Public Works Department Tender

... More
The PWD has issued a formal invitation for competitive bids for the Public Works Department project, for Preparation Of Dpr As Per Departmental Sop For Construction Of Class-a Loading Bridge Over Saryu River With Motor Road At Salla To Pancheshwar In Pithoragarh Assembly Constituency Of Pithoragarh District, Under Cm Announcement 106/2024. in Pithoragarh, Uttarakhand. The bid opening date for this tender is 26-03-2025 and the last date for bid submission is 16-04-2025. Interested bidders for Public Works Department tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.

Public Works Department - PWD Tender

Opening Date26 Mar 2025
Closing Date16 Apr 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free

GEM & Bid Advisory Services

Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of 0.60 m wide trace cut as per Technical Specification Clause 1602.3 of MORD specifications

6

-

-

... More
Geological Investigation and submission of report

1

-

-

... More
A) Feasibility Study (14%)

-

-

-

... More
Preparation of Design and Drawings of Foundation and Sub Structure including submission of design report and drawings in hard and soft copy formats.

1

-

-

... More
dzkl lsD'ku ysus dk dk;ZA

6

-

-

... More
Preparation of Land Acquisition Case including forest land transfer case

1

-

-

... More
,y lsD'ku cukus dk dk;ZA

6

-

-

... More
Other Miscellaneous Items

1

-

-

... More
ou Hkwfe gLrkukUrj.k ds izi= rS;kj djuk ,oa jSatj] Mh0,Q0 vks0 dUtjosVj QkjsLV ls vuqeksnu ds gLrk{kj djkuk] ;k=k O;; lfgr

6

-

-

... More
dEikl loZs dk;Z

6

-

-

... More
Preparation and Submission of various DPR Reports (Inception Report, Preliminary Project Report, Draft Detailed Project Report, Final Detailed Project Report)

1

-

-

... More
Construction of Level Pillars

6

-

-

... More
Hydrological Investigation, Analysis and Design including preparation and submission of design report.

1

-

-

... More
Soil Testing, Geological Survey , Traffic Assesment etc.

6

-

-

... More
D) Preparation of Reports and Land Acquisition Cases (6%)

-

-

-

... More
Vsflax dk dk;Z A

6

-

-

... More
dzkl lsD'ku cukus dk dk;ZA

6

-

-

... More
uki Hkwfe dk eqvkotk] o`{kksa dk eqvkotk] Hkouksa dk eqvkotk izi= rS;kj djuk

6

-

-

... More
?kkV Vsflax ,oa lejs[k.k dk dk;ZA

6

-

-

... More
Mh0ih0vkj0 rS;kj djus gsrq e; lkexzh A

6

-

-

... More
C) Design of Superstructure and Bearings including vetting from reputed technical institute or agency finalized by the Client (30%)

-

-

-

... More
fMtkbfuax dk;Z A

6

-

-

... More
lkexzh losZ dk;Z gsrq A

6

-

-

... More
B) Geotechnical Investigation and Design of Foundation and Substructure including vetting from reputed technical institute or agency finalized by the Client (50%)

-

-

-

... More
D) Preparation of Reports and Land Acquisition Cases (6%)

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.