Uttarakhand Power Corporation Limited Tender
... More
The UPCL has issued a formal invitation for competitive bids for the Uttarakhand Power Corporation Limited project, for Construction Of Lt And Ht Line With Dtr Substations To Avoid Low Voltage Problem In Various Villages Of Munsyari Section Under Edd Dharchula in Pithoragarh, Uttarakhand, with an estimated contract value of Rs. 31,35,000. The bid opening date for this tender is 03-04-2025 and the last date for bid submission is 15-04-2025. Interested bidders for Uttarakhand Power Corporation Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Uttarakhand Power Corporation Limited - UPCL Tender
Opening Date3 Apr 2025
Closing Date15 Apr 2025
Tender Amount₹ 31,35,000
Costs
EMD
₹ 75,000Document Cost
₹ 2,360Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_UPCL3_82319_1Bid Award Id
ViewTender No
04/EDC(P)/2025-26Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://https://www.upcl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
T/F 11/0.4 KV 25 KVA
8
-
-
... More
PROVIDING AND LAYING IN POSITION CEMENT CONCRETE OF SPECIFIED GRADE EXCLUDING THE COST OF CENTERING AND SHUTTERING - ALL WORKS UPTO PLINTH LEVEL (I) 1:4:8 (1 - CEMENT;4 - COARSE SAND; 8 - GRADED STONE AGGREGATE 40MM NOMINAL SIZE).( FOUNDATION
-
-
-
... More
Steel pole 8.5 mtr. SP-21 (BPHD)
73
-
-
... More
Exavation of earth for stay pit size 0.6x0.6x1.2 mtrin all types of soil including proper dressing of sides and ramming of bottom including getting out the excavted soil and disposelof surplus and disposel of surplus excaveted soll as directed complete work.
138.67
-
-
... More
Mounting & fixing of LA set(3 No) on double pole structure including making all connection vy GI strip size 35x6 mm to earth point(incuding cost of GI strip)
9
-
-
... More
Laying, spreading, stringing and sagging of LT line of the following wire as phase wire with G.I. wire complete with binding and jumoering as per RESSPO specn
-
-
-
... More
Fixing,tightining and nozzaling of stay with pole and stay rod on required tension as per drawing /resspo manual for 11KV line
281
-
-
... More
Mounting/fixing of TPMO on doble pole structure including making of connection complete work.
9
-
-
... More
Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cem ent concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling le
-
-
-
... More
Steel pole 8.5 mtr. SP-23 (BPHD)
100.22
-
-
... More
Grouting of stay in size 0.6x0.6x0.3 in cc ratio 1:4:8 block including cost of cement sand and stone ballast back filling of soil and boulders in pit and ramming and proper allignment leveling as per resspo construction manual(16X0.108)
34.67
-
-
... More
Steel pole 8.5 mtr. SP-23 (BPHD)
131
-
-
... More
Installation/Mounting following T/F on old D/P structure and fixing of channel and making all connections of HT and LT and its complete commissioning.
-
-
-
... More
H.P stone filling in back of walls including cost of all materials, royality,T& P etc. Complete
-
-
-
... More
Cartage of Steel poles from store centre to construction site with loading & unloading at both points approx distance 71-100 Km
-
-
-
... More
Route clearance by cutting of tree branches/ proning, loping and chopping of trees for 11 KV line
9.55
-
-
... More
Mounting/fixing of fuse set on doble pole structure including making of connection complete work.
9
-
-
... More
Steel pole 8.5 mtr. SP-21 (BPHD)
55.85
-
-
... More
Erection & earthing of support with MS Earth rod of 2.5 Mtr long incuding exavation of pit and digging of MS rod proper depth and connecting the earth electrode with the GI wire as per instruction manual
81
-
-
... More
ACSR Weasel conductor 3 Phase 4 Wire
2.7
-
-
... More
Steel pole 8.5 mtr. SP-21 (BPHD)
73
-
-
... More
Laying, spreading, stringing and sagging of 11 KV line in 3 P 4 W of the Rabbit conductor with GI earth wire complete including fixing of all accessories in 3 Nos conductor in parallel with binding and jupering as per profile and sagging chart
6.55
-
-
... More
11KV DOUBLE POLE(0.34X3)
1.02
-
-
... More
SP-23 (with CC) Double Pole
59
-
-
... More
Exavation of earth for pole pit of size 0.9x0.9x1/6 of full lenth of polestay pit size 0.6x0.6x1.2 mtrin all types of soil including proper dressing of including proper dressing of sides and ramming of bottom including getting out the excavted soil and disposelof surplus and disposel of surplus excaveted soll as directed complete work.
-
-
-
... More
11KV DOUBLE POLE(4.96X3)
14.88
-
-
... More
11KV DOUBLE POLE(06.72X3)
20.16
-
-
... More
Other material
166
-
-
... More
Other material
166
-
-
... More
11KV DOUBLE POLE(1.66X3)
4.98
-
-
... More
Steel pole 8.5 mtr. SP-23 (BPHD)
131
-
-
... More
SP-21 (with CC) Single Pole
73
-
-
... More
Steel pole 8.5 mtr. SP-23 (BPHD)
33.6
-
-
... More
T/F 11/0.4 KV 16 KVA
1
-
-
... More
Erection of pole support as per RESSPO specification of the following types of poles in boulder mixed soil, grouting of support in CC 1:4:8 block incuding cost of ballast,cement and sand, back filling of soil and boulders in pit and ramming filling of accessories of the pole, leveling and erection of pole
-
-
-
... More
Fabriction of MS Channel, angle iron after cutting in requeired sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc as per RESSPO
2922
-
-
... More
ACSR Weasel conductor 1 Phase 2 Wire
0.3
-
-
... More
Earthing of distribution T/F incuding digging of pit of size 2.5 mtr depth and make hole of size 150mm. Placing of earthing electrode(to be supplied by contractor as per drawing No A) as drawing B, connecting the same with GI strip(to be supplied by contractor) of size 35x6 mm as per drawing C for a minimum length 6 mm, treatment of soil with highly conductive subustance as per IS 30343 complete in all respect, result of earthing resistance to be recorded in MB before and after instalation of earthing. the earth resistance after earthing should be less then 1 Ohm.
9
-
-
... More
Head load cartage of following material from road to site approx distance 4.0 Km
-
-
-
... More
T/F 11/0.4 KV 16 KVA
1
-
-
... More
T/F 11/0.4 KV 16 KVA
1
-
-
... More
Grouting of pole in size 0.45x0.45x1/6 of the supprt in cc ratio 1:4:8 block including cost of cement sand and stone ballast back filling of soil and boulders in pit and ramming and proper allignment leveling as per resspo construction manual
-
-
-
... More
LABOUR CHARGE
-
-
-
... More
EXCAVATION IN FOUNDATION FOR RETAINING, BREAST WALLS ETC., IN ALL TYPE OF SOILS AND ROCKS INCLUDING ALL LEAD, LIFT AND DISPOSAL OF SURPLUS MATERIAL AS PER DIRECTION OF ENGINEER-IN-CHARGE AS PER DRAWING AND TECHNICAL SPECIFICATIONS CLAUSE 305.1 OFMORD SP
-
-
-
... More
Steel pole 8.5 mtr. SP-21 (BPHD)
19.37
-
-
... More
SP-23 (with CC) Single Pole
13
-
-
... More
CEMENT PLASTER WORK
-
-
-
... More
11KV DOUBLE POLE(19.60X3)
58.8
-
-
... More
Muffing of poles with CC1;3;6 block and 45 Cm hight from ground level including cost of ballast, cement & sand
204
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements