Uttar Pradesh Power Transmission Corporation Limited Tender

View complete overview of Uttarakhand UPPTCL Tender

Uttar Pradesh Power Transmission Corporation Limited - UPPTCL Tender

Works
Civil Works Others
Eprocure
Opening Date7 May 2020
Closing Date11 Jun 2020
Tender Amount₹ 22,44,365 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Add to Item No.1 & 2 above for every additional 30 Meters lead or part of 30 Meters or for every additional 1.5 M lift of part of 1.5 Metres. ( CSI NO. 4.06 )

2017

-

24

... More
Local Fine sand of 1.25 F.M. filling in plinth including supply of necessary quantity of sand from a river/canal nearest to the site of work including watering, ramming and dressing etc. Rate to include cost of all materials, labour and T&P etc. required for proper completion of work.(csi 4.08)

37

-

1430

... More
Concrete with 4cm gauge down graded Stone ballast, coarse sand (F.M. 1.8 to 2.5) and cement in proportion of 12:6:1 in foundation and under floors and supply of all materials, labour, tools and plants etc. required for proper completion of the work. (CSI No. 5.01)

46.8

-

5200

... More
Concrete with 4cm gauge down graded Stone ballast, coarse sand (F.M. 1.8 to 2.5) and cement in proportion of 8:4:1 in foundation and under floors and supply of all materials, labour, tools and plants etc. required for proper completion of the work. (CSI No. 5.02)

4

-

5570

... More
Cement concrete with 2cm gauge Stone ballast, coarse sand and cement in the proportion 1:2:4 including supply of all materials, labour and T&P etc. required for proper completion of work(CSI No. 5.03)

17.2

-

6800

... More
RCC work with cement, approved coarse sand and 2cm (3/4”) gauge approved stone ballast in the proportion of 1:1.5:3. For slab excluding supply of reinforcement and its bending but including its cutting, fixing and binding the same with 24 B.W.G. G.I. wire including necessary centering and smooth shuttering etc required for proper completion of work including supply of all material, binding wire, labour and T&P etc. (CSI No. 5.10)

0.1

-

10840

... More
RCC work with cement, approved coarse sand and 2cm (3/4”) gauge approved stone ballast in the proportion of 1:1.5:3 in the raft & faoundation excluding supply of reinforcement and its bending but including its cutting, fixing and binding the same with 24 B.W.G. G.I. wire including necessary centering and smooth shuttering etc required for proper completion of work including supply of all material, binding wire, labour and T&P etc. ( CSI NO. 5.14 )

56.75

-

7750

... More
RCC work with cement, approved coarse sand and 2cm (3/4”) gauge approved stone ballast in the proportion of 1:1.5:3 in the T-beam, columns and walls upto 1.50mt. Ht. ( Only web of T or L beam shall be measured.) excluding supply of reinforcement and its bending but including its cutting, fixing and binding the same with 24 B.W.G. G.I. wire including necessary centering and smooth shuttering etc required for proper completion of work including supply of all material, binding wire, labour and T&P etc. (CSI No. 5.16)

22

-

12010

... More
Concreting of 40 mm thick R.C.C. trench cover of mild steel frame work with CC 1:1.5:3 in cement coarse sand, 12 mm down graded stone ballast with smooth finishing on both top and bottom surfaces matching with floor colour complete with all labour, materials, T&P etc. required for proper completion of the work but excluding cost of cover of steel frame. (CSI No. 5.17)

26.8

-

450

... More
Placing of trench cover of all size in proper position including transporting from different places within the s/s area including all labour T&P etc. required for proper completion of the work as per direction of Engineer-in charge. (CSI No. 5.19)

84

-

6

... More
Providing cement concrete with cement, approved coarse sand (F.M. 1.5 to 2.5) and 12 mm gauge down graded approved stone ballast in the proportion of 1:1.5:3 in the grouting of Edge of trenches including necessary centering and shuttering etc. including supply of all materials, labour and T&P etc. required for proper completion of work. (CSI No. 5.21)

4

-

8980

... More
1st class brick work in 1:4 cement and coarse sand of 2.25 F.M. mortar in foundation and plinth including supply of all material, labour and T&P etc. required for proper completion of work. (CSI No. 6.02)

78.5

-

4930

... More
Mild steel or iron work in heavy small section like (J/U) hooks, holding down bolts, hold fast, tie rod, record recks, door/window frame, trench recks & edges, angle post etc. (when not included in overall rates) wrought to required form including supply of steel bolts, nuts, wastage etc. and their fixing charges, welding, required for proper completion of the work. (CSI No. 9.01)

0.9

-

69440

... More
Mild steel or iron work in heavy large size sections such as trusses, built-up gates, roof work, window/boundry grill or railing, trench covers, grating, T/F rail etc. wrought to required form including supply of steel bolts, nuts, wastage etc. and their fixing charges, welding, required for proper completion of the work.(CSI No. 9.02)

1.1

-

72870

... More
As above item in 18 but in case the steel supplied by department free of cost.(CSI No. 9.02A)

0.05

-

35250

... More
T.M.T. or Tor Steel in plain work such as reinforced concrete or reinforced brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage, bend, hooks, and authorized overlapping as required for proper completion of the work.(CSI No. 9.04)

4.2

-

69410

... More
Supply of 28 mm dia M.S. Anchor bolts (conforming to IS 266) 900 mm. Long with base plate (75x75x6mm) welded with anchor bolts inclduing its threading upto a length of 10cm and also supply of a pair of standard nuts with therading including supply of 5mm thick washer and cost of labour material and T&P etc. required for proper completion of the work. (CSI No. 9.09)

144

-

710

... More
Fixing and grouting the Anchor bolts 28mm dia to 32mm dia in proper alignment level and setout with the help of a template complete including supply of all labour & T&P etc. requiired for proper completion of the work. (CSI No. 9.10)

144

-

105

... More
Supply of 25 mm dia. M.S Anchor bolts (conforming to IS-266) 500 mm long with base plate (50x50x6 mm) welded with anchor bolts, including its threadng up to a length of 10 cm and also supply of a pair of standard nuts with theading including supply of 5mm thick washer and cost of labour material and T&P etc. required for proper completion of the work. (CSI No.9.11)

140

-

380

... More
Fixing and grouting the 25mm dia and below size Anchor bolt in proper alignment level and setout with the help of a template including supply of all labour T&P etc. reqd. for proper completion of the work. (CSI No. 9.12)

140

-

85

... More
Placing of template in position, level and alignment for grouting of Anchor bolt in main gantry (Labour only). (CSI NO. 9.18)

6

-

175

... More
As item No.26 but for Auxillary Structures. (CSI NO. 9.19)

18

-

60

... More
Fixing and grouting of trench edging and rack in proper level and alignment including cost of all labour and T&P etc required for proper completion of the work but excluding cost of C.C.(csi 9.20)

270

-

14

... More
12mm thick plaster with cement mortar of 1 part cement & 4 parts of approved coarse sand 2.5 F.M. in 1:4 over Brick work, min. thickness not less than 10mm including supply all material, labour and T&P required for proper completion of work. (CSI No. 11.05)

160

-

176

... More
Champhering the edge of concrete 35mm wide triangular section at the junction of concrete foundations and trench edging etc.as per direction of E/I, inclduing cost of all material labour and T&P etc. required for proper completion of the work (CSI No. 11.15)

170

-

21

... More
Rendering, smoothening and proper finishing with cement mortar/slurry (mortar 1:2 cement and coarse sand) in horizontal and vertical surface of foundations/roof etc. as per direction of E/I inclduing supply of all material labour and T&P etc. required for proper completion of wrok. (CSI No. 11.16)

5

-

160

... More
25mm thick 1:2:4 cement concrete floor with cement, approved coarse sand and 20mm graded stone aggregate laid in panels finished with 3mm floating coat of neat cement, over base concrete. Rate includes cost of all materials, labour and T&P required for proper completion of work but excluding cost of base concrete. (CSI No. 12.01)

39

-

251

... More
Painting or varnishing on iron works in small areas of new wood work with one coat of ready mixed priming paint and one coat of approved superior quality ready mixed paint of clear synthetic varnish including supply of all materials, labour and T&P etc. required for proper completion of the work. Paint to be used should confirm to the ISI no. 103-1950. (CSI No. 13.01)

100

-

62

... More
Same as in item 32 above but for every coat after Ist coat. (CSI No. 13.02)

100

-

32

... More
Dismantling plastered or unplastered brick work or stone masonry work in lime or cement mortar and inclduing stacking of materials as directed by Engineer-in-charge within a distance of 60 meters.(CSI 15.01)

0.5

-

420

... More
Dismantling cement concrete or brick or granolithic floor, inclduing base concrete as and where required including stacking of dismantled material as directed by Engineer-in-charge within a distance of 60 meters. (CSI No.15.03)

10

-

48

... More
Cutting and chipping of R.C.C. work in small works and at senstive places and highly alert zones smoothly and gently with pneumatic drilling with sharp chiesel/bit of required size or mannualy and also cutting of reinforcement bars by gas cutter as per direction of E/I including disposal of refuse outside the periphery of corporation area inclduing cost of all labour, T&P, gas, plant etc. required for proper completion of work.(CSI NO.15.11)

0.7

-

2412

... More
Providing and Laying 80 mm thick factory made Vibratory Interlocking C.C. tile M-25 grade over prepared subgrade with 50 mm thick fine sand layer making joints filled properly and finished in proper level and alignment including cost of all material, labour and T&P required for proper completion of work as per direction of E/I.(csi no 17.13)

625

-

890

... More
Brick work with old or dismantled bricks in 1:6 cement and coarse sand mortar in (230mm) thick wall in foundation and other place including cost of all materials, labour and T&P etc. required for proper completion of work. (22.04)

0.5

-

2350

... More
Dismentalling and resoling brick on edge / intrlocking tile floor with existing old bricks/tile laid dry joints filled with sand including preparation of base to proper slope and camber, its ramming including supply of labour, T&P etc. (Labour only)(CSI No. 22.03)

5

-

138

... More
Providing and fixing of P.V.C. pressure pipe (10 Kg/sq.cm.) for water supply mains with specials such as tee, bend, socket, elbow etc. including cutting of pipe wherever necessary and including excavation of trenches (450x600) mm for laying the pipe line and including its back filling after testing the pipe line including watering, ramming etc. complete including disposal of surplus earth from the site up to 100m as per direction of E/I including supply of all material, labour, T&P etc. required for proper completion of work. (A) 110 mm dia P.V.C. pipe(CSI No.24.48)

10

-

500



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.