Bridge Ropeway Tunnel And Other Infrastructure Development Corporation Of Uttarakhand Limited Tender
View complete overview of Uttarakhand BRIDCUL Tender
Bridge Ropeway Tunnel And Other Infrastructure Development Corporation Of Uttarakhand Limited - BRIDCUL Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date26 Mar 2022
Closing Date7 Apr 2022
Tender Amount₹ 3,84,70,000
Costs
EMD
₹ 12,93,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_BRID3_42435_1Bid Award Id
ViewTender No
467/BRIDCUL/tender file/22 DATED 21.03.2022Tender Authority
Bridge Ropeway Tunnel And Other Infrastructure Development Corporation Of Uttarakhand Limited ViewPurchaser Address
-Website
http://http://bridcul.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.(Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately).
-
-
-
... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
904.5
-
-
... More
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete.
-
-
-
... More
Foundation, footing, bases of columns etc. for mass concrete
169.3
-
-
... More
Disposal of surplus earth by mechanical transport including loading, unloading for a lead upto 10.00 Km.
2412
-
-
... More
Centering and shuttering including strutting, propping etc. and removal of form for :
-
-
-
... More
R.C.C. WORK
-
-
-
... More
a) All kinds of soil
2475
-
-
... More
BRICK WORK
-
-
-
... More
Cement Concrete Pavement
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
472.5
-
-
... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:
-
-
-
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level.
-
-
-
... More
FINISHING
-
-
-
... More
Interlocking Concrete Block Pavement
6-7-1 Providing and Laying of Interlocking Concrete Block Pavements havingthickness 80 mm as per drawings and Technical Specification Clause 1504.
2810
-
-
... More
WBM Grading 2
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding
materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. By Mechanical Means
300
-
-
... More
1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
392.7
-
-
... More
CONCRETE WORK
-
-
-
... More
Centering and shuttering including strutting, propping etc. and removal of form for :Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
1781.3
-
-
... More
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed block, anchor blocks, plain window sills, fillets etc. upto floor five level, excluding the cost of centering, shuttering and finishing :
-
-
-
... More
For Grading I Material
450
-
-
... More
Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction
625
-
-
... More
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m..Ordinary Rock
540
-
-
... More
All works upto Plinth level
421.6
-
-
... More
1:6 (1 cement : 6 fine sand)
1893.5
-
-
... More
12 mm cement plaster of mix :
-
-
-
... More
1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
213.3
-
-
... More
a) Cement mortar 1:6 (1 cement : 6 coarse sand)
124.2
-
-
... More
All works above plinth level upto floor V level
466.3
-
-
... More
Thermo-Mechanically Treated bars
106542
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements