Disaster Management And Rehabilitation Department Tender

View complete overview of Uttarakhand Disaster Management And Rehabilitation Department Tender

Disaster Management And Rehabilitation Department Tender

Services
Other Consultancy Services
Consultancy Services
Eprocure
Opening Date20 Feb 2024
Closing Date11 Mar 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Geological mapping of the whole town on 1:2000 scale. Engineering geological mapping of all the Grids on 1:1000 scale(all the conditions mentioned in clause3.4 of RFP are inclusive in the item). Mobilisation of necessary equipnment,men & materials to the project site for carrying out the Geological Investigation and demobilisation of the same after completion of all the field works etc.

7.56

-

-

... More
GEOPHYSICAL SURVEY

-

-

-

... More
Electrical Resistivity Tomography (ERT) of 500m each in 29 grids (1 no, sounding per 5 m)(all the conditions mentioned in clause3.5 of RFP are inclusive in the item)and submission of factual report.Mobilisation of necessary equipnment,men & materials to the project site for carrying out the Geophysical Investigation and demobilisation of the same after completion of all the field works etc.

14500

-

-

... More
Seismic Refraction Tomography (SRT) of 500m each in 29 grids (1 no, sounding per 5 m)(all the conditions mentioned in clause3.5 of RFP are inclusive in the item)and submission of factual report.Mobilisation of necessary equipnment,men & materials to the project site for carrying out the Geophysical Investigation and demobilisation of the same after completion of all the field works etc.

14500

-

-

... More
GEOTECHNICAL SURVEY

-

-

-

... More
Mobilisation & De-mobilsation of Rig machine to site required for drilling including installation and levelling of rig machine etc. Complete in all respect as per direction of Engineer incharge

58

-

-

... More
58 Bore hole using Tripple tube core barrel of 100 mm extended up to a depth of maximum 20 meter below ground level in all type of the soil including laterite/weathered soft rock using suitable approved method of boring including chesiling,cleaning,providing casing pipes as required or as directed; perfoming standard penetration test at every 1.5m interval down to required depth below ground level and at change of strata and at the depth however undisturbed soil samples could not be collected; Bore hole location shall be identified and shown to ULMMC officials prior to commencement(all the conditions mentioned in clause3.6 of RFP are inclusive in the item).

1160

-

-

... More
58 numbers of Core drilling (N×size) in rock upto a depth of maximum 5 meter, tripple tube core barrel with diamond bit including collection of core samples with TC/Diamond bits as per IS 6926-1996 RA 2001. Each run of the core drilling is to be properly recorded. The cores are to be carefully transferred to the core boxes, preserved, numbered and labelled properly. Cost of machinery,transportation and any other cost required to conduct the test are inclusive(all the conditions mentioned in clause3.6 of RFP are inclusive in the item).Mobilisation of necessary equipnment,men & materials to the project site for carrying out the Geotechnicall Investigation and demobilisation of the same after completion of all the field works etc..

116

-

-

... More
Hydrological Investigations as per clause 3.7 of TOR

1

-

-

... More
Details of Utility Services and Other Physical Features as per clause 3.10 of TOR

1

-

-

... More
Conduct Simplified Vulnerability Assessment (SVA) as per clause 3.11 of TOR

1

-

-

... More
Preperation of DPR

-

-

-

... More
Preparation of Detailed Project Report (DPR) for Comprehensive Topographic survey, geological Investigation, Geotechnical Investigations and Mitigation Works of Subsidence/ Toe Erosion/ Soil Erosion/ Subsidence for the Sustainable Safety of nainital city, Uttarakhand

-

-

-

... More
Monthly Remuniration cost of Geotechnical Engineer cum Team leader(K-1)

6

-

-

... More
Monthly Remuniration cost Geotechnical Engineer(K-2.1)

4

-

-

... More
Monthly Remuniration cost Geotechnical Engineer(K-2.2)

4

-

-

... More
Monthly Remuniration cost Geotechnical Engineer(K-2.3)

4

-

-

... More
Monthly Remuniration cost Geotechnical Engineer(K-2.4)

4

-

-

... More
Monthly Remuniration cost of Geological Expert(K-3.1)

2

-

-

... More
Monthly Remuniration cost of Geological Expert(K-3.2)

2

-

-

... More
Monthly Remuniration cost of structural Engineer(K-4.1)

4

-

-

... More
Monthly Remuniration cost of structural Engineer(K-4.2)

4

-

-

... More
Monthly Remuniration cost of structural Engineer(K-4.3)

4

-

-

... More
Monthly Remuniration cost of structural Engineer(K-4.4)

4

-

-

... More
Monthly Remuniration cost of structural Engineer(K-4.5)

4

-

-

... More
Monthly Remuniration cost of Environment Engineer(K-5.1)

3

-

-

... More
Monthly Remuniration cost of Environment Engineer(K-5.2)

3

-

-

... More
Monthly Remuniration cost of Social Expert(K-6.1)

3

-

-

... More
Monthly Remuniration cost of Social Expert(K-6.2)

3

-

-

... More
Monthly Remuniration cost of Geo-physicist(K-7.1)

3

-

-

... More
Monthly Remuniration cost of Geo-physicist(K-7.2)

3

-

-

... More
Monthly Remuniration cost of Surveyor(K-8.1)

3

-

-

... More
Monthly Remuniration cost of Surveyor(K-8.2)

3

-

-

... More
Monthly Remuniration cost of Surveyor(K-8.3)

3

-

-

... More
Monthly Remuniration cost of Surveyor(K-8.4)

3

-

-

... More
Monthly Remuniration cost of Hydrologist(K-9.1)

3

-

-

... More
Monthly Remuniration cost of Hydrologist(K-9.2)

3

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.