concrete / Metal / Red stone roads / Pavement / Paver block / Tiled / Bricklined including supply (if required) /backfilling of soil/Granular sub-base (GSB) and its compaction to original condition as per requirement and to the entire satisfaction of EIC and / or concerned Owners having jurisdiction for following thickness :

-

-

-

... More
Restoration of Asphalt / Bituminous road upto 10 cm thickness

240

-

-

... More
Restoration of Asphalt / Bituminous road beyond 10 cm and upto 30 cm thickness

720

-

-

... More
Restoration of Concrete / Metal road upto 10 cm thickness

400

-

-

... More
Restoration of Concrete / Metal road beyond 10 cm and upto 30 cm thickness

440

-

-

... More
Restoration of red stone road / pavement / pavor block / tiled / bricklined upto 4 inch thickness

120

-

-

... More
Restoration of red stone road / pavement / pavor block / tiled / bricklined beyond 4 inch and upto 12 inch thickness

220

-

-

... More
BORROWED LOCAL SOIL FOR BACKFILLING

-

-

-

... More
Additional work over and above (Sl.no.1) for supply of specified and approved quality of borrowed local soft graded soil / sand in place of available excavated material and / or other suitable soil as per applicable standards / specifications, including backfilling of excavated trench for specified length after laying and padding of pipeline, including local transportation of such special backfill material over all distances, complete.

360

-

-

... More
CONTINUOUS CONCRETE WEIGHT COATING (FOR CS PIPES)

-

-

-

... More
Supply of all consumables, materials and application of 60 mm thk. continuous concrete weight coating of minimum density 2245 kg/m3 of minimum grade M-35 for 8"/4" NB Line Pipe and field joints thereof in all areas of work wherever required as per site condition and performing all works as per specification on the line pipe for following sizes :-

-

-

-

... More
Specified OD 406.4 mm x7.1 mm W.T.

60

-

-

... More
Specified OD 323.9 mm x 6.4 mm W.T.

180

-

-

... More
Specified OD 273 mm x 6.4 mm W.T.

100

-

-

... More
Specified OD 219.1 mm x 6.4 mm W.T.

110

-

-

... More
Specified OD 168.3 mm x 6.4 mm W.T.

30

-

-

... More
Specified OD 114.3 mm x 6.4 mm W.T.

220

-

-

... More
Note:

-

-

-

... More
1. This item shall be operated alongwith SOR Sl no-1 (including its notes ) above for anti-boyancy in marshy lands, small water body crosssings like nala , canal , ponds , water channel etc. as per instruction of EIC based on actual site condition. 2. Laying of Pipeline in marshy land/area and dain/nala shall be payable to contractor as per quoted sub-SOR items under SOR Sl no-1 (ncluding its notes) & its concrete weight coating applied over the pipe shall be paid through above SOR items.

-

-

-

... More
PIPING FABRICATION & INSTALLATION WORKS FOR SECTIONALISING VALVE STATION (WITH FUTURE TAP-OFF)

-

-

-

... More
SECTIONALISING VALVE STATION (WITH FUTURE TAP-OFF) - UNDER GROUND

-

-

-

... More
All works for installation of all piping Underground at all depth for Vent Type/ No Vent Type Sectionalising Valve Station (WITH FUTURE TAP-OFF/ WITHOUT FUTURE TAP-OFF) in Valve Chamber all type of terrains and soils including transportation and handling of all owner/contractor supplied materials i.e. full bore 16",12", 10", 8", 6" & 4'' Ball valves (fully welded body & butt welded end), Plug Valves (( butt welded end)), all types of other valves of all sizes, Flow tees/Weldolet of all sizes, Insulating Joint, vent line pipes for mainline, assorted pipes and all flanges and fittings from designated places(s) of issue to work site. Supply of gaskets, studs, nuts,copper jumpers, nipples & coupling etc. Installation / Erection of instrumentation items i.e. pressure gauge, consumables, manpower, machineries, tools & tackles for carrying out all mechanical works of underground and above ground piping including fabrication, welding, nondestructive testing of welds, weld repairs/ Pretesting, cleaning/ flushing, pre-hydrotesting & hydrostatic testing, dewatering, functional testing, cutting of mainline and bevelling (if required), tie-in of valve assembly, including radiography of tie-in joints, corrosion coating (by heat shrink sleeves) for burried piping and external painting for buried fittings by high build epoxy of min. 600 micron of R-95 or equivalent as required, obtaining all statutory clearances, approvals and permissions for the works (wherever required), making of valve pit [for detail refer relevant drawings (i.e. P&ID, Plot Plan) for SV Station enclosed with tender document, pipe supports including all associated civil works ( pertaining to supports only); painting, finishing, clean-up and restoration of site; preparation of as-built drawings, documents and project records and performing all works as per drawings, specifications, other provisions of Contract document and instructions of Engineer-in-charge.

-

-

-

... More
Sectionalising Valve Station ( 16" ) - Without future Tap-off

1

-

-

... More
Sectionalising Valve Station ( 16" ) - With future Tap-off

1

-

-

... More
Sectionalising Valve Station ( 12" ) - Without future Tap-off

4

-

-

... More
Sectionalising Valve Station ( 12" ) - With future Tap-off

2

-

-

... More
Sectionalising Valve Station ( 10" ) - Without future Tap-off

3

-

-

... More
Sectionalising Valve Station ( 10" ) - With future Tap-off

1

-

-

... More
Sectionalising Valve Station ( 8" ) - Without future Tap-off

3

-

-

... More
Sectionalising Valve Station ( 8" ) - With future Tap-off

1

-

-

... More
Sectionalising Valve Station ( 6" ) - Without future Tap-off

1

-

-

... More
Sectionalising Valve Station ( 6" ) - With future Tap-off

1

-

-

... More
Sectionalising Valve Station ( 4" ) - Without future Tap-off

6

-

-

... More
Sectionalising Valve Station ( 4" ) - With future Tap-off

2

-

-

... More
Notes: 1. This work is exclusive of all works associated with main pipeline covered at elsewhere in SOR (Sl.no.1). 2. All Civil/ structural works except for piping supports will be paid separately as per rates provided elsewhere. 3. Work is inclusive of receiving, taking over, loading & unloading of company supplied material and return of surplus material to Company's designated stockyard/store. 4. Incase of bought-out items, supply of Valves, Assorted Pipe, fittings & Flanges,IJ, instrumentation work...etc shall be paid as per item rates mentioned elsewhere in the SOR. Fabrication of SV, erection, Testing & commissioing are included in above item rates, hence contractor have to quote accordingly. 5. Valve Pit and its upper slab for under ground SV stations (with/without future Tap-off) shall be payable through separate item rates mentioned elsewhere in the SOR.

-

-

-

... More
(Refer relevant drawings for Sectionalising Valve Stations (with/without future Tap-off) enclosed with tender document for ascertaining quantum of works associated with SV Station).

-

-

-

... More
PIPING FABRICATION & UNDERGROUND/ ABOVEGROUND INSTALLATION WORKS OF TAP-OFF LINE AT PROPOSED LOCATION / POINT ON MAIN STEEL PIPELINE.

-

-

-

... More
All works for underground/ aboveground installation of all piping and valves assembly at all depth for Tap-off in all type of terrains and soils including transportation and handling of all owner/contractor supplied materials i.e, butt welded Ball valve, all valves of all types and sizes , Barred tees of all sizes and all fittings from designated places(s) of issue to work site. Supply of assorted pipes, consumables, manpower, machineries, tools & tackles for carrying out all mechanical works of underground/aboveground piping including fabrication, welding, nondestructive testing of welds, weld repairs/ retesting, cleaning/ flushing, pre-hydrotesting & hydrostatic testing, dewatering, functional testing, cutting of mainline and bevelling (if required), tie-in of valve assembly, including radiography of tie-in joints, corrosion coating (by heat shrink sleeves) for burried piping and external painting for burried fittings by high build epoxy of min. 600 micron of R-95 or equivalent as required, obtaining all statutory clearances, approvals and permissions for the works (wherever required), excavation and filling in all types of soils including soft/ hard rock for installation of piping, painting, finishing, clean-up and restoration of site; preparation of as-built drawings, documents and project records and performing all works as per drawings, specifications, other provisions of Contract document and instructions of Engineer-in-charge. (This SOR item also includes Installation of all burried valves with postive isolation inside the valve pit that are required either to terminate the pipeline or to be kept as provision for the hook-up with the future pipeline.)

-

-

-

... More
16'' Tap-off Point

2

-

-

... More
12'' Tap-off Point

2

-

-

... More
10'' Tap-off Point

2

-

-

... More
8'' Tap-off Point

2

-

-

... More
6'' Tap-off Point

2

-

-

... More
4'' Tap-off Point

10

-

-

... More
Notes: 1. This work is exclusive of all works associated with main pipeline covered at elsewhere in SOR (Sl.no.1). 2. All others works pertaining to Tap-off (Instrumentation works) (if any) shall be as per rates indicated elsewhere in the tender document. 3. Work is inclusive of receiving, taking over, loading & unloading of company supplied material and return of surplus material to Company's designated stockyard/store. 4.Valve Pit and its upper slab for under ground Tap-off Station shall be payable through separate item rates mentioned elsewhere in the SOR. 5. Incase of bought-out items/ materials i.e., supply of Valves, Assorted Pipe, fittings & Flanges,IJ, instrumentation work...etc shall be paid as per item rates mentioned elsewhere in the SOR. Fabrication of Tap-off point, erection, Testing & commissioing are included in above item rates, hence contractor have to quote accordingly. 6. Qty of tap off points is tentative and may differ as per site requirement. 7. Qty for tap-off point mentioned above is excluding quantities mentioned in SV station and for separate locations than SV station. (Refer relevant drawings for Tap-off Station enclosed with tender document for ascertaining quantum of mechanical work associated with Tap-off Station).

-

-

-

... More
CROSSING (by HDD Method) not covered under item mentioned under Sl no -A00100 i.e, Major crossings

-

-

-

... More
Complete work for installation of carrier pipeline (between the ROW limits as per approved drawing) by HDD method including "Receiving and taking over" owner supplied three layer PE coated line pipes from Owner's designated place to issue/ dump site(s) and transportation to Contractor's stock yard/ work shop/ work site including all handling, loading, unloading, aligning etc. supply of all Contractor supplied material including consumables, manpower, equipment, other resources to work site(s) and aquiring the required land for storage., Execution of, but not limited to, following works in accordance with specifications and instruction of Engineer-in-charge and as per all provision of Contract Document.

-

-

-

... More
Pre-construction survey, necessary cover required over the carrier pipeline from lowest bed level of the stipulated water crossing to be obtained from concerned authority, bed strata data including design & detail engineering and making of crossing drawing for getting their approval from concerned Authority/ Engineer-in-charge, getting work permit/ NOC for water crossings as well as utility crossings (if any) encountered during water crossing prior to start the execution of work. getting work permit/ NOC for water crossings as well as utility crossings (if any) encountered during water crossing prior to start the execution of work.; obtaining historical data/ scour depth (for river) from concerned authority, if required, ascertaining under neath soil & strata, necessary cover required over the carrier pipeline from lowest bed level of the stipulated water crossing including design & calculation and detail engineering and making of crossing drawing for getting the approval from concerned Authority/ Engineer-in-charge, getting work permit/ NOC for water crossings as well as utility crossings (if any) encountered during water crossing prior to start the execution of work. For road crossings,pre-construction survey based on site visit, collection of data (if required) from concerned Authority including design and detail engineering and making of crossing drawings for getting their approval from concerned Authority/ Engineer-in-charge, getting work permit/ NOC for the crossing as well as utility crossings (if any) encountered during crossing prior to start the execution of work.

-

-

-

... More
In case of Water body (i.e River/ Canal/ Distributary, etc.) / Drain / Nala Crossings Drilling to the required depth on the banks and bed including maintenance of drill hole in all types of strata (i.e. soft/hard soil, soft/hard rock including boulder, pebbels / cobbels, etc.), all depth to accommodate the pipeline at all conditions of the waterbody crossings by HDD methods for providing with minimum cover either (i) Minimum 1.5 mtr below the scour level / profile, duly approved/ accepted by concerned authority ( under whose jurisdictions the crossing lies)---- For River/ Distributary/ Canal including with Rocky bed or (ii) Minimum 2.5 mtr below the scour level / profile, duly approved/ accepted by concerned authority ( under whose jurisdictions the crossing lies)---- For River/ Distributary/ Canal without Rocky bed. or (iii) Minimum 4.5 mtr below the lowest bed level / profile (if scour level/ profile is not known), duly approved/ accepted by concerned authority ( under whose jurisdictions the crossing lies)---- For River/ Distributary/ Canal without Rocky bed. or (iv) Minimum 1.5 m below the lowest bed level / profile, duly approved/ accepted by concerned authority ( under whose jurisdictions the crossing lies)---- For Waterbodies (other than River/ Distributary/ Canal) / drain/ nala crossings. and (v) In addition to point (i), (ii) & (iii), In case of multiple combined X-ing i.e.River/ Distributary/ Canal alongwith road/ drain/ nala/ other type of water bodies, minimum cover requirement as per specification/ concerned authority for each type of crossing (x-ing) are also to be fulfilled & maintained.

-

-

-

... More
In case of Road (NH/ SH/ MDR) / Rail crossing, drilling to required depth from top of road including maintenance of drill hole in all types of Strata (i.e; soft/hard soil, soft/hard rock including boulder, pebbels / cobbels etc), all depth to accommodate the pipeline at all conditions encountered during road crossing by approved HDD methods for providing minimum cover specified in code/ specification or the actual depth as decided by concerned authority, whichever is more.

-

-

-

... More
Laying of the carrier pipeline (for both water body and elevated road / rail / structure crossing) in all type of under ground strata (including soft/hard soil and all type of rock ) by the approved HDD method across the crossing including, strings preparation of carrier , welding, testing, 100% radiography by x-ray, welding repair and retest, coating of field joints with special type Dirax Heat Shrink Sleeve or equivalent (including supply of coating material) and repair of pipeline coating with special PERP-80 repair patch or equivalent material (including supply of repair patch) as per specification, pre-hydrotest of complete strings made for crossing as per specification etc.

-

-

-

... More
Backfilling of the ditch/ trench including restoration and clean-up of area, disposal of drilling fluid & waste etc. to the satisfaction of Engineer-in-charge and /or as directed by Concerned Authority.

-

-

-

... More
Gauging (pre & post installation), Pigging, Cleaning for Post installation hydrotest and carrying out further Post installation hydrotest, dewatering and tie-in with pipeline at either banks or other adjusant pipeline section maintaining minimum pipeline cover 1.0 to 1.5 meter etc. all other works including pigging, Cleaning, final hydrotesting etc. alongwith mainline works(as mentioned above) required as per specifications, codes, approved drawings, calculations, methods and as directed by Engineer-in-charge and provision of contract document, getting NOC from all concerned authority of the facillities crossed. However payment for the Gauging and Post installation hydrotest shall be made as separate items mention else where in the SOR

-

-

-

... More
Details of Crossings

-

-

-

... More
Any type of Crossing viz. Unlined Canal / Distributary / Canal / Drain / River / Nala / NH / SH / MDR / RAIL etc. crossings for carrier pipeline of size 406.4NB x 7.1 mm Thk. of API 5L Grade X-56 in all type of under ground strata (including soft/hard soil and all type of rock )

750

-

-

... More
Any type of Crossing viz. Unlined Canal / Distributary / Canal / Drain / River / Nala / NH / SH / MDR / RAIL etc. crossings for carrier pipeline of size 323.9 NB x 6.4mm Thk. of API 5L Grade X-56 in all type of under ground strata (including soft/hard soil and all type of rock )

900

-

-

... More
Any type of Crossing viz. Crossing of Unlined Canal / Distributary / Canal / Drain / River / Nala / NH / SH / MDR / RAIL etc. crossings for carrier pipeline of size 273 NB x 6.4mm Thk. of API 5L Grade X-56 in all type of under ground strata (including soft/hard soil and all type of rock )

1100

-

-

... More
Any type of Crossing viz. Unlined Canal / Distributary / Canal / Drain / River / Nala / NH / SH / MDR / RAIL etc. crossings for carrier pipeline of size 219.1 NB x 6.4mm Thk. of API 5L Grade X-52 in all type of under ground strata (including soft/hard soil and all type of rock )

900

-

-

... More
Any type of Crossing viz. Crossing of Unlined Canal / Distributary / Canal / Drain / River / Nala / NH / SH / MDR / RAIL etc. crossings for carrier pipeline of size 168.3 NB x 6.4mm Thk. of API 5L Grade X-52 in all type of under ground strata (including soft/hard soil and all type of rock )

750

-

-

... More
Any type of Crossing viz. Crossing of Unlined Canal / Distributary / Canal / Drain / River / Nala / NH / SH / MDR / RAIL etc. crossings for carrier pipeline of size 114.3 NB x 6.4mm Thk. of API 5L Grade X-52 in all type of under ground strata (including soft/hard soil and all type of rock )

1200

-

-

... More
Note:

-

-

-

... More
(i) Quantity against the above crossings items indicated are tentative and for multiple crossings at different locations as per requirement at site and EIC's decision in this regard shall be final and binding to the contractor.

-

-

-

... More
(ii) Crossing width may vary as per site condition. Tenderer are advised to visit the site for actual assessment of extent of crossing and to access the maximum extent of cover which may have to be provided. Actual string length for HDD shall be as per design calculations so that pipe is not under stress as permitted by codes/ specifications. Final length of string shall be decided after decision of minimum cover requirement by concerned Authority/ Engineer-in-charge.

-

-

-

... More
(iii).Payment for the length of final tied-in carrier pipeline string are inclusive in the above item rate and no separate payment shall be made under other item mentioned elsewhere.

-

-

-

... More
(iv) The Contractor has to quote on running meter basis for X-ing. No extra payment of any type shall be made against this item.

-

-

-

... More
(v) Length of the individual crossing may increase* or decrease depending upon site condition/requirement , accordingly HDD rig capacity may increase (w.r.t. rig capacity as mentined in tender document , if any ) and contractor shall deploy the same as per decision of EIC without any extra compensation. (*) - For Individual 16"/12"/10'/8"/6"/4" NB Pipeline crossing : Single Shot of maximum length upto 750 mtrs (profile length).

-

-

-

... More
(vi).For river crossings Geo-technical investigation , bore log data ,hydrological and hydrographical survey of crossings, as required shall be carriedout by the successful bidder and submit the data/report for the same for OWNER / MECON for Approval . Contractor shall submit design calculation and all construction (profile) drawings in line with approved survey data for OWNER / MECON for approval. Work shall start only after approval of the above. However MECON/OWNER shall not be held responsible for the change of underground/ bed strata if found to be variable. Contractor may ascertain the bore hole data by taking random samples,obtain historical data/ scour depth (in case of river/ distributary) from concerned authority ascertaining under neath type of soil / rock in bed strata, necessary cover required over the carrier pipeline from lowest bed level of the stipulated water crossing if they feel the necessity.

-

-

-

... More
RAIL/ NH / SH / MDR (CASED)

-

-

-

... More
Crossing with Casing Pipe by Boring, Open cut method

-

-

-

... More
Complete work of the Road [National Highway (NH) / State Highway (SH) / Major District Road (MDR)] / Rail crossing (between the limits as defined in approved drawings) excluding supply of casing pipe bare (for 8'', & 4" NB carrier Pipeline) including handling, loading, transportation, unloading to Contractor's own stock yard/ work site.

-

-

-

... More
Pre-construction survey and making of crossing drawing based on site visit and getting their approval from concerned Authority/ Engineer-in-charge prior to start the execution of work.

-

-

-

... More
Strings preparation of carrier pipes, welding, testing, 100 % radiography by X-ray, welding repair and retest, coating of field joints with Heat Shrink Sleeve or equivalent (including supply of coating material) and repair of pipeline coating with repair patch or equivalent material (including supply of repair patch) as per specification, pre-hydrotest of complete strings made for crossing etc.

-

-

-

... More
Preparation of required length of carrier pipeline welded string including all other works as mentioned in item no. 1.0 above and as per specification/ drawings. Insertion of carrier pipe in casing pipe after above ground pretesting at specified test pressure including installation of casing insulators and Zn ribbon anode as per approved design calculation, specification/ drawings. Insatllation of vent and drain assembly, fixing of end seals, backfilling and restoration as original of the facilities crossed.

-

-

-

... More
Installation of casing pipe by jacking boring / augur boring for cased crossings including open cut for adjacent service road, canal, minor nature of water channel, utility line crossing etc. (if any) wherever required for all depth in all type of under ground strata (including soft/hard soil and all type of rock ) and terrrain for carrier pipe insertion. All other Contractor supplied materials like casing insulators, Zinc Ribbon Anodes and casing end seals as per enclosed specification/ drawings materials for casing vents and drain assembly etc. including supply of all other materials, equipments, consumables, manpower, welding including visual inspection of all weld joints.

-

-

-

... More
Preparation of required length of carrier pipeline welded string including all other works as mentioned in SOR Sl. No. 1.1 above and as per specification/ drawings. Insertion of carrier pipe in casing pipe after above ground pretesting at specified test pressure including installation of casing insulators and Zn ribbon anode as per approved design calculation, specification/ drawings.Installation of vent and drain assembly, fixing of end seals, backfilling and restoration as original of the facilities crossed.

-

-

-

... More
Backfilling of the ditch/ trench including restoration and cleanup of area, disposal of debrish/ extra earth, & waste etc to the satisfaction of Engineer-in-charge and/or as directed by concerned Authority.

-

-

-

... More
FOR moling-Survey of under ground utilities, execution of the work as per specification, including excavation of pits moling with the hole size not exceeding 20% of the pipe dia, jointing and insertion of carrier pipe with casing, testing & commissioning and restoration of the pits to original condition, submission of As-Built Graph as per specifications and the instruction of Engineer-in-charge.

-

-

-

... More
Gauging (pre & post installation), Pigging, Cleaning for Post installation hydrotest and carrying out further Post installation hydrotest, dewatering and tie-in with pipeline with adjusant pipeline section maintaining minimum pipeline cover 1.0 to 1.5 meter etc. all other works including pigging, Cleaning, final hydrotesting etc. alongwith mainline works(as mentioned above) required as per specifications, codes, approved drawings, calculations, methods and as directed by Engineer-in-charge and provision of contract document, getting NOC from all concerned authority of the facillities crossed. However payment for the Gauging and Post installation hydrotest shall be made as separate items mention else where in the SOR.

-

-

-

... More
Tie-in with pipeline at either banks etc.

-

-

-

... More
Details of X-ings

-

-

-

... More
By Jacking/ Boring of Casing Pipe - 24" (609.6 mm) OD, 8 mm wall thk. (for 16" NB pipeline)

48

-

-

... More
By Open Cut of Casing Pipe - 24" (609.6 mm) OD, 8 mm wall thk. (for 16" NB pipeline)

72

-

-

... More
By Jacking/ Boring of Casing Pipe - 18" (457 mm) OD, 7 mm wall thk. (for12" NB pipeline)

192

-

-

... More
By Open Cut of Casing Pipe - 18" (457 mm) OD, 7 mm wall thk. (for 12" NB pipeline)

168

-

-

... More
By Jacking/ Boring of Casing Pipe - 16" (406.4 mm) OD, 6 mm wall thk. (for 10" NB pipeline)

104

-

-

... More
By Open Cut of Casing Pipe - 16" (406.4 mm) OD, 6 mm wall thk. (for 10" NB pipeline)

96

-

-

... More
By Jacking/ Boring of Casing Pipe - 14" (355 mm) OD, 5 mm wall thk. (for 8" NB pipeline)

120

-

-

... More
By Open Cut of Casing Pipe - 14" (355 mm) OD, 5 mm wall thk. (for 8" NB pipeline)

100

-

-

... More
By Jacking/ Boring of Casing Pipe - 12" (304.8 mm) OD, 5 mm wall thk. (for 6" NB pipeline)

30

-

-

... More
By Open Cut of Casing Pipe - 12" (304.8 mm) OD, 5 mm wall thk. (for 6" NB pipeline)

30

-

-

... More
By Jacking/ Boring of Casing Pipe- 10" (273.0 mm) OD, 5.0 mm wall thk. (for 4" NB pipeline)

192

-

-

... More
By Open Cut of Casing Pipe- - 10" (273 mm) OD, 5.0 mm wall thk (for 4" NB pipeline)

248

-

-

... More
(i) Actual length & cover from top of casing pipe may vary depending upon site conditions, approved drawings, specification etc. and / or as decided by concerned Authority / Engineer-in-charge.

-

-

-

... More
(ii) Payment for the length of carrier pipeline string of casing pipeline length plus two meters (laid by boring/jacking/open cut is inclusive in the above SOR item . Payment for additional length of carrier pipeline string shall be made under SOR Sl no-1 (including its notes )

-

-

-

... More
(iii) Quantity against SOR items for cased crossings indicated above are tentative. The quantity indicated against each SOR item are not for any single crossings. This shall be as per requirement at site for crossing at different & multiple locations. In this regard and crossing methodology, decision of EIC shall be final and binding to the contractor.

-

-

-

... More
(iv) Supply of casing pipe shall be paid as per relevent SOR item.

-

-

-

... More
(v) Carrier pipes can be of API 5L Grade X-52/56

-

-

-

... More
Supply & Coating of Casing Pipe

-

-

-

... More
Complete work of supply of carbon steel pipes required for crossing, including all taxes, duties, transportation and inspection charges but not limited to the following items in accordance with relevant specifications, scope of work, drawings and instructions of EIC as per all provision of contract document. Handling, loading, transportation & unloading etc. to contractor's own stock yard / worksite(s) is also included in contractor's scope.

-

-

-

... More
Supply of Casing Pipe - 24" (609.6 mm) OD, 8 mm wall thk of material API 5L Gr. B / IS : 3589 or equivalent ERW Pipe (for 8" NB pipeline).

120

-

-

... More
All works related to coating of Casing pipe- 24" (609.6 mm) OD, 8 mm wall thk with coal tar epoxy coating of minimum 600 microns after proper cleaning) including supply of caoting material, consumables etc

120

-

-

... More
Supply of Casing Pipe - 18" (457 mm) OD, 7 mm wall thk of material API 5L Gr. B / IS : 3589 or equivalent ERW Pipe (for 8" NB pipeline).

360

-

-

... More
All works related to coating of Casing pipe- 18" (457 mm) OD, 7 mm wall thk with coal tar epoxy coating of minimum 600 microns after proper cleaning) including supply of caoting material, consumables etc

360

-

-

... More
Supply of Casing Pipe - 16" (406.4 mm) OD, 6 mm wall thk of material API 5L Gr. B / IS : 3589 or equivalent ERW Pipe (for 8" NB pipeline).

200

-

-

... More
All works related to coating of Casing pipe- 16" (406.4 mm) OD, 6 mm wall thk with coal tar epoxy coating of minimum 600 microns after proper cleaning) including supply of caoting material, consumables etc

200

-

-

... More
Supply of Casing Pipe - 14" (355 mm) OD, 5 mm wall thkof material API 5L Gr. B / IS : 3589 or equivalent ERW Pipe (for 8" NB pipeline).

220

-

-

... More
All works related to coating of Casing pipe- 14" (355 mm) OD, 5 mm wall thk with coal tar epoxy coating of minimum 600 microns after proper cleaning) including supply of caoting material, consumables etc

220

-

-

... More
Supply of Casing Pipe - 12" (304.8 mm) OD, 5 mm wall thk of material API 5L Gr. B / IS : 3589 or equivalent ERW Pipe (for 8" NB pipeline).

60

-

-

... More
All works related to coating of Casing pipe- 12" (304.8 mm) OD, 5 mm wall thk with coal tar epoxy coating of minimum 600 microns after proper cleaning) including supply of caoting material, consumables etc

60

-

-

... More
Supply of Casing Pipe - 10" (273 mm) OD, 5.0 mm wall thk of material API 5L Gr. B / IS : 3589 or equivalent ERW Pipe (for 8" NB pipeline).

440

-

-

... More
All works related to coating of Casing pipe- 10" (273 mm) OD, 5.0 mm wall thk with coal tar epoxy coating of minimum 600 microns after proper cleaning) including supply of caoting material, consumables etc

440

-

-

... More
Coating of CS Bare pipes of all sizes (i.e., 1/2 inch to 8 inch) with Cold tape /equvivalent as approved by client /Consultant. Bare CS pipes of all sizes shall be supplied as free issue.

180

-

-

... More
Excavation for pipe top cover beyond 1.5m depth in case of crossing of utilities/ drain/ culverts etc. through open cut upto the following depth in Normal Surface / Unprepared surface (Katcha Surface)/ built-up surface / Hard surface of any type including metal, concrete, bituminous, tiled, brick lined soft/ hard rock which is breakable in pieces manually (without use of pneumatic machine) etc. All tiles/ slabs/ curb stones etc. removed during excavation shall be placed properly. The other activities are as per SOR Sl no -A00100 (including its notes) (including restoration of the damaged area to its original condition and satisfaction of the Engineer-in-charge / concerned authorities).

-

-

-

... More
Deeper than 1.5 m & upto 2.5 m below existing level (for 406.4 mm NB Pipeline)

24

-

-

... More
Deeper than 2.5 m & upto 4.5 m below existing level (for 406.4 mm NB Pipeline)

36

-

-

... More
Deeper than 1.5 m & upto 2.5 m below existing level (for 323.9 mm NB Pipeline)

96

-

-

... More
Deeper than 2.5 m & upto 4.5 m below existing level (for 323.9 mm NB Pipeline)

84

-

-

... More
Deeper than 1.5 m & upto 2.5 m below existing level (for 273 mm NB Pipeline)

52

-

-

... More
Deeper than 2.5 m & upto 4.5 m below existing level (for 273 mm NB Pipeline)

48

-

-

... More
Deeper than 1.5 m & upto 2.5 m below existing level (for 219.1 mm NB Pipeline)

60

-

-

... More
Deeper than 2.5 m & upto 4.5 m below existing level (for 219.1 mm NB Pipeline)

50

-

-

... More
Deeper than 1.5 m & upto 2.5 m below existing level (for 168.3 mm NB Pipeline)

15

-

-

... More
Deeper than 2.5 m & upto 4.5 m below existing level (for 168.3 mm NB Pipeline)

15

-

-

... More
Deeper than 1.5 m & upto 2.5 m below existing level (for 114.3 mm NB Pipeline)

96

-

-

... More
Deeper than 2.5 m & upto 4.5 m below existing level (for 114.3 mm NB Pipeline)

124

-

-

... More
Note:-

-

-

-

... More
(i) Quantities indicated above are tentative and shall be carried out at different & multiple locations.

-

-

-

... More
(ii) Prior permission from EIC is required before execution of above item.

-

-

-

... More
(iii) Other mainline laying activities shall be paid as per SOR Sl no -A00100 (including its notes ) mentioned elsewhere in the SOR. Bidder have to quote accordingly.

-

-

-

... More
REPAIR OF DEFECT IN PIPES (NOT ATTRIBUTED TO CONTRACTOR)

-

-

-

... More
Repair of defects on Owner supplied linepipes of all grades and wall thickness as specified in following items, noted and recorded at the time of "receiving and taking over" by Contractor in the presence of Engineer-in-charge.

-

-

-

... More
Cutting and rebevelling for dents in bevels exceeding 3 mm in depth for pipe sizes:

-

-

-

... More
Specified OD, mm

-

-

-

... More
406.4

3

-

-

... More
323.9

4

-

-

... More
273

4

-

-

... More
219.1

2

-

-

... More
168.3

2

-

-

... More
114.3

6

-

-

... More
Jack out of dents in bevels ranging between 1 mm and 3 mm in depth for pipe sizes:

-

-

-

... More
406.4

3

-

-

... More
323.9

4

-

-

... More
273

4

-

-

... More
219.1

2

-

-

... More
168.3

2

-

-

... More
114.3

6

-

-

... More
Note : Quantity indicated above is tentative and may increase/decrease or delete as per site requirement.

-

-

-

... More
REPAIR OF COATING DEFECTS (NOT ATTRIBUTED TO CONTRACTOR)

-

-

-

... More
Repair of Holiday in Coating (Noted and recorded at the time of "receiving and taking over")

-

-

-

... More
Supply of all coating repair materials as per requirements of specification to be compatible with line pipe coating material, supply of all consumables, utilities, equipments and all manpower required, pipe cleaning and surface preparation, repairing of coating defects (resulting in holiday) and testing including all handling, transportation, etc. for line pipes, performing all works necessary for the completion of the works stirctly in accordance with relevant specification and instructions of Engineer-In-Charge. This rate shall be applicable per sq. cm of the exposed steel area exposed steel area.

500

-

-

... More
PERMANENT MARKERS

-

-

-

... More
Supply, fabrication and installation of all types of permanent markers along the route including all associated civil works such as excavation in all types of soil, construction in all types of soil, construction of pedestals and grouting with concrete, clearing, supply and application of approved colour and quality of primer and paint, stencil letter cutting for numbers, direction, change etc., restoration of area to original condition and performing all works as per drawing, specification and instruction of engineer-in-charge.

-

-

-

... More
Pipeline RCC boundary / route marker as per drawing

400

-

-

... More
Pipeline warning markers with post & foundations

160

-

-

... More
Pipeline direction marker with post & foundations

100

-

-

... More
Pipeline KM with post & foundations

80

-

-

... More
Navigable Waterway Markers

30

-

-

... More
Pole Markers with Foundation for PE laying

-

-

-

... More
Supply, fabrication and installation of plate markers as per the attached drawings in technical volume including all associated civil works such as excavation and construction in all types of soils, construction and pedestals and grouting with concrete, cleaning, stencil let.

96

-

-

... More
Warning Plate Markers for PE laying

-

-

-

... More
Supply, fabrication and installation of plate markers, including application of approved color and quality of primer and paint, stencil letter cutting of lettering, numbers, direction, etc. as per the attached drawing in technical volume to be installed near regulator.

42

-

-

... More
Note:

-

-

-

... More
Note: Qty of above markers are tentative and may increase or decrease as per site situation. Contractor have to take prior approval from EIC before fabrication or order placement.

-

-

-

... More
LEAK / BURST (ATTRIBUTABLE TO OWNER)

-

-

-

... More
All works for locating leak / burst in Company's supplied material only (occurred during hydro-static testing) including necessary repairing/replacing defective pipe lengths including cutting and out and removing the defective pipe, pre-testing and welding of replacement pipe, NDT of welds, repair and retesting of defective welds, coating/painting of replacement pipe, pretesting the replacement pipe into mainline/branch line, coating/painting of welding joints, cleanup, retesting including cost of all labour materials, consumables and performing all works in accordance with the provisions of the Contract document and as directed by Owner/ Engineer-in-charge (EIC)

-

-

-

... More
For 16" NB Line

1

-

-

... More
For 12" NB Line

1

-

-

... More
For 10" NB Line

1

-

-

... More
For 8" NB Line

1

-

-

... More
For 6" NB Line

1

-

-

... More
For 4" NB Line

1

-

-

... More
Note:

-

-

-

... More
(i)This rate is applicable for manufacturing defects in Owner supplied material only.

-

-

-

... More
(ii) Leak detection, its rectification and successfully re-hydrotesting shall be carried out as per approved procedure by Contractor with a view that completion of all activity for successful hydrotesting is not inordinalely extended which will hamper the overall project schedule.

-

-

-

... More
PRE-COMMISSIONING & ASSISTANCE IN COMMISSIONING OF ENTIRE UNDERGROUND PIPELINE LENGTH AND STATIONS

-

-

-

... More
Pre-commissioning activities and pre-commissioning checks to the specified acceptance criteria, making the entire pipeline system ready for commissioning, providing assistance during the complete duration of commissioning operations, supply of all equipment, manpower, consumables (including pigs and required quantity of nitrogen for valve operations) materials for all temporary works and performing all associated works, complete as per the relevant specifications, other provisions of Contract document and instructions of Engineer-in-Charge.

-

-

-

... More
Swabbing of Pipeline section

-

-

-

... More
For 16" NB Line

7170

-

-

... More
For 12" NB Line

20160

-

-

... More
For 10" NB Line

11800

-

-

... More
For 8" NB Line

12670

-

-

... More
For 6" NB Line

3960

-

-

... More
For 4" NB Line

24740

-

-

... More
Notes:- i) Above quantities for various pipelines sections at different locations within the GA.. ii) For swabbing, minimum twenty (20) runs (of combination of low density and high density Pigs) shall be carried out till acceptance of the swabbing criteria as per specification, whichever is earlier.

-

-

-

... More
Complete work of carrying out DRYING of the underground pipeline section length by purging of nitrogen or by blowing of dehumidified compressed air till acceptance of Owner/PMC and make ready for Commissioning of pipeline section. This works includes supply of manpower, equipments & consumables (nitrogen reqiured for purging etc.), materials for all temporary works and performing all associated works, complete as per the relevant specifications, other provisions of Contract document and instructions of Engineer-in-Charge.

-

-

-

... More
Drying by continuous purging of nitrogen / blowing of dehumidified compressed air

-

-

-

... More
For 16" NB Line

7170

-

-

... More
For 12" NB Line

20160

-

-

... More
For 10" NB Line

11800

-

-

... More
For 8" NB Line

12670

-

-

... More
For 6" NB Line

3960

-

-

... More
For 4" NB Line

24740

-

-

... More
Note:The quantities mentioned above for various pipeline sections at different locations. At the time of execution except above methodology, If other methodology of drying are required as per site condition,the decision of EIC shall be final and binding to the contractor to carry out the decided drying methodology. Payment for the same shall be made to contractor as per provision of contract.

-

-

-

... More
Commissioning assistance during commissioning for underground pipeline length and stations including supply of manpower, equipments, tools & tackles, required consumables (nitrogen reqiured for purging etc.), materials for all temporary works and performing all associated works, complete as per the relevant specifications, other provisions of Contract document and instructions of Engineer-in-Charge.

-

-

-

... More
For 16" NB Line

7170

-

-

... More
For 12" NB Line

20160

-

-

... More
For 10" NB Line

11800

-

-

... More
For 8" NB Line

12670

-

-

... More
For 6" NB Line

3960

-

-

... More
For 4" NB Line

24740

-

-

... More
Note:-The quantities mentioned above for various pipeline sections at different locations.

-

-

-

... More
IDLE TIME PRESERVATION OF PIPELINE

-

-

-

... More
Preservation of pipeline sections and associated facilities (in event of delay in ROU acquisition, comissioning, other unforeseen reasons) including supply of nitrogen, all consumables, all equipment, man-power, etc. complete as per the requirements of specifications, other provisions of Contract document and instructions of Engineer-in-charge.

-

-

-

... More
By filling and pressurizing with nitrogen to a pressure of 2 bar(g) for a period of one month.

-

-

-

... More
For 16" NB Line

7170

-

-

... More
For 12" NB Line

20160

-

-

... More
For 10" NB Line

11800

-

-

... More
For 8" NB Line

12670

-

-

... More
For 6" NB Line

3960

-

-

... More
For 4" NB Line

24740

-

-

... More
For every additional period of one month or part thereof

-

-

-

... More
For 16" NB Line

7170

-

-

... More
For 12" NB Line

20160

-

-

... More
For 10" NB Line

11800

-

-

... More
For 8" NB Line

12670

-

-

... More
For 6" NB Line

3960

-

-

... More
For 4" NB Line

24740

-

-

... More
Note:- i) The quantities mentioned above for various pipeline sections at different locations. ii) All accessrious ie;Two nos. of dished end caps and two nos tappings of 3/4 inches,PG to be considered per section and rate for the same shall be quoted by bidder under this item. iii) If month is partially complete, payment shall be made on prorata basis.

-

-

-

... More
DIGITIZATION OF RADIOGRAPHY FILMS:

-

-

-

... More
Carrying out digitization of all radiographic films (mainline and terminal piping) in the form of digital images (which can then be archived safely for long life and electronic retrieval) complying to all the legal local rules, codes and international standards.Submission of digital images of radiographic film along with compatible software in 6 sets of CD/DVD/Pendrive for electronic viewing /retreival.

-

-

-

... More
For 16" NB Line

1882

-

-

... More
For 12" NB Line

5645

-

-

... More
For 10" NB Line

3136

-

-

... More
For 8" NB Line

3450

-

-

... More
For 6" NB Line

941

-

-

... More
For 4" NB Line

6900

-

-

... More
DIGITIZATION AND DEVELOPMENT OF GIS SURVEY- TAKING DGPS COORDINATES FOR GIS MAPPING

-

-

-

... More
Digitisation and Development of GIS Survey -Pipeline data identification of as-buit assets, by taking through high precision equipments like DGPS/Total station, DGPS coordinates of each weld joint (including tie in joints), Valve pits, Valves, TLP, markers, assets/attributes of the land Five (5) meters on either side of the laid pipeliene e.g., electric poles, buildings, bridges etc., major & minor crossings and plotting the geographical information in KML files/shape files in GIS compatible form including all attributes of asstes and handing over of the same to the owner for GIS mapping. The coordinates must have X,Y,Z (ground level) along with depth of cover.

-

-

-

... More
For 16" NB Line

7170

-

-

... More
For 12" NB Line

20160

-

-

... More
For 10" NB Line

11800

-

-

... More
For 8" NB Line

12670

-

-

... More
For 6" NB Line

3960

-

-

... More
For 4" NB Line

24740

-

-

... More
VIDEOGRAPHY & PHOTOGRAPHY

-

-

-

... More
Carrying out the videography & Photography of the each construction activities for all the pipeline sections.

-

-

-

... More
Videography & photography of the entire route prior to construction activities i.e. pipeline route, location of various stations, Tap-off Point, all crossing like road / railways, river, etc.

-

-

-

... More
Videography & photography during construction activities of Mainline Works i.e. Stringing, Welding, Radiography, Joint Coating, Lowering, Backfilling, etc. performing all works as per specification of EIC and other provision of contract document.

-

-

-

... More
For 16" NB Line

3585

-

-

... More
For 12" NB Line

10080

-

-

... More
For 10" NB Line

5900

-

-

... More
For 8" NB Line

6335

-

-

... More
For 6" NB Line

1980

-

-

... More
For 4" NB Line

12370

-

-

... More
GROUND PENETRATING RADAR

-

-

-

... More
Carrying out subsurface utility survey along the proposed pipeline route and/ or as specified by Engineer-In-Charge for provided corridor ( 2-5 meter) using Ground Penetrating Radar (GPR) for depth upto 5m below the existing ground level to locate and identify all existing underground utilities/buried objects including but not limited to pipelines, sewers, conduits, cables, drains, manholes, appurtenances etc in the proposed corridor along with location, DGPS coordinates, depth, shape and dimensional details of utilities. Four (4) Copies of Report and Drawings incorporating all collected datas shall be submitted as per scope of work and direction of the Engineer-in-charge. Scale of Drawing shall be Planimetry (X Axis 1:1000, Y Axis 1:100), Longitudinal Section (Z Axis 1:100) and Transverse Section at critical location.

41000

-

-

... More
Note :-

-

-

-

... More
1.Survey Agency for execution of GPR Survey Work to be engaged by the Contractor, prior approval of which shall be obtained from OWNER before starting of work.

-

-

-

... More
2. GPR Work shall be carried out in presence of Contractor's Representative.

-

-

-

... More
Payment shall be made to the contractor as per the following terms: 1) 40% on mobilization of team at site 2) 50% on final submission of Reports and Drawings incorporating all collected datas and comments given by EIC. 3) 10% payment on acceptance of the system by Owner/PMC and after closure of contract.

-

-

-

... More
TRIAL PITS

-

-

-

... More
Excavation of trial pits on pipeline route (min Size 1.5 Mtr x 1.0 Mtr.) or any other Location as per instruction of engineer incharge in all kinds of underground strata up to existing laid pipeline without damaging pipe coating.Barricating the trial pit area including application of warning tape /warning sign around the trial pit till the necessary checking & backfilling of same as per direction of Engineer Incharge.Cleaning of excavated pipe & other underground facilities including supply of all materials (except Owner supplied materials), consumables, equipment, labour, etc. for carryout the reffered work as per directions of the Engineer-in-charge.

160

-

-

... More
NOTE:- Quantity mentioned above is for the various locations within the GA and may increase/decrease or not to be executed based on site requirement.

-

-

-

... More
Gauging (Applicable during carrying out main steel pipeline hydrostatic test, Pre & Post installation hydrostatic test.)

-

-

-

... More
As per specification and procedure approved by Engineer–in–charge (EIC)/ RCM.

-

-

-

... More
Specified dia Thk (mm) Material Coating Type Length of each pipe (mm) NB

-

-

-

... More
406.4 7.1 API 5L Gr. X-56 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

3000

-

-

... More
323.9 6.4 API 5L Gr. X-56 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

9000

-

-

... More
273 6.4 API 5L Gr. X-56 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

5000

-

-

... More
219.1 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

5500

-

-

... More
168.3 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

1500

-

-

... More
114.3 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

11000

-

-

... More
NOTE- (i) The quantities mentioned against the above SOR items are tentative and may vary depening upon the site condition during execution stage. (ii) The total quantities mentioned against the above SOR items are applicable for main steel pipeline and multiple/various crossings at different locations. (iii) Payment for above item shall be made only for the certified executed length of pipeline by Engineer–in–charge (EIC)/ RCM. (iv) The requirement of gauging of main steel pipeline, prehydrotest & after pulling of HDD section/ crossing by open-cut (Conventional) method/ cased crossings/ moling with casing, if feasible as per site condition/ geomatry of pipeline section shall be carried out as per MECON specification / OISD / PNGRB regulation and same shall be decided & approved by Engineer–in–charge (EIC)/ RCM.

-

-

-

... More
Post Installation Hydrostatic testing of Pipeline Section for obstacle crossings encountered in the proposed pipeline route

-

-

-

... More
Carrying out cleaning, gauging, pigging and post installation hydrostatic testing of complete pipeline section laid by HDD method/ Cased Crossing (by HDD/moling/Boring/Open Cut) as approved by EIC/RCM to specified pressures (i.e. 1.5 times of the design pressure) for 24 hours holding period; providing all equipment, pumps, test headers, fittings, instruments, dead weight tester, pressure recorder, tempearature recorder , pressure & temperature gauge etc., and services, supervision, labour, consumables, water including supply of corrosion inhibitor, air, etc. as required for successful completion of hydrotesting of pipeline to acceptance criteria as per specifications, codes, approved drawings, calculations, methods and as directed by Engineer-in-charge and provision of contract document. Complete dewatering and swabbing of the pipeline as per specification and to the entire satisfaction of the EIC/RCM.

-

-

-

... More
As per specification and procedure approved by Engineer–in–charge (EIC)/ RCM.

-

-

-

... More
406.4 7.1 API 5L Gr. X-56 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

690

-

-

... More
323.9 6.4 API 5L Gr. X-56 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

2070

-

-

... More
273 6.4 API 5L Gr. X-56 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

1150

-

-

... More
219.1 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

1265

-

-

... More
168.3 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

345

-

-

... More
114.3 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

2530

-

-

... More
NOTE- (i) The quantities mentioned against the above SOR items are tentative and may vary depening upon the site condition during execution stage. (ii) The total quantities mentioned against the above SOR items are applicable for main steel pipeline laid through HDD method and for multiple/various crossings at different locations. (iii) Payment for above item shall be made only for the certified executed length of pipeline by Engineer–in–charge (EIC)/ RCM. (iv) The requirement of Post Installation of Hydrostatic testing of main steel pipeline laid through HDD method and after pulling of HDD section/ crossing by open-cut (Conventional) method/ cased crossings/ moling with casing, if feasible as per site condition/ geomatry of pipeline section shall be carried out as per MECON specification / OISD / PNGRB regulation and same shall be decided & approved by Engineer–in–charge (EIC)/ RCM.

-

-

-

... More
i) The quantities mentioned against the above SOR items are tentative and may vary depening upon the site condition during excecution stage.

-

-

-

... More
ii) Payment for Gauging activity mentioned above shall be made under separate SOR item mentioned elsewhere in this SOR.

-

-

-

... More
iii)Quantity indicated above against each item is tentative and for multiple crossings . It may increase/decrease as per site condition and approved survey details.

-

-

-

... More
Pipeline Laying Liasioning & Co-odrination (including utility crossing) and obtaining permission / NOC from the statuatory / concerned authorities. Assistance in ROU / Pipeline Route Alignment Corridor opening & closing and their maintainence/ management.

-

-

-

... More
Submitting request for (after obtaining the letter from client) permission , follow up , assisting in site inspections / route suevey / site report making/making site inspection drawings , submitting at designated offices , resubmission after correction , modification if required , soft and hard copy in nos. as required /if required in sizes , and collecting permission from the statuatory authorities including NHAI , PWD , Railways , Irrigation , Forest , Municipal Corporation, District administration, River Authority,SEZ etc. Obtaining work permits /NOC from various statutory authorities having jurisdiction before execution of the work and complying with all stipulations /conditions/recommendations of the said authorities. Only statutory fees shall be paid by the owner. Assistance in required length and width/restricted width of ROU opening & closing and their maintainence/ management both side of the crossings.

-

-

-

... More
406.4 7.1 API 5L Gr. X-56 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

7170

-

-

... More
323.9 6.4 API 5L Gr. X-56 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

20160

-

-

... More
273 6.4 API 5L Gr. X-56 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

11800

-

-

... More
219.1 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

12670

-

-

... More
168.3 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

3960

-

-

... More
114.3 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

24740

-

-

... More
NOTE- (i) The quantities mentioned against the above SOR item i.e, A002900 are tentative and may vary depening upon the site condition during execution stage. (ii) The total quantities mentioned against the above SOR items are applicable for the works carried out as mentioned above for laid, tested & commissioned or preserved with nitrogen main steel pipeline section and quantity mentioned against each SOR item is for multiple/various crossings at different locations within the GA. (iii) Payment shall be made to the contractor as per the following terms: 1) 40% on receipt of permission for laying from all the concerned authority. 2) 50% on completion of execution, restoration, Hydro testing, commissioning or line preserved with nitrogen. 3) 10% payment on acceptance of the system by Owner/PMC and after closure of contract. Rest 10% payment will be made after acceptance of the system by Owner/PMC and after closure of contract.

-

-

-

... More
De-mobilization and Re-mobilization

-

-

-

... More
De-Mobilisation of complete manpower, equipment, tools and tackles etc (in case of complete site activities are stalled or due to reasons solely attributable to owner or due to Force Majure) and remobilization of the same within 1 month including setting up of various facilities required to carry out the works as per direction of Engineer- In-charge. Time interval between any set of Demobilisation and Re-Mobilisation shall be maximum 6 months. List of various equipment and manpower to be remobilized for this purpose shall be as per APPENDIX- A and B to PJS (mechanical) respectively.

1

-

-

... More
TRANSPORTATION OF FITTINGS, FLANGES, VALVES, SKID.. ETC.

-

-

-

... More
"Receiving and taking over", handling, lifting, loading on truck, transportation and unloading of Company supplied DRS/MRS/, Metering Skids, fittings, flanges and valves ...etc from any storage yard (other than the designated storage yard for the project) to worksite / contractor's storage yard/ any other storage yard or as decided by EIC. The above work also includes stacking the DRS/MRS/Metering Skids, flanges, fittings and valves etc. properly. Above work shall be carried out as per standard drawing, specification, instruction of Owner and other provision of contract document.

15000

-

-

... More
Notes: i) The quantities given in above item no. are tentative only and shall not be considered to be binding. The quantities may be increased, decreased or deleted as per the actual site requirement and instructions / recommendations of Owner. The unit rate shall be operated to work out the final payment to the contractor.

-

-

-

... More
ii) Above price shall be inclusive of all type of taxes & duties, transit insurance during transportation & other insurance etc. including all financial & commercial implication as per the tender document. No other payment except as per quoted unit rate & executed quantities will be payable by the Owner.

-

-

-

... More
iii) Safe storage of transported material till installation shall be part of the above item.Contractor has been advised to quote accordingly.

-

-

-

... More
TRANSPORTATION OF LINE PIPE

-

-

-

... More
"Receiving and taking over", handling, lifting, loading on trailers, transportation and unloading of Company supplied line pipe from any storage yard (other than the designated storage yard for the project) to worksite / contractor's storage yard/ any other storage yard or as decided by EIC. The above work also includes stacking the pipes on wooden sleepers/ sand pads. Above work shall be carried out as per standard drawing, specification, instruction of Owner and other provision of contract document.

25000

-

-

... More
Notes: i) The quantities given in above item no. are tentative only and shall not be considered to be binding. The quantities may be increased, decreased or deleted as per the actual site requirement and instructions / recommendations of Owner. The unit rate shall be operated to work out the final payment to the contractor.

-

-

-

... More
ii) Above price shall be inclusive of all type of taxes & duties, transit insurance during transportation & other insurance etc. including all financial & commercial implication as per the tender document. No other payment except as per quoted unit rate & executed quantities will be payable by the Owner.

-

-

-

... More
iii) Safe storage of transported linepipe till installation , reconcillation & handingover to client shall be part of the above item.Contractor has been advised to quote accordingly.

-

-

-

... More
PE PIPELINE

-

-

-

... More
Pipe Laying in any type of surface like unprepared surface (Katcha surface)/ Normal Surface/ Hard surface/Rock surface etc using open cut/ Moling (without Casing)/ Moling (with Casing)/Directional Drilling technique (with and without casing pipe) methodology.

-

-

-

... More
Receipt, Loading, unloading, storing, reloading, transportation, unloading, stringing and laying of PE100, SDR11 line pipes of 125 mm including, proper stacking, identification, and supply of accessories ike PE Bends, Couplers, Endcaps, Tee, Reducer, PE Fittings Warning Mat (if required) etc. Handling, Stringing, uncoiling, aligning of the PE line pipe on the pipeline Right-of-Use / route, laying / installation,hook up with existing line of PE line pipe along with required accessories as mentioned above as per specification wherever required depending on site condition including execution of all works; Storage of material in contractor's store, fabrication, access for construction procurement and supply of all materials, consumables, equipment, labour and other inputs. In the case of free issue items, the scope also includes, receiving and loading from Owner's designated store, transportation, unloading and stacking of free issue items at Contractor's store. Laying of 125 mm PE pipe (PE 100 SDR11), Including supply of HDPE casing pipe (in case of HDD (with case), Moling (with case) , Couplers, End caps etc. Survey of underground utilities, execution of the work as per specification, including excavation of pits moling with the hole size not exceeding 20% of the pipe dia, jointing and insertion of carrier pipe with casing, testing & commissioning and restoration of the pits to original condition, submission of As-Built Graph as per specifications and the instruction of Engineer-in-charge. Casing details are as given below: - 1. 250 mm dia. HDPE Casing Pipe, PE63/80 PN 6.0).

-

-

-

... More
Carrying out all temporary, ancillary, auxiliary works required to make the PE pipeline ready for commissioning as per drawings.

-

-

-

... More
Specifications, scope of work indicated in PJS and other provisions of Contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works:

-

-

-

... More
Surveying of route and detours required at the time of execution, preparation of construction drawings showing survey details and submit same to Owner for review / approval.

-

-

-

... More
Carrying out preliminary activities such as preperation of drawings wherever required for crossing etc.

-

-

-

... More
Preparation and getting approval of schedules, execution procedures, drawings/ sketches/ wherever required, making trial pits to determine the underground utilities/ services etc., restoration of the abandoned trial pits to original condition.

-

-

-

... More
Stacking and installation of construction markers, clearing, fencing, grubbing, cutting of trees, full filling all the requirements of various statutory/ environment authorities to the entire satisfaction of concerned authorities, grading of work area.

-

-

-

... More
Barricading the work area as per local authorities norms & to the satisfaction of Owner/ Eingineer -in- charge, installation of safety signs.

-

-

-

... More
Barricading the pipeline construction area prior to execution of the works as per drawing no. MEC/23QH/05/25/M/000/011 & MEC/23QH/05/25/M/000/10 enclosed with tender document and to the entire satisfaction of owner / engineer- in -charge.

-

-

-

... More
Laying using open trench without casing includes survey of under ground utilities (through trial pits), execution of work as per specification including Trenching to all depths by excavation in all types of soils including soft/ rocky strata and different type of pavement / footpath / roads etc. including rock breaking, chiselling or otherwise cutting etc. as required and storing excavated soil, reusable materials at designated area as directed by Engineer in charge and to a width to accommodate the pipeline as per the relevant standard/ specification etc. [The minimum depth of the top of pipeline shall be 1.0 m measured from top of pipeline to the top of undisturbed surface of the soil or as per Specification/ OISD- 226 & PNGRB latest guidelines whichever is higher]. Dewatering of trenches / pits if required as per site condition. Repairing of all damaged utilities if any, and payment of any compensation (if claimed by owner / other utility agencies)

-

-

-

... More
Uncoiling, stringing & aligning of PE pipes, clamping, jointing of the pipe ends / fittings / valves by qualified personnel using approved electro-fusion techniques as per specification. Note:- Coordinates to be taken for implementation for GIS for Valve pit ,Fusion welding location.

-

-

-

... More
Installation / lowering the pipeline in trench to required depth as per PJS, Technical Specification & drawings, supply & placement of HDPE Yellow colour warning mat (refer PJS item.- 4.2) over the pipeline along the complete route as per standard drawings, data sheets & technical specifications, padding around pipeline including supply of suitable padding material duly approved by EIC, backfilling to its original condition with excavated earth / borrowed select soil/sand duly approved by EIC & its compaction & crowning. At certain specific area of ROU, trench shall be backfilled & compacted and shall be made ready for motorable. All tiles / slabs / curb stones etc removed during excavation shall be placed properly and no seperate payment shall be admissible against this activity. Restoration shall be carried as per separate SOR item mentioned elsewhere in the SOR or to be done by Owner / concerned authorities.

-

-

-

... More
The scope of work against this item also include Electro-fusion jointing of valves, fittings wherever required and as directed by Engineer-in-charge.

-

-

-

... More
Pneumatic testing, purging with nitrogen and commissioning as per specification and approved procedures providing all tools and tackles, nitrogen, instruments, manpower and other related accessories and as per the instructions of the Engineer-in-charge.

-

-

-

... More
Final clean-up of right-of-use or area disturbed by contractor during their construction activities for laying of pipeline works and disposal of debris and surplus material to designated disposal areas and backfilling of trench and compaction of the same as per satisfaction of Owner and / or as directed by Engineer–in–charge.

-

-

-

... More
Maintaining the completed pipelines and installation for any defect or failures during defect liability period

-

-

-

... More
Handing over the completed works to Owner for their operation/ use, reconciliation of material area wise and obtaining "no objection certificate" from Owner/ PMC.

-

-

-

... More
Preparation and submission of Daily progress report, Laying Graphs / PE line cards and PE fitting reports on daily basis.

-

-

-

... More
On completion of gas charging of pipelines. Preparation and submission of As-built drawings, crossings details, termination, utility graphs and deviation statements.

-

-

-

... More
In case, the minimum required depth is not possible due to site condition, necessary mitigation measures with minimum permissible top cover shall be carried out by the contractor in consultation with EIC as per PNGRB Guidelines, without any time and cost implecation to owner.

-

-

-

... More
Submission of all documents required for contract closure in numbers as mentioned in contract.

-

-

-

... More
Any other activities not mentioned / covered explicitly above, but otherwise required for satisfactory completion / operation / safety / statutory / maintenance of the works shall also be covered under the scope of work and has to be completed by the Contractor within specified schedule at no extra cost to Owner. All the work shall be executed in accordance with the provision of contract.

-

-

-

... More
180 mm PE 100 pipe

3500

-

-

... More
125 mm PE 100 pipe

21000

-

-

... More
90 mm PE 100 pipe

8000

-

-

... More
NOTE:

-

-

-

... More
The lengths of pipelines are tentative.

-

-

-

... More
For restoration of asphalt / concrete roads, the item for construction of asphalt top / concrete top / Tiles/Stone slab/Paver Blocks/Curb Stones shall be paid separately as per the rates quoted for the same elsewhere in the SOR.

-

-

-

... More
In case, contractor prefers to lay the pipeline through HDD method, contractor shall be required to lay the pipe upto a depth not more than 1.4 m.

-

-

-

... More
Installation of valve in pit including supply of valves

-

-

-

... More
Supply of isolation valves (as per data sheet) and installtion of valves in the valve pits as per typical drawing and specification enclosed and instructions of Engineer-in-charge. Payment of valve pits shall be paid separately as per SOR.

-

-

-

... More
PE Valve 180 mm dia

5

-

-

... More
PE Valve 125 mm dia

21

-

-

... More
PE Valve 90 mm dia

8

-

-

... More
Construction of Valve Pits as per the enclosed tender drawing and specification. The item includes supply of all the material including Pre-cast RCC cover, shuttering, reinforcement, labour, curing etc as per the drgs, specification and instruction of EIC.

-

-

-

... More
Type-I having Internal size of Minimum 1000 x 1000mm

15

-

-

... More
Type-II having Internal size of Minimum 600 x 600mm

19

-

-

... More
Note: The tender drawing enclosed is only for reference purpose and contractor shall be required to prepare drawings (in line with reference tender drawing) for specific sizes of Valve pits and the same shall be approved by EIC.

-

-

-

... More
ROUTE SURVEY FOR STEEL PIPELINE

-

-

-

... More
Preliminary route survey (Reconnaissance Survey): Carrying out reconnaissance survey as per Specification/Scope of work in the tender and instructions of Engineer-in-Charge and submissin of four coloured drawings and report.

82

-

-

... More
Detailed Grid Line Survey Carrying out detailed survey along proposed gas pipeline routes for a width of 30m on either side as per specifications and tender document, approved route and submit all Reports and drawingsalong with original editableCAD outputincluding all data.

82

-

-

... More
Soil Startification along Pipe Route Carrying out Soil Startification work along the pipeline route as per specification including and providing all men, tools, tackles, materials, testing equipment and other equipment other support facilities including mobilization and demobilization etc as per tender document, The boring shall be either terminated at a depth of 3 M below NGL or on top of bed rock if rock is encountered at a depth of less than 3 M. and Boreholes shall be made at intervals of 500 M along the pipeline route, at all intermediate points where there is apparently a change in the type of soil and at any other place as directed by direction of Engineer-in-Charge.

164

-

-

... More
Note for all above SOR Items code Nos. A00100 to A003600 :- (i) Quantities mentioned against all above SOR items are estimated & tentative and may vary up to any extent as per site condition and/or as per instruction of EIC. (ii) If certain documents, drawings, datasheets, specifications etc. are not included in the bid, the same will be made available to the successfull bidder. While formulating the bid, bidders are requested to quote such items based on the industry practices followed by the similar nature of industries. However procurement & installation of such items will be done as per site requirement after due approval of EIC. (iii) Laying/ installation of pipeline along with associated works mentioned in above SOR items are also to be utilized and carried out for various consumer connectivities/ extension of pipeline … etc within the Geographical Area (GA). (iv) In the above SOR items & scope of works, incase of any conflict in requirement among PJS, Technical Specification, tender documents, drawings, datasheets, latest relevant Codes & Standards, Statutory Regulation, requirement of the local authority, etc., the most stringent requirement shall govern, however decision of EIC in this regard shall be final and binding to the contractor.

-

-

-

... More
TCP WORKS

-

-

-

... More
Design, detail engineering, Manufacturing, Inspection/FAT (Factory acceptance test), supply, Packing, insurance, transportation to site, storage at site, Handling, Transportation, Loading, installation, testing & commissioning of the temporary Cathodic protection system using Mg (Min 5.0 Kg Each) galvanic anodes to protect the external surface of 16"/12"/10"/8"/6"/4" dia x 70.0 km (appox.) long 3LPE Coated pipeline, against corrosion for a design life of minimum 2 year or till commissioning of PCP system whichever is later, in the Geographical Area (GA) of Nadia, North 24 Parganas, Kolkata & South 24 Parganas Districts as per standard specification No.- MEC/S/05/E9/016A for temporary cathodic protection system, Scope of work, Data Sheets & tender drawings. Scope shall also include but not limited to the following for completion of jobs:

-

-

-

... More
Soil resistivity Survey & soil/water chemical analysis

-

-

-

... More
Measurement of soil resistivity along the right of way of the main pipeline (At 500mtr Interval at depth of 1.5M, 2.5M & 3.5M) & collection of additional data as per specification for corrosion survey MEC/TS/05/21/016C & applicable NACE standard including preparation of Design, detailed engineering, preparation of design document, preparation of Test station schedule & Bill of Material.

70

-

-

... More
Collection of soil & water samples along ROW at depth of 1M, 2M & 3M at every 5 km interval (Min 03 sample at each location) for its chemical & microbial analysis along the pipeline route as per specification for corrosion survey MEC/TS/05/21/016C & NACE Standard TM0106-2006 for detection of SRB, ARB & Total dissolved H2S etc.

14

-

-

... More
Sacrificial anodes- Pre packed Mg anodes

-

-

-

... More
Prepacked Magnesium anodes for Carrier/Casing Pipe protection (Min 5.0 Kg Each) as per tender specification (1/2/3/4 Nos. of anodes). The total nos. of anodes shall be calculated as per the corrosion survey, soil chemical analysis, total weight and current requirement of the pipeline section. However, Min one anode is to be installed at every one KM with test station.

90

-

-

... More
Supply, laying, termination, Glanding and ferruling TCP-Cables--The Cables shall be annealed high conductivity, stranded copper conductor, 650/1100V grade, XLPE Insulated & PVC Sheathed in new/existing test stations and junction boxes.

-

-

-

... More
1c x 6 mm2 - Anode tail cable - unarmored

1000

-

-

... More
1 core x 6 mm2 - Potential Measurement, TLP to pipeline, armoured

900

-

-

... More
1 core x 10 mm2 - current measurement cable & Pipeline to Test station- armoured

900

-

-

... More
1 core x 25 mm2 -Bonding, Earthing, Surge diverter, HT line, etc.

500

-

-

... More
Test Stations

-

-

-

... More
New test stations Normal Size-(Weather Proof with IP-55) as per tender drawings with name plate

80

-

-

... More
New test stations Big Size-(Weather Proof with IP-55) suitable for Polarisation Cells as per tender drawings with name plate

7

-

-

... More
All Cable to pipe connections by Exothermic Process or Pin Brazing for all sizes (Upto 1C x 25mm2) for complete TCP system of whole pipeline.

1

-

-

... More
Solid State type Polarisation cells (3.7 kA @ 30 Cycle) for HT power line crossings (66KV & above).

7

-

-

... More
20 Kg Sacrificial Zinc anodes for HT line crossing, Earthing of block valves on Cathodically Protected portion of pipeline.

14

-

-

... More
Cu-wire mitigator for AC Mitigation encased in low resistance backfill with corrosion inhibitors and braiding (M/s MATCOR make or equivalent) (20 Mtr wire shall be installed on each side of HT crossing, Cables running parallel etc).

280

-

-

... More
Solid state Surge Diverters rating 100 kA (10/350 uS) for Insulating Joints.

12

-

-

... More
HDPE sheet (Non-toxic and Rodent Resistant, 6mm thick & 5000mm wide (1200mmx5)) between the BGCL pipeline and the other CP protected foreign pipelines at the crossing locations for providing electrical isolation.

700

-

-

... More
Supply, installation, testing, commissioning of the complete earthing protection system, earth electrodes/ pit, earth main ring, earthing of electrical equipments, instrument panels, field instruments, process equipments and pipes/ flanges including all associated civil work with all material and labour as per specification and drawings approved by the company.

-

-

-

... More
Earthing Electrodes 65mm dia x 3mtr long & 4.5 mm thick GI pipe for earthing of cathodically unprotected pipeline at consumer station/DRS station/Metering skid and earthing. Total grounding resistance shall be limited to 2-3 Ohm max.

12

-

-

... More
GI Strip (50X6) mm

600

-

-

... More
GI Strip (25X3) mm

600

-

-

... More
Copper Strip (25X3) mm

50

-

-

... More
GI Wire (8mm-Stranded), Cu- wire rope (Min 8 mm dia solid) and all balance earthing material including copper strip (50 mm x 2 mm thick) jumper for flanges etc. as per the specification for all stations.

1

-

-

... More
Monitoring of the TCP system, on monthly basis, till commissioning of the permanent cathodic protection system.

24

-

-

... More
Polarisation coupons (100 mmx 100mm) with Magnetic reed switch as per NACE SP 104 with permanent ref cell.

14

-

-

... More
PIPING & MECHANICAL WORKS

-

-

-

... More
PLANT PIPING FOR UNDERGROUND/ ABOVEGROUND INSTALLATION

-

-

-

... More
Transportation including loading, unloading & handling of all piping items from Owner's and/ or Contractor's storage point to work site/ workshop as applicable, complete work of fabrication, erection, painting, testing of pipes, flanges and fittings and making ready for further Commissioning / Start-up of carbon steel piping of all sizes and ratings including supply of all consumables, equipment, manpower and other resources and execution of, but not limited to, the following works in accordance with relevant specifications & scope of work, drawings, specification and instructions of Engineer-in-charge and as per all provisions of the CONTRACT DOCUMENT.

-

-

-

... More
Fabrication including cutting, edge preparation, inclusive of grinding the edges of pipes, fittings, flanges etc. to match with the matching edges of uneven/different thickness wherever required, welding, attachment of all pipe fittings like elbows, tees, reducers. Supply of nipples, couplings,caps, plugs, gasket, stud bolts, nuts, U Clamps etc. as required for completion of job.

-

-

-

... More
Fixing/ Installation of weldolets, sockolets, flanges, vent and drain point connection etc., including providing stub-in connections, fabricated fittings and reinforcement pads etc., as required.

-

-

-

... More
Erection including prior cleaning, lifting, placing on pipe sleepers and supports, overhead on racks, skids and at all elevations including installation and carrying out connected activities for all types of valves including supply and fixing of gaskets, studs/ bolts, nuts wherever required for all sizes, levelling, aligning, joining of flanges, blind flanges, connecting with equipment, nozzles, strainers, tie-in with existing piping/facilities, etc. tapping for inline instruments like pressure gauges, thermowells, sample connection, etc.

-

-

-

... More
Preparation of final bill of material based on piping GADs.

-

-

-

... More
Preparation of isometric and fabrication drawings.

-

-

-

... More
Carrying out Non-destructive testing as required. NDT for 2'' & above shall be paid as per separate itmes mentioned elsewhere in the SOR.

-

-

-

... More
Surface preparation before application of primer by means of sand/Copper Slag blasting including supply of approved quality of sand, manpower, machineries, tools & tackles to achieve required roughness as per specification and as per instruction of Engineer-in-charge.

-

-

-

... More
Painting of entire system (including aboveground all pipes fittings, flanges and accessories) as per specification MEC/S/05/21/07 suitable for corrosive area environment including supply of approved paints and primers, application of primer and paints, indentification lettering/ numbering, colour coding, etc. as specified including rub down & touch up of shop primer or scrapping of shop primer wherever required by COMPANY and providing scafolding for all heights etc.

-

-

-

... More
Cleaning and flushing by water/ compressed air, testing of the systems including hydrostatic, pneumatic and any other type of testing as specified, draining, drying by compressed air/other methods approved by COMPANY.

-

-

-

... More
Precommissioning & making operational all piping system and equipments and provide all necessary assistance in term of supply of man-power, equipment, tools and tackles required amount of nitrogen for purging of entire terminal piping system including equipments etc. to the company during commissioning activities.

-

-

-

... More
Clean-up and restoration of site, preparation of as built drawings, documents and project records; transportation of surplus free issue material to Owner's designated plac(s); completing all works in all respects as per the AFC drawing, specifications, standards and other provisions of Contract and instruction of Engineer-in-charge.

-

-

-

... More
Completion of all such work in all respects as per scope of work and as per drawings, specifications and instructions of the COMPANY and keeping the system ready in all respects for further commissioning and start up.

-

-

-

... More
Hook-up works including making provision for hooking up and carrying out shutdown activities at terminals if necessary.

-

-

-

... More
Complete Carbon Steel Piping Work with painting including all fittings, flanges and supply of all required gaskets, studs bolts & nuts etc. as described under SOR item code.: C00101 (including its notes )

-

-

-

... More
API 5L, Gr. B, PSL-2, BE SAW (For 16" NB), S40

18

-

-

... More
API 5L, Gr. B, PSL-2 Seamless, BE (For 12" NB), S40

18

-

-

... More
API 5L, Gr. B, PSL-2 Seamless, BE (For 10" NB), STD.

12

-

-

... More
API 5L, Gr. B, PSL-2 Seamless, BE (For 8" NB), 7.9

12

-

-

... More
ASTM A106, Gr. B (Charpy), Seamless, BE (For 6" NB),S40

12

-

-

... More
ASTM A106, Gr. B (Charpy), Seamless, BE (For 4" NB), S40

120

-

-

... More
ASTM A106, Gr. B (Charpy), Seamless, BE (For 3" NB), STD

12

-

-

... More
ASTM A106, Gr. B (Charpy), Seamless, PE (For 2" NB), XS

180

-

-

... More
ASTM A106, Gr. B Seamless, PE (For 1.5" NB), XS

6

-

-

... More
ASTM A106, Gr. B, Seamless, PE (For 1" NB), XS

24

-

-

... More
ASTM A106, Gr. B, Seamless, PE (For 3/4" NB), S160

18

-

-

... More
1) Pipe Specification and thickness may vary depending upon availability of pipe. No extra payment shall be made for this. 2) All butt welded fittings end shall generally match with connecting pipe wall thickness. However, in case of misalignment, Contractor shall have to do end preparation without any extra cost. 3) All coupling, nipples etc. as required shall be suplied by contractor but no separate payments shall be made as it is covered under erection rate. 4) NDT of Joints below 2" is to be included in above rate. However, payment of radiography of joints (2" and above) shall be paid seperately under SOR item for RADIOGRAPHY mentioned elsewhere in this SOR.

-

-

-

... More
SUPPLY OF ASSORTED PIPE, FITTINGS AND FLANGES

-

-

-

... More
Complete work of supply of pipes, fittings and flanges including all taxes, duties, transportation and inspection charges but not limited to, the following items in accordance with relevant specifications indicated in clause of SCC & scope of work indicated in SCC, drawings, specification and instructions of Engineer-in-charge and as per all provisions of the CONTRACT DOCUMENT.

-

-

-

... More
Handling including lifting, transportation from Contractor Stores to CONTRACTOR's workshop for fabrication and/ or to work site for field fabrication and erection for all piping items supplied by Contractor.

-

-

-

... More
CARBON STEEL PIPES

-

-

-

... More
API 5L, Gr. B, PSL-2, BE SAW (For 16" NB), S40

18

-

-

... More
API 5L, Gr. B, PSL-2 Seamless, BE (For 12" NB), S40

18

-

-

... More
API 5L, Gr. B, PSL-2 Seamless, BE (For 10" NB), STD.

12

-

-

... More
API 5L, Gr. B, PSL-2 Seamless, BE (For 8" NB), 7.9

12

-

-

... More
ASTM A106, Gr. B (Charpy), Seamless, BE (For 6" NB),S40

12

-

-

... More
ASTM A106, Gr. B (Charpy), Seamless, BE (For 4" NB), S40

120

-

-

... More
ASTM A106, Gr. B (Charpy), Seamless, BE (For 3" NB), STD

12

-

-

... More
ASTM A106, Gr. B (Charpy), Seamless, PE (For 2" NB), XS

180

-

-

... More
ASTM A106, Gr. B Seamless, PE (For 1.5" NB), XS

6

-

-

... More
ASTM A106, Gr. B, Seamless, PE (For 1" NB), XS

24

-

-

... More
ASTM A106, Gr. B, Seamless, PE (For 3/4" NB), S160

18

-

-

... More
FLANGES, Weld Neck (B-16.5, A105(Charpy), 125 AARH, RF) [End Thickness to match pipe thickness], 300#

-

-

-

... More
16"

2

-

-

... More
12"

2

-

-

... More
10"

2

-

-

... More
8"

2

-

-

... More
6"

4

-

-

... More
4"

30

-

-

... More
3"

6

-

-

... More
2"

48

-

-

... More
Socket Welded (B-16.5, A105, 125 AARH, SW end to B16.5)

-

-

-

... More
1.5"

2

-

-

... More
1"

10

-

-

... More
¾"

25

-

-

... More
Blind Flanges (B-16.5, A105 (Charpy), 125 AARH, RF), 300#

-

-

-

... More
16"

2

-

-

... More
12"

2

-

-

... More
10"

2

-

-

... More
8"

2

-

-

... More
6"

4

-

-

... More
4"

30

-

-

... More
3"

6

-

-

... More
2"

48

-

-

... More
Blind Flanges (B-16.5, A105, 125 AARH, RF), 300#

-

-

-

... More
1.5"

2

-

-

... More
1"

10

-

-

... More
¾"

25

-

-

... More
ELBOW - 90° (A234, Gr. WPB (Charpy), B-16.9, 1.5D), BW

-

-

-

... More
16" -S40

2

-

-

... More
12"- S40

2

-

-

... More
10"- STD

2

-

-

... More
8"- 7.9

2

-

-

... More
6"- S40

4

-

-

... More
4"- S40

28

-

-

... More
2"- XS

42

-

-

... More
Elbow- 45° (A234, Gr. WPB (Charpy), B-16.9, 1.5D), BW

-

-

-

... More
16" -S40

2

-

-

... More
12"- S40

2

-

-

... More
10"- STD

2

-

-

... More
8"- 7.9

2

-

-

... More
6"- S40

10

-

-

... More
4"- S40

12

-

-

... More
2"- XS

10

-

-

... More
TEE, Equal / Reducing Tee (A234, Gr. WPB (Charpy), B-16.9, 1.5D), BW

-

-

-

... More
16" - S40

2

-

-

... More
12" - S40

2

-

-

... More
10" - S40

2

-

-

... More
8" - 7.9

2

-

-

... More
6" - S40

2

-

-

... More
4" - S40

20

-

-

... More
2" - XS

15

-

-

... More
4'' x 2''- S40xXS

10

-

-

... More
BARRED TEE (As per Standard Specification and Data Sheets enclsoed) (Bevel end thickness of run & branch size to match with connecting pipe thickness)

-

-

-

... More
20" x 20"- As per Data sheet

1

-

-

... More
20" x 16" - As per Data sheet

1

-

-

... More
20" x 12" - 15.9 x S40

1

-

-

... More
20" x 10" - 15.9 x STD

1

-

-

... More
20" x 8" - 15.9 x 7.9

1

-

-

... More
20" x 6" - 15.9 x S40

4

-

-

... More
20" x 4" - 15.9 x S40

4

-

-

... More
16" x 16" - S40 x S40

1

-

-

... More
16" x 12" - S40 x S40

1

-

-

... More
16" x 10" - S40 x STD

1

-

-

... More
16" x 8" - S40 x 7.9

2

-

-

... More
16" x 6" - S40 x S40

4

-

-

... More
16" x 4" - S40 x S40

2

-

-

... More
12" x 12" - S40 x S40

1

-

-

... More
12" x 10" - S40 x STD

1

-

-

... More
12" x 8" - S40 x 7.9

1

-

-

... More
12" x 6" - S40 x S40

1

-

-

... More
12" x 4" - S40 x S40

15

-

-

... More
10" x 10" - STD x STD

1

-

-

... More
10" x 8" - STD x 7.9

1

-

-

... More
10" x 6" - STD x S40

2

-

-

... More
10" x 4" - STD x S40

4

-

-

... More
8" x 8" - 7.9 x 7.9

1

-

-

... More
8" x 6" - 7.9 x S40

1

-

-

... More
8" x 4"- 7.9 x S40

4

-

-

... More
8" x 2"- 7.9 x S40

10

-

-

... More
6" x 6" - S40 x S40

2

-

-

... More
6" x 4" - S40 x S40

2

-

-

... More
4" x 4" - S40 x S40

5

-

-

... More
4" x 2" - S40 x S40

18

-

-

... More
SOCKOLET (A105, SW), 6000#

-

-

-

... More
16" x ¾"

2

-

-

... More
12" x ¾"

1

-

-

... More
10" x ¾"

2

-

-

... More
8" x ¾"

2

-

-

... More
6" x ¾"

2

-

-

... More
4" x ¾"

10

-

-

... More
2" x ¾"

10

-

-

... More
16" x 1"

2

-

-

... More
12" x 1"

3

-

-

... More
10" x 1"

2

-

-

... More
8" x 1"

2

-

-

... More
6" x 1"

2

-

-

... More
4" x 1"

2

-

-

... More
16" x 1.5"

1

-

-

... More
12" x 1.5"

2

-

-

... More
10" x 1.5"

1

-

-

... More
8" x 1.5"

2

-

-

... More
6" x 1.5"

2

-

-

... More
4" x 1.5"

2

-

-

... More
WELDOLET (A105 (Charpy), BW)

-

-

-

... More
16"x4" - S40 x 7.9

2

-

-

... More
12"x8" - S40 x 7.9

1

-

-

... More
12"x4" - S40 x S40

10

-

-

... More
10"x4" - S40 x S40

2

-

-

... More
8"x4" - 7.9 x S40

2

-

-

... More
8"x2" - 7.9 x S40

4

-

-

... More
6"x2" - S40x S40

4

-

-

... More
4" x 2" - S40 x S40

10

-

-

... More
4" x 3" - S40 x STD.

2

-

-

... More
3" x 2" - STD.x XS

2

-

-

... More
INSULATING JOINTS (As per Standard Specification and Data Sheets enclosed), 300#

-

-

-

... More
20"

1

-

-

... More
16"

1

-

-

... More
12"

1

-

-

... More
10"

2

-

-

... More
8"

2

-

-

... More
6"

2

-

-

... More
4"

10

-

-

... More
2"

10

-

-

... More
Reducer (A 234 Gr. WPB (Charpy), BW)

-

-

-

... More
16"x12"-S40x S40

2

-

-

... More
16"x10"-S40x STD

2

-

-

... More
16"x8"-S40x7.9

2

-

-

... More
12"x8" - S40 x 7.9

2

-

-

... More
12"x4" - S40 x S40

2

-

-

... More
10"x8" - STD x 7.9

2

-

-

... More
8"x6" - 7.9XS40

2

-

-

... More
6"x4" - S40XS40

2

-

-

... More
8"x4" - 7.9 x S40

22

-

-

... More
4" x 2" - S40 x S40

10

-

-

... More
4" x 3" - S40 x STD.

2

-

-

... More
3" x 2" - STD.x XS

2

-

-

... More
End Caps (A 234 Gr. WPB (Charpy), BW)

-

-

-

... More
16"- S40

4

-

-

... More
12" - S40

4

-

-

... More
10"-STD

4

-

-

... More
8"- 7.9 mm

4

-

-

... More
6"-S40

4

-

-

... More
4" -S40

4

-

-

... More
2"-XS

2

-

-

... More
Note: i) All butt welded fittings end shall generally match with connecting pipe wall thickness however in case of misalignment Contractor shall have to do end preparation without any extra cost.

-

-

-

... More
ii) All coupling, nipples etc. as required shall be supplied by contractor but no separate payments shall be made as it is covered under erection rate.

-

-

-

... More
Supply of Valves

-

-

-

... More
Complete work of supply of valves including all taxes,duties,transportation and inspection charges but not limited to ,the following items in accordance with relevant Specifications & relevant Data Sheets indicated in scope of work indicated in SCC, drawings, specification and instructions of EIC and as perall provisions of the CONTRACT DOCUMENT.

-

-

-

... More
Plug Valves

-

-

-

... More
Butt Welded End (As per PMS & Datasheet), 6",300#

2

-

-

... More
Butt Welded End (As per PMS & Datasheet), 4",300#

6

-

-

... More
Butt Welded End (As per PMS & Datasheet), 2",300#

28

-

-

... More
Ball Valves

-

-

-

... More
Fully Welded Body, Butt Welded End, Full Bore (As per PMS & Datasheet),16", 300#

2

-

-

... More
Fully Welded Body, Flanged End, Full Bore (As per PMS & Datasheet) ,16", 300#

2

-

-

... More
Fully Welded Body, Butt Welded End, Full Bore (As per PMS & Datasheet),12", 300#

6

-

-

... More
Fully Welded Body, Flanged End, Full Bore (As per PMS & Datasheet) ,12", 300#

2

-

-

... More
Fully Welded Body, Butt Welded End, Full Bore (As per PMS & Datasheet),10", 300#

4

-

-

... More
Fully Welded Body, Flanged End, Full Bore (As per PMS & Datasheet) ,10", 300#

2

-

-

... More
Fully Welded Body, Butt Welded End, Full Bore (As per PMS & Datasheet),8", 300#

4

-

-

... More
Fully Welded Body, Flanged End, Full Bore (As per PMS & Datasheet) ,8", 300#

2

-

-

... More
Fully Welded Body, Butt Welded End, Full Bore (As per PMS & Datasheet),6", 300#

4

-

-

... More
Fully Welded Body, Butt Welded End, Reduced Bore (As per PMS & Datasheet),6", 300#

4

-

-

... More
Fully Welded Body, Flanged End, Full Bore (As per PMS & Datasheet) ,6", 300#

2

-

-

... More
Fully Welded Body, Butt Welded End, Full Bore (As per PMS & Datasheet),4", 300#

38

-

-

... More
Fully Welded Body, Butt Welded End, Reduced Bore (As per PMS & Datasheet),4", 300#

18

-

-

... More
Fully Welded Body, Flanged End, Full Bore (As per PMS & Datasheet) ,4", 300#

2

-

-

... More
Butt Welded End, Full Bore (As per PMS & Datasheet),2", 300#

48

-

-

... More
Flanged End, Full Bore (As per PMS & Datasheet) ,2", 300#

10

-

-

... More
Socket Welded End, Full Bore (As per PMS & Datasheet),1", 800#

6

-

-

... More
Socket Welded End, Full Bore (As per PMS & Datasheet) ,¾", 800#

30

-

-

... More
Globe Valves

-

-

-

... More
Flanged End (As per PMS & Datasheet) ,6", 300#

4

-

-

... More
Flanged End (As per PMS & Datasheet) ,4", 300#

8

-

-

... More
Flanged End (As per PMS & Datasheet) ,2", 300#

6

-

-

... More
Butt Welded End (As per PMS & Datasheet) ,6", 300#

1

-

-

... More
Butt Welded End (As per PMS & Datasheet) ,4", 300#

1

-

-

... More
Butt Welded End (As per PMS & Datasheet) ,2", 300#

1

-

-

... More
ERECTION OF VALVES ( As per P & ID )

-

-

-

... More
Handling including lifting and transportation from COMPANY's warehouse to CONTRACTOR'S Stores and/or work site and installation of all types of valves including assembly of valve accessories, (if any) by bolting, threading or welding, supply and insertion of gaskets, nuts & bolts, nipples, etc. at all elevations of pipe sleepers, supports or overhead on racks, equipments nozzle, skid & painting etc. supply of all consumables, manpower, equipment, etc. for completion of all works as per scope of work and as per drawings, specifications and instructions of Engineer-in-charge including servicing/ cleaning of valve wherever requried.

-

-

-

... More
Welded Valves (Full Bore/ Reduced Bore)

-

-

-

... More
Ball / Plug/Globe Valves,16",300#

1

-

-

... More
Ball / Plug/Globe Valves,12",300#

1

-

-

... More
Ball / Plug/Globe Valves,10",300#

1

-

-

... More
Ball / Plug/Globe Valves, 8",300#

4

-

-

... More
Ball / Plug/Globe Valves, 6",300#

6

-

-

... More
Ball / Plug/Globe Valves, 4",300#

20

-

-

... More
Ball / Plug/Globe Valves, 2",300#

20

-

-

... More
Flanged End Valves (Full Bore/ Reduced Bore)

-

-

-

... More
Ball / Plug/Globe Valves,16",300#

1

-

-

... More
Ball / Plug/Globe Valves,12",300#

1

-

-

... More
Ball / Plug/Globe Valves,10",300#

1

-

-

... More
Ball / Plug/Globe Valves, 8",300#

1

-

-

... More
Ball / Plug/Globe Valves, 6",300#

1

-

-

... More
Ball / Plug/Globe Valves, 4",300#

10

-

-

... More
Ball / Plug/Globe Valves, 2",300#

20

-

-

... More
Sockolet Welded Valve

-

-

-

... More
(Ball / Plug / Valves),1", 800#

6

-

-

... More
(Ball / Plug / Valves),¾", 800#

20

-

-

... More
FIELD INSTRUMENTS

-

-

-

... More
Supply of Pressure Gauges inclusive of supply of erection accessories as per data sheet.

20

-

-

... More
Installation, Calibration, Testing & Commissioning of Pressure Gauges inclusive of supply of necessary piping materials/tubings alongwith all necessary valves & fittings, fabrication and installation of impulse lines/manifolds & hydraulic testing as per installation standard no. MEC/05/E5/SD/PG/004

20

-

-

... More
Note: Quantities mentioned against each above sub-item of SOR Item no. 5.0 are tentative and may increase or decrease during execution of work depending upon site requirement. Contractor required to supply materials after assessing the site requirement and in multiple lot or as per Release Order/ Sub Purchase Order wise. All material either in multiple lot or as per Release Order/ Sub Purchase Order wise or as decided by EIC shall be supplied by bidder within the quoted price.

-

-

-

... More
RADIOGRAPHY

-

-

-

... More
Performance of radiographic inspection by gamma radiation as per scope of work and as per specifications in piping of all types and thickness including providing/hiring of all necessary equipments, supply of all consumables, and whatever else even though not expressely mentioned but required to perform the work as per specifications and instructions of Engineer-in-Charge (full circle re-radiography of the repaired joint and additional radiography necessitated due to poor performance of contractor's welder shall be carried out by the Contractor at his own cost and shall not be paid extra by Company). Radiographs shall be submitted to the Engineer-in-Charge for acceptance, whose decision shall be final and binding.

-

-

-

... More
Radiography by Gamma Rays,16"

24

-

-

... More
Radiography by Gamma Rays,12"

24

-

-

... More
Radiography by Gamma Rays,10"

24

-

-

... More
Radiography by Gamma Rays,8"

36

-

-

... More
Radiography by Gamma Rays,6"

48

-

-

... More
Radiography by Gamma Rays,4"

90

-

-

... More
Radiography by Gamma Rays,2"

120

-

-

... More
ERECTION OF SKIDS & OTHER EQUIPMENTS

-

-

-

... More
Handling, including lifting, transportation from Company's stores to Contractor's work-shop for fabrication or/ and to worksite for field fabrication, assembly of parts/ sub-assemblies, erection for all Metering skids/DRS/MRS/Compressors, equipments supplied by company above ground/ underground at all elevation/ depth, fixing of foundation bolts, welding wherever required, aligning, grouting, hooking-up, cleaning and flushing by water draining, drying by compressed air, providing all mountings, ancilliary, enabling works as required and completing in all respect as per drawings, specification and instruction of Engineer-in-charge. Contractor's scope shall include supply of all material and accessories including but not limited to any fixtures, clamps, gasket, nut bolts, finish coat of painting including rub down & touch up of shop primer/ paint scrapping of shop primer/ paint and further their painting after application of primer as per specification, wherever required by Company.

-

-

-

... More
Details of equipment are as under

-

-

-

... More
Metering Skids/ MRS/DRS/DCU-cum-DRS Compressors.. ...etc

50

-

-

... More
1) Payment of above ground Piping fabrication works cover in above SOR items shall be paid under SOR item code.: C00101 (including its notes )

-

-

-

... More
2) The quantity mentioned against above SOR item are for multiple equipment having different weight and weight of each eqipment shall be maximum upto 10.0 MT. The each equipment shall be installed at different location within the GA.

-

-

-

... More
PIPE SUPPORTS & OTHER STRUCTURES

-

-

-

... More
Supply, fabrication and erection of all types of pipe supports like clamps, saddle, guide stops, cradles, turn buckles, anchors, T-posts; stockade/ trestle and pipe bridge for overhead piping; frames for canopy, approach ladders and platforms, crossover, cable tray supports, etc. including painting suitable for highly corrosive area as per specification, labour and supervision & complete work as per drawings, specifications and instruction of Engineer-in-charge. (Bolts, nuts, washers, U-clamps etc. for supporting shall be supplied by the Contractor within the rates quoted. These items will not be measured and will not be paid seperately). The work is to be completed in all respect as per scope of work and specification.

10

-

-

... More
NOTE: 1) The quantities given above against individual items are indicative and shall not be considered to be binding. The quantities may be increased, decreased or deleted at site at the time of actual execution. Procurement shall be done as per actual site condition, approved construction drawings and as per instruction of Engineer-in-charge. The unit rate shall be operated to work out the final payment to the contractor.

-

-

-

... More
2) In each area, quantities given against individual item may be utilise/ used for other consumer in same area.

-

-

-

... More
3) The rates quoted shall be applicable for all underground/ aboveground piping system and associated stations/ terminals.

-

-

-

... More
Note for all above SOR Items code Nos. C00100 to C001700 :- (i) Quantities mentioned against all above SOR items are estimated & tentative and may vary up to any extent as per site condition and/or as per instruction of EIC. (ii) If certain documents, drawings, datasheets, specifications etc. are not included in the bid, the same will be made available to the successfull bidder. While formulating the bid, bidders are requested to quote such items based on the industry practices followed by the similar nature of industries. However procurement & installation of such items will be done as per site requirement after due approval of EIC. (iii) Installation of all underground/ aboveground piping system along with associated works mentioned in above SOR items are also to be utilized and carried out for various consumer connectivities/ extension of existing piping system … etc with in the Geographical Area (GA). (iv) In the above SOR items & scope of works, incase of any conflict in requirement among PJS, Technical Specification, tender documents, drawings, datasheets, latest relevant Codes & Standards, Statutory Regulation, requirement of the local authority, etc., the most stringent requirement shall govern, however decision of EIC in this regard shall be final and binding to the contractor.

-

-

-

... More
CIVIL WORKS

-

-

-

... More
TOPOGRAPHICAL SURVEY

-

-

-

... More
To carry out detailed Topographic Survey covering specified plots/area of CNG/LCNG Station/RO , any other locations from approved agency and as directed by Engineer in Charge using survey instruments and giving complete details in the form of drawings (in the scale of 1:100) and reports in 4 copies on white paper sheets and CAD output on CD/DVD all complete as per specifications, drawings and direction of the Engineer-in-Charge.

7200

-

-

... More
GEOTECHNICAL INVESTIGATION

-

-

-

... More
Carrying out Drillling holes of 150mm dia. in all type of soil by shell and auger method upto a max. depth required or refusal strata (REFUSAL means when N 100 for 30 cms of penetration) including recording of water table (if met with within the depth drilled) after completion of boring and conducting the required laboratory tests ( See Note ) from NABL or equivalent accredated labarotary as per ISO/IEC 17025 and as directed by Engineer in Charge including providing all manpower, tools, tackles, materials, survey equipments, drilling rigs, soil testing equipment, other equipments, other support facilities necessary for the survey and associated work and submitting Final Geotechnical Report (along with the soft copy) incorporating all field and laboratory data and recommending the type of foundation and the safe bearing pressure and/or Load bearing capacity of Pile (See Note) for the proposed sites, Drawings, Data etc. (One Lot) in an approved format drawings, approved QAP, implementation schedule and other provisions of the Tender Document and instructions of the Engineer-in-charge.

-

-

-

... More
0-10m or Refusal

15

-

-

... More
Note :-

-

-

-

... More
1. Required Laboratory Test such as natural moisture content, liquid limit, plastic limit, shrinkage limit, dry and bulk density, specific gravity, particle size distribution by sieve and hydrometer analysis, triaxial compression test (undrained), permeability test, chemical test on soil samples and water samples, differential free swell test and direct shear test all as per Technical Specifications and direction of Engineer-in-Charge.

-

-

-

... More
2. Safe bearing pressure at 1.5m , 2.0m and 2.5m below ground or at other depths for open and raft foooting.

-

-

-

... More
3. Geotechnical design for pile up to 500mm dia, 30T Capacity end bearing/ skin friction type shall be recommended if required.

-

-

-

... More
4. Existence of black cotton soil with swelling property and swelling index shall be reported with remedial measures.

-

-

-

... More
5. RQD value of under laying strata encountered, shall be reported.

-

-

-

... More
SITE CLEARANCE

-

-

-

... More
DEMOLITION OF R.C.C./BRICKS/STONE MASONARY Site clearance by demolition of R.C.C./PCC/Brickwork/Stone Masonry/Stone Soling, Flexible pavements etc. along with removing the debris and disposal of unserviceable material to any lead and staking of serviceable materials, handing over serviceable material to concerned department if required as per technical specifications and direction of Engineer-in-charge.

25

-

-

... More
Note:

-

-

-

... More
1. Rate includes cost of all labour, tools, tackles, hire charges, royalties, levies, leads, loading/unloading, transportation, water, electric power, illumination etc. complete in all respects as per scope of work, detailed construction drawings, technical specifications and direction of Engineer-in-charge.

-

-

-

... More
2. Demolition of RCC/PCC/Brick Masonry/Road will be paid in NET CUM after deductions for air voids as demolished.

-

-

-

... More
CLEANING VEGETATION Cleaning bushes including uprooting of rank vegetation, green bush wood, trees and saplings of girth upto 30cms (measured at a height of 1m above ground), stacking the serviceable materials and disposal of the same including rubbish etc. upto any lead and all lift as per specification and direction of the Engineer-n-charge. (payment will be made for actual site clearance area only).

1200

-

-

... More
TREE CUTTING Tree cutting (only of girth more than 30 cm above 1m above ground) along with removal of roots and stumps and handing over the same to Owner / Owner's Representative including paying royalties, disposal, taking approval from competent authorities etc. all complete, as per technical specifications and direction of Engineer-in-charge.

10

-

-

... More
Note:

-

-

-

... More
1.Rate includes cost of all labour, tools, tackles, hire charges, royalties, levies,loading/unloading, transportation, electric power, illumination and cost of handingover to owner/or his representative etc. complete in all respects as per scope of workand direction of Engineer-in-charge.

-

-

-

... More
EARTH WORK IN EXCAVATION AND BACKFILLING

-

-

-

... More
Earthwork in excavation for foundations in ordinary soils including soft rock / disintegrated rock in both dry and wet conditions including pumping and bailing out surface and subsoil water, shoring, strutting, slush removal including backfilling in all positions in layers of 300mm at all heights and depths as per drawings and specifications wherever required, in Foundation pits and other places with excavated suitable surplus earth including reclaiming from spoil heaps kept within the plot including dressing and levelling, watering and mechanical compaction etc.,transporting surplus unserviceable soil upto any lead and spreading in layers and as per specifications and direction of Engineer in charge. The Measurement for payment shall be for the theoretical volume only and it shall be the volume of the block of the excavation having maximum bottom dimension of the levelling course/PCC as per drawing and to actual depth.

-

-

-

... More
For depth upto 2.0 m.

600

-

-

... More
For depth beyond 2.0 m

100

-

-

... More
Note:

-

-

-

... More
1. The Contractor shall take into account in his rate, the provision for excess excavation required for necessary working space, cutting in slopes etc., which may be required for excavation and other allied works and refilling the side slopes and working space in layers as per requirement.

-

-

-

... More
EARTH WORK IN EXCAVATION/ SITE GRADING IN HARD ROCK

-

-

-

... More
Earth work in excavation in hard rock for all type and size of foundations in any plan dimension up to required depth including disposal of excavated material up to any lead in all conditions, and disposal of surplus and unserviceable material. Surface to be leveled and neatly dressed complete in all respect as per scope of work, detailed construction drawings and directions of the Engineer-in-charge. The Measurement for payment shall be for the theoretical volume only and it shall be the volume of the block of the excavation having maximum bottom dimension of the levelling course/PCC as per drawing and to actual depth.

50

-

-

... More
Note:-

-

-

-

... More
1. The Contractor shall take into account in his rate, the provision for excess excavation required for necessary working space, cutting in slopes etc., which may be required for excavation and other allied works as per requirement.

-

-

-

... More
EARTH WORK IN FILLING

-

-

-

... More
Supply and Controlled earth filling with good quality imported earth from approved source under floors and other places with special compaction to achieve dry density of 95% standard proctor density as per instruction of the Engineer at all heights/depths upto any lead transporting, depositing, compacting and dressing, trimming complete as desired in layers not exceeding 30cm including watering, consolidating by mechanical means as per specifications and instructions of the Engineer.

1200

-

-

... More
1. Rate to include cost of all labour, tools, tackles, equipment, hire charges, cost of sand, right of way, cess, and backfilling using sand in all conditions, etc.

-

-

-

... More
SAND FILLING

-

-

-

... More
Supplying and filling approved quality coarse sand/M sand (Zone II or Zone III) in foundation or under floor, trenches, pits and other places, at all locations in layers of 150 mm thickness including watering and ramming, all lead, lift and depth complete as per drawing and specification and direction of the Engineer.

25

-

-

... More
Note:

-

-

-

... More
1. Rate to include cost of all labour, tools, tackles, equipment, hire charges, cost of sand, right of way, cess, and backfilling using sand in all conditions, etc.

-

-

-

... More
PLAIN CEMENT CONCRETE

-

-

-

... More
PLAIN CEMENT CONCRETE 1:2:4 (M 15) Supplying and laying plain cement concrete of grade 1:2:4 (M 15) with stone aggregate 20mm down grade (including shuttering if required) in foundations, floors, roof screed, aprons, pits, drains and other mass concrete works, steps, coping of wall, sill etc., at all depths and heights/levels as per drawings, specifications and directions of the Engineer-in-charge.

20

-

-

... More
Note: Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials, OPC/PPC cement, shuttering in all conditions etc. with all bye works and sundry works.

-

-

-

... More
PLAIN CEMENT CONCRETE 1:3:6 (M 10) Supplying and laying plain cement concrete of grade 1:3:6 (M 10) with stone aggregate 40mm down grade (including shuttering if required) in all levelling courses under foundations, mass concrete works,road works, chambers, trenches,floors and any other locations at all depths complete in all respects as per drawings, specifications and directions of the Engineer-in-charge.

120

-

-

... More
Note: Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials, OPC/PPC cement, shuttering in all conditions etc. with all bye works and sundry works.

-

-

-

... More
REINFORCED CEMENT CONCRETE IN SUBSTRUCTURE

-

-

-

... More
Providing and Laying in position Machine batched and machine mixed Design mix/ Ready mixed for Reinforced Cement Concrete work of grade M-25 using 20mm down size graded aggregate at all depths and heights in substructure using cement content as per approved design mix manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of RMC as applicable, including cost of centering, shuttering and admixtures in recommended proportions as per IS: 9103 to accelerate/retard setting of concrete (improve workability without impairing strength and durability) but excluding cost of reinforcement as per direction of Engineer-in-charge. Mechanical mixers with Hopper along with Weigh Batcher shall also be permitted for use at site with the approval of Engineer-Incharge to produce Design Mix Concrete of specified grade.

250

-

-

... More
Note: 1. Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as, minimum 43 grade OPC cement/PPC cement including sulphate resistant cement if required, coarse and fine aggregates, admixtures, other minor construction materials, testing of concrete, curing etc. with all bye works complete. 2. The reinforcement shall be paid separately vide respective item.

-

-

-

... More
REINFORCED CEMENT CONCRETE IN SUPERSTRUCTURE

-

-

-

... More
Providing and Laying in position Machine batched and machine mixed Design mix/ Ready mixed for Reinforced Cement Concrete work of grade M-25 using 20mm down size graded aggregate at all depths and heights in superstructure using cement content as per approved design mix manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of RMC as applicable, including cost of centering, shuttering and admixtures in recommended proportions as per IS: 9103 to accelerate/retard setting of concrete (improve workability without impairing strength and durability) but excluding cost of reinforcement as per direction of Engineer-in-charge. Mechanical mixers with Hopper along with Weigh Batcher shall also be permitted for use at site with the approval of Engineer-Incharge to produce Design Mix Concrete of specified grade.

90

-

-

... More
Note: 1. Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as, minimum 43 grade OPC cement/PPC cement including sulphate resistant cement if required, coarse and fine aggregates, admixtures, other minor construction materials, testing of concrete, curing etc. with all bye works complete. 2. The reinforcement shall be paid separately vide respective item.

-

-

-

... More
REINFORCEMENT STEEL

-

-

-

... More
Supplying, Fabricating and Fixing in position TMT Grade Fe 500D reinforcement conforming to IS1786 at all levels and positions including the cost of transport, straightening, cutting, bending, cranking, welding, provision of necessary chairs and spacers, preparation of bar bending schedule and getting the same approved by EIC etc., complete as per drawings and specifications and including cost of binding wire, labour, testing etc., all complete in all respects as per detailed construction drawings, technical specifications and direction of Engineer-in-charge. The chairs and spacer bars provided will not be measured for payment.

55

-

-

... More
Note:

-

-

-

... More
1. Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as reinforcement steel, binding wire etc. with all bye works and sundry works complete.

-

-

-

... More
2. Chairs, Unauthorised Laps, Spacers, Binding wire, Wastage etc. shall be to contractor's account.

-

-

-

... More
BRICK WORK IN SUBSTRUCTURE

-

-

-

... More
Providing and laying BRICK WORK straight or curved on plan to any radius using best quality bricks with frog/indent, conforming to sub-class A as per IS:1077 having crushing strength of not less than 50 kg/cm2 in cement mortar 1 :4 (1 Cement : 4 Coarse Sand) in all types of foundation and substructure work at all depths/heights including projections, pillars, parapets, ornamentals of any shape, cornices, all complete including cut work, curing, scaffolding,including filling of joints with Cement Mortar 1:4 and racking of joints, etc. as per specifications, drawings and directions of the Engineer.

50

-

-

... More
Note:

-

-

-

... More
Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade cement (OPC/PPC), bricks, finishes, weep holes, other minor construction materials, shuttering, staging, masonry work, etc. as per requirement with all bye-works and sundry works complete as per drawings.

-

-

-

... More
BRICK WORK IN SUPERSTRUCTURE

-

-

-

... More
Providing and laying BRICK WORK straight or curved on plan to any radius using best quality bricks with frog/indent, conforming to sub-class A as per IS:1077 having crushing strength of not less than 50 kg/cm2 in cement mortar 1 :4 (1 Cement : 4 Coarse Sand) in all types superstructure work at all depths/heights including projections, pillars, parapets, ornamentals of any shape, cornices, all complete including cut work, curing, scaffolding,including filling of joints with Cement Mortar 1:4 and racking of joints, etc. as per specifications, drawings and directions of the Engineer.

80

-

-

... More
Note:

-

-

-

... More
Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade cement (OPC/PPC), bricks, finishes,other minor construction materials, shuttering, staging, masonry work, as per requirement with all bye-works and sundry works complete as per drawings.

-

-

-

... More
BOUNDARY WALL (Superstructure)

-

-

-

... More
Providing, constructing and finishing of compound wall in RCC frame structure with 300mmx350mm column size at an interval of 3.0 m or as specified and height 2.1m with infill brick masonry 230 thk , 900mm high Y angle frames with Concertina coils and RBT tape as specified as per scope of work and detail construction drawings, including plastering, coping, painting, whitewash,concertina coil, finishes all complete as per technical specifications and direction of the Engineer-In-Charge. Note: 1. Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade OPC/PPC cement, RCC M25,Reinforcement steel , concertina coil finishes, bitumen, Y angle, other minor construction materials, shuttering, staging, coping, expansion gap filling with "Capcell" armoured board and white sealant material, plastering,painting and all other sundry works. 2.Foundation/ sub-structure to be paid separately vide respective item. 3. To be read with in conjunction with Particular Job Specification and tender drawing no. MEC/05/11/C/STD/CGD/002.

35

-

-

... More
PAVER BLOCK FLOORING

-

-

-

... More
Supplying and placing in position as per approved pattern of Cement Concrete Inter locking/grass jointed paver block 80 mm thick of approved shape, rough finish, M-40 strength of approved brand laid over the sand bed of minimum 50 mm thick. The CC interlocking blocks to be of uniform Grey colour or as approved by EIC complete in all respects as per scope of work, detailed construction drawings, technical specifications and directions of the Engineer-in-charge.

800

-

-

... More
Note :-

-

-

-

... More
1. Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such paver blocks, sand, earth work in excavation in cutting earth in all conditions, shuttering with all bye works and sundry works.

-

-

-

... More
2.PCC below paver shall be paid separately vide respective item.

-

-

-

... More
PLASTERING

-

-

-

... More
Providing and applying 15 mm thick cement plaster 1 : 4 (1 cement : 4 medium coarse sand) smooth finish at all depths & heights on faces of walls, pillars, projection, bands, etc., including raking out joints if any left out, necessary dabbing, curing, scaffolding complete at all heights as per specification and drawings.

200

-

-

... More
Note:

-

-

-

... More
Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade cement (OPC)/PPC cement, coarse sand and other minor construction materials as per requirement with all bye-works and sundry works complete as per drawings.

-

-

-

... More
PRE CAST COVERS

-

-

-

... More
Providing, hoisting and fixing up precast reinforced cement concrete of M-25 grade (20mm nominal size) in trenches, pits, tanks and the like including the cost of required centering, shuttering (with smooth surface) complete but excluding cost of reinforcement.

10

-

-

... More
Note :-

-

-

-

... More
1. The reinforcement shall be paid separately vide respective item.

-

-

-

... More
INSERTS

-

-

-

... More
Supplying, Fabricating, Fixing at all levels and positions Steel embedments/ Inserts like Plates, Angle, Channels, Anchor boxes, MS pipe Sleeves including threading etc., including two coats of approved quality Synthetic enamel paint over a primer coat on the exposed Surfaces wherever necessary, complete as per Drawings, Specifications and directions of the Engineer-in-charge. (Jigs, Templates and Fixtures will not be paid seperately).

100

-

-

... More
BOLTS

-

-

-

... More
Supplying and Fixing BOLTS & NUTS as per IS: 2062 /SAE 1018 with minimum yield strength of 250 MPA in concrete at all levels and positions, bolts with nuts and washers, pipe sleeves etc. including painting the exposed surfaces with two coats of approved paint, providing grease to exposed area of bolts, welding wherever necessary, complete as per drawing, specifications and instruction of engineer(PCC blocks, jigs and fixtures will not be paid extra) and protecting the same till final erection.

50

-

-

... More
GROUTING

-

-

-

... More
Providing and laying a ready mix non-shrink cementitious grout of compressive strength of 30 N/mm2 under equipment base plate, anchor holes, etc. at all levels complete in all respects as per specifications, drawing and direction of the Engineer.

2

-

-

... More
BOULDER SOLING

-

-

-

... More
Providing and laying 115 to 150 mm thickness dry trap rubble stone (granite/basalt) soling at all depths including hand packing, filling the interstices with chips, spalls and binding with grit and selected murrum, watering, compaction by hand ramming & rolling with 1 MT hand roller etc. complete as per attached job procedures, technical specification and as per direction of EIC.

32

-

-

... More
Painting (APEX / Weather coat / Weather shield)

-

-

-

... More
Supplying and applying 3 coats of Apex paint of Asian paints/ Weather coat of Berger paints/ Weather shield of ICI paints on external walls surfaces in approved colour at all heights as per scope of work and recommendations of manufacturer including surface preparation, primer putty etc. detailed construction drawings , technical specifications and directions of the Engineer-In-Charge.

400

-

-

... More
[Rate to include priming coat of putty, scaffolding, tools & tackles consumables etc complete.]

-

-

-

... More
Painting (OBD)

-

-

-

... More
Supplying and finishing internal walls and ceilings in plaster of paris punning to achieve an even finish and applying 3 coats of Oil Bound Distemper of Asian paints/ Berger/ICI brand in approved colour including surface preparation, primer, putty etc. as per scope of work, detailed construction drawings , technical specifications and directions of the Engineer-In-Charge.

450

-

-

... More
[Rate to include priming coat putty, POP punning, scaffolding, tools & tackles etc complete. ]

-

-

-

... More
White washing

-

-

-

... More
White washing with Dehradun/Rajasthan lime in 3 or more coats to give an even finish including the cost of adding required adhesive (DDL), blue pigment (Robin Blue) etc. on walls, ceiling etc. complete in all respects as per scope of work, detailed construction drawings , technical specifications and directions of the Engineer-in-charge.

450

-

-

... More
[Rate to include whitening, scaffolding, tools & tackles etc complete. ]

-

-

-

... More
STEEL STRUCTURAL WORKS

-

-

-

... More
Supply, fabrication & erection of Steel structure

-

-

-

... More
Supplying, Fabricating & Erecting in position steel structures fabricated from MS rolled section conforming to IS:2062 and/or from pipes conforming to IS:1161 for cascade supporting structures, loading/unloading platform, MS Gratings, Cat Ladder, handrails, hoardings for signages, LCV stand, etc. or any other structures required as per constructon drawings for completion of works, including surface preparation by mechanical cleaning including application of one coat of Zinc phosphate primer of DFT 35 microns at shop, second coat of Zinc phosphate primer of DFT 35 microns at site after erection and two coats of finishing paint of synthetic enamel of DFT 25 microns each per coat at site, including loading, transportation and unloading delivery at erection site of all fabricated structures, storage and handling at site, site assembly and finally erection of structures at appropriate location, alignment and welding of all structures true to line, level, plumb and dimension. The work shall be completed in all respect as per drawings, technical specification and direction of the Engineer-in-Charge.

10000

-

-

... More
Providing and Fixing Fencing Structure

-

-

-

... More
Supplying, fabricating & fixing of steel structural fencing fabricated from pipes conforming to IS:1161 and plates conforming to IS:2062 & fixing of GI weldmesh made from 3mm GI wire @ 75 mm bothways to structural steel frame by means of welding/bolting, including surface prepartion by mechanical claening including application of two coats of approved quality of synthetic enamel paint over a two coat of primer in approved shade including loading, transportation and unloading delivery at erection site, of all fabricated structures ,storage and handling at site, site assembly and finally erection of structures at appropriate location, alignment and welding of all structures true to line, level, plumb and dimension including making pokets & pouring with PCC (1:2:4) in of block 500x500x500 for fixing of posts etc complete as per drawing, technical specifications,scope of works and directions of the Engineer-In-Charge.

450

-

-

... More
Fencing height 2.1m

-

-

-

... More
Providing and Fixing Fencing Gates

-

-

-

... More
Supply, fabrication & fixing of fencing gates fabricated from pipes conforming to IS:1161, plates conforming to IS:2062 & fixing of GI weldmesh made from 3mm GI wire @ 75 mm bothways to structural steel frame by means of welding/bolting, locking arrangement, etc., including surface prepartion by mechanical claening including application of two coats of approved quality of synthetic enamel paint over two coats of primer in approved shade including loading, transportation and unloading delivery at erection site of all fabricated structures, storage and handling at site, site assembly and finally erection of structures at appropriate location, alignment and welding of all structures true to line, level, plumb and dimension including making pokets & pouring with PCC (1:2:4) in block of size 500x500x500mm for fixing of posts etc. complete as per drawings, technical specifications, scope of works and directions of the Engineer-In-Charge.

-

-

-

... More
4m Wide x 2.1m High

8

-

-

... More
2m Wide x 2.1m High

2

-

-

... More
Total Amount (Rs.) (excluding GST)

-

-

-

... More
GST (CGST&SGST/UTGST or IGST) in percentage (%) on Total {@18% on sl.no. 827}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.