Bridge Ropeway Tunnel And Other Infrastructure Development Corporation Of Uttarakhand Limited Tender
View complete overview of Uttarakhand BRIDCUL Tender
Bridge Ropeway Tunnel And Other Infrastructure Development Corporation Of Uttarakhand Limited - BRIDCUL Tender
Civil And Construction
Building Construction
Eprocure
Opening Date31 Jan 2025
Closing Date13 Feb 2025
Tender Amount₹ 27,30,000
Costs
EMD
₹ 55,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_BRID3_79770_1Bid Award Id
ViewTender No
167/BRIDCUL/973/25 Dated 28.01.2025Tender Authority
Bridge Ropeway Tunnel And Other Infrastructure Development Corporation Of Uttarakhand Limited ViewPurchaser Address
-Website
http://uktenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
This includes all necessary accessories like LOP's with UP/DN buttons arrows, indicators, extension of guide rails, shaft wiring with trunking,travelling cables, main hoisting ropes/belts, & OSG rope landing doors with all accessories etc. necessary for the normal safe functioning of lift installation complete
-
-
-
... More
Full Collective control system.
-
-
-
... More
The Car and Landing Doors shall have vision panel covered with fire rated laminated glass, having punched Jali as a part of the door panel SS sheet itself.
-
-
-
... More
Other mechanical parts such as 'T' section adequate size guide rails for car & counter weight with brackets fasteners, counter weight frame with necessary blocks, buffers with necessary support arrangement, MS pit ladder etc. erected with necessary steel work
• Minor civil work for alteration if any and erection of door frames and accessories, erection buffers, erection of lift machinery, adequate size core cuts if required & scaffolding for erecting guide rails fixing of girders for mounting lift machine etc. complete as per specification no. LFT.
-
-
-
... More
General: - Job includes entire procedure of obtaining all necessary erection permissions & "License to Work the Lift" from Electrical Inspector (Lifts) with submission to the Engineer In Charge.
-
-
-
... More
Warrantee: - Job covers three years onsite warrantee for all the Lift parts with FCAMC as per the maintenance schedule.
-
-
-
... More
If the l ift shaft is greater than the required size of the lift as mentioned in relevant Indian Standard [with Amendments up to date], the provision of extra steel required for erecting supports of guide rails shall be made by the department as a separate item
-
-
-
... More
The Electric power supply of 415 volts, 3 phase 4 wire,50Hz shall be made available up to Lift controller, and as per the provisions laid down in relevant The Electricity Safety Regulations 2010[with Amendments up to date], Indian Standard, relevant Rules, the separate cables for lighting and power & shall be erected through lift shaft only with 2nos distinct earth connections from lift machine & controller
-
-
-
... More
The technical specification of Lift duty motor, control panel, brakes, guide rails, and guide shoes, lift car frame, car, counter weight and suspension, lift safety gear and governor, buffer, lift doors, locking device and contacts, lift wire rope of lifts shall be as per actual requirement of the job.
-
-
-
... More
For building having height of 15 mtr or more, lift shall meet the requirement of fireman lift as per the statutory requirements laid in relevant Indian Standard
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements